Valid

GB/T 33583-2025Technical specification for data acquisition of petroleum seismic exploration (English PDF)

石油地震勘探资料采集技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (52 pages)

Need quotation for your management?

Get a formal quotation for GB/T 33583-2025 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 5, 2025

Implementation date

May 1, 2026

Scope

GB/T 33583-2025 is the English-translated version of 石油地震勘探资料采集技术规范.

GB/T 33583-2025 is the Chinese standard "Technical specification for data acquisition of petroleum seismic exploration". Its scope clause reads: This document specifies the design, field construction, and quality inspection procedures for 2D and 3D petroleum seismic data acquisition in onshore, land-sea transition zones, and offshore areas.

Technical requirements for processes such as evaluation, data delivery and acceptance. This document applies to the entire process of acquiring 2D and 3D seismic data for petroleum exploration in onshore, water-land transition zones, and offshore areas.

Other engineering exploration projects can refer to this document. implement. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 33583-2025

National Standard of the People's Republic of China

ICS
75.180.10
Classification
E 11
Replacing
GB/T 33583-2017

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1.Scope
  • 2 Normative References
  • 3.Terms and Definitions
  • 4.Demonstration of Seismic Data Acquisition Project
  • 4.1 Basic Requirements
  • 4.2 Earthquake Deployment
  • 4.3 Seismic Acquisition Engineering Design Requirements
  • 4.4 Survey Line (Survey Network) Design
  • 5.Seismic data acquisition technology design 6.
  • 5.1 Data Collection
  • 5.2 Site reconnaissance
  • 5.3 Verification of Acquisition Parameters
  • 5.4 Near-surface survey and field static correction
  • 6.Experimental Work
  • 6.1 Basic Requirements
  • 6.2 Experimental Objective
  • 6.3 Test Content
  • 6.4 Experimental Design
  • 6.5 Test Procedure Requirements
  • 6.6 Data Analysis and Summary
  • 7.Seismic Data Acquisition Construction Requirements
  • 7.1 Health, Safety, and Environmental Protection
  • 7.2 Commencement and Acceptance
  • 7.3 Measurement Procedure
  • 7.4 Near-surface survey and field static correction procedures
  • 7.5 Activation Process
  • 7.6 Receiving Process
  • 7.7 Seismic data and auxiliary data inspection
  • 8.Quality Inspection Requirements and Data Evaluation
  • 8.1 Basic Regulations for Quality Inspection
  • 8.2 Inspection and Evaluation of Basic Measurement Data
  • 8.3 Seismic Excitation Quality Inspection
  • 8.4 Seismic Reception Quality Inspection
  • 8.5 Quality Inspection of Near-Surface Survey
  • 8.6 Indoor Quality Inspection
  • 8.7 Evaluation of the quality of original records
  • 8.8 Missed Shot Rate Assessment
  • 8.9 Finishing Shot Record Rating
  • 8.10 On-site processing quality inspection of raw data
  • 9.Data delivery
  • 9.1 Document Delivery Contents
  • 9.3 Earthquake Team Reference Data
  • 10 Seismic data acquisition project acceptance
  • 10.1 Project Site Acceptance
  • 10.2 Project Completion Acceptance
  • Appendix A (Normative) Design Parameters for Two-Dimensional Seismic Observation Systems
  • Appendix B (Normative) Design Parameters for Three-Dimensional Seismic Observation Systems
  • Appendix C (Normative) Receiver Parameters. Height Difference of the Same Channel Combination of Detectors
  • Appendix D (Informative) Instrument Class Report Format
  • Appendix E (Informative) Data Tape Reel Identification and Cartridge Identification
  • Appendix F (Informative) Auxiliary Data Storage Media, Small Refraction Records, Micrologging Record Identifiers
  • Appendix G (Informative) Controlled seismic source, air gun detection storage medium, on-site processing profile marking
  • Appendix H (Informative) Report on Micro-logging and Small Refraction Instruments

1 Scope

This document specifies the design, field construction, and quality inspection procedures for 2D and 3D petroleum seismic data acquisition in onshore, land-sea transition zones, and offshore areas.

Technical requirements for processes such as evaluation, data delivery and acceptance.

This document applies to the entire process of acquiring 2D and 3D seismic data for petroleum exploration in onshore, water-land transition zones, and offshore areas. Other engineering exploration projects can refer to this document.

implement.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.

For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.

This document.

GB 6722 Safety Regulations for Blasting

SY/T 5171 Specification for Onshore Petroleum Geophysical Exploration

SY/T 5391 General Technical Specification for Petroleum Seismic Data Acquisition Systems

SY/T 5769 Geophysical Exploration Location Data P1/11 Exchange Format

SY/T 6156 Technical Specification for the Use of Air Gun Vibration Source

SY/T 6276 Health, Safety and Environmental Management System for the Oil and Gas Industry

SY/T 6290 Seismic Exploration Auxiliary Data in SPS Format

SY/T 6349 Safety Management Standard for Petroleum Geophysical Seismic Teams

SY/T 6734 Inspection Items and Technical Specifications for Pulse Source Excitation Synchronization Systems in Onshore Seismic Exploration

SY/T 6839 Technical Specification for Positioning and Navigation in Marine Towed Cable Seismic Exploration

SY/T 7071 Inspection Items and Technical Specifications for Onshore Node Seismic Data Acquisition Systems

SY/T 7323 Technical Specification for Operation of Onshore Seismic Data Acquisition System

SY/T 7373 General Technical Specification for Digital Geophones in Onshore Seismic Exploration

SY/T 7449 General Technical Specification for Simulated Seismic Detectors

SY/T 7614 Technical Specification for Seismic Data Acquisition of Submarine Nodes

SY/T 7660 Technical Specification for Acquisition of P-wave Seismic Data on Land

SY/T 10015 Technical Specification for Offshore Towed Cable Seismic Data Acquisition Operations

SY/T 10017 Technical Specification for Seismic Data Acquisition of Submarine Cables

SY/T 10019 Technical Specification for Marine Satellite Positioning Measurement

SY/T 10026 Guidelines for the Calibration of Marine Seismic Data Acquisition, Location, and Auxiliary Equipment

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 Seismic survey

Generating seismic waves on the ground (or in seawater) and simultaneously receiving seismic waves reflected from underground, utilizing the acquired seismic data and underground media...

SY/T 7774 | GB/T 9711 | SY/T 6996 | GB/T 31456 | GB/T 18606 | […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 52 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 33583

EditionTitleRevisionStatus
GB/T 33583-2025Technical specification for data acquisition of petroleum seismic explorationcurrent editionCurrent
GB/T 33583-2017Technical specifications for seismic data acquisition on landprevious editionIn force

This page sells the current edition, GB/T 33583-2025. Earlier editions are listed for reference only.

How to Download GB/T 33583-2025

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
52 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 33583-2025

$695.00