NB/T Standards

Found: 3846 — page 75 of 81

Valid

NB/T 20133.4-2012 — Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants - Part 4: Determination of the Decontaminability of Coatings

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20133.5-2012 — Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants - Part 5: Standard Test Method for Chemical Resistance

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20133.6-2012 — Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants - Part 6: Coating Operation

Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid

NB/T 20134-2012 — Guidelines to Ensure Quality of Collected Data on Reliability of Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$105.0015 pages
Valid

NB/T 20135-2012 — General Guidelines for Reliability Data Exchange of Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid

NB/T 20136-2012 — Design Criterion for Radiation Controlled Area Access of Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid

NB/T 20137-2012 — Regulation for Staff Training of Radiation Protection in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$195.0015 pages
Valid

NB/T 20138-2012 — Individual Monitoring and Workplace Monitoring of Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$680.0043 pages
Valid

NB/T 20139-2012 — Technical Criteria for Environmental Radioactivity Background Investigation for Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid

NB/T 20140-2012 — Technical Specification for Radiation Protection of Nuclear Power Plants Siting

Industry·Recommended
Instant delivery (0–9 sec)
$525.0030 pages
Valid

NB/T 20141-2012 — Packaging, Transportation, Loading & Unloading and Storage of Fresh Fuel Assembly for PWR Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid

NB/T 20142-2012 — Guide for Chemical Decontamination of Primary Loop System and Components of PWR Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20143.1-2012 — Code on nuclear air and gas treatment - Process gas treatment - Part 1: Hydrogen recombiner

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20144-2012 — Initial Criticality Tests for Pressurized Water Reactor of Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$105.0015 pages
Valid

NB/T 20145-2012 — Compiling criteria of commissioning test procedures and reports for nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20146-2012 — Design Standard of Automatic Fire Alarm System of Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20147-2012 — Criteria for Physical Protection Systems for Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$435.0025 pages
Valid

NB/T 20148-2012 — Resistance Temperature Detectors Important to Safety in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid

NB/T 20149-2012 — Qualification Procedure for Pressure Transmitter Important to Safety of Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$485.0053 pages
Valid

NB/T 20150-2012 — Characteristics and Test Methods of Self-powered Neutron Detectors for Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$315.0018 pages
Valid

NB/T 20151-2012 — Guideline for Preparing Ageing Management Programme of Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid

NB/T 20152-2012 — Ageing Management Guideline of Piping in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$375.0021 pages
Valid

NB/T 20153-2012 — Ageing Management Guideline of Prestressed Concrete Containment in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$345.0020 pages
Valid

NB/T 20154-2012 — Guideline of Ageing Management for PWR Reactor Pressure Vessels

Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid

NB/T 20155-2012 — Aging Management on Class 1E Equipment Used in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$195.0015 pages
Valid

NB/T 20156-2012 — Requirement for Compilation and Optimization for Preventive Maintenance Program at Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20157-2012 — Quality Assurance Requirements for Construction of Nuclear Power Project

Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid

NB/T 20158-2012 — Specification for volute concrete construction of circulating water pumps of pressurized water reactor nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20159-2012 — The Construction Technical Specification for Liner of Reactor Building of PWR Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$315.0018 pages
Valid

NB/T 20160-2012 — The Technical Specification for Watertight Stainless Steel Liner of PWR Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid

NB/T 20161-2012 — Installation and Commissioning Technical Guideline for Ex-core Neutron Flux Measuring System for Pressurized Water Reactor of Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid

NB/T 20162-2012 — Technical Requirements on the Cleaning Areas Establishment and Maintenance of PWR Nuclear Island Equipment During Storage, Installation and Start-up

Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid

NB/T 20163-2012 — Qualification Procedure for Containment Spray Pump and Low Head Safety Injection Pump of Pressurized Water Reactor Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid

NB/T 20164-2012 — Qualification Procedure for Auxiliary Feed Water Motor-driven Pump of Pressurized Water Reactor Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20165-2012 — Qualification Procedure for Residual Heat Removal Pump of Pressurized Water Reactor Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid

NB/T 20166-2012 — Qualification Procedure for Charging Pump of Pressurized Water Reactor Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid

NB/T 20167-2012 — Qualification Procedure for Isolation Valve of Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid

NB/T 20168-2012 — Qualification Procedure for Check Valve of Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20169-2012 — Qualification procedure for turbine-driven auxiliary feedwater pump of pressurized water reactor nuclear power plant

Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid

NB/T 20170-2012 — Qualification Procedure of Safety Class Diesel-generator Units for Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid

NB/T 20171-2012 — Qualification Procedure for Safety Class 3 Pump of Pressurized Water Reactor Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20172-2012 — Technical rules for nuclear engineering surveying datum network establishment

Industry·Recommended
Instant delivery (0–9 sec)
$1,110.0061 pages
Valid

NB/T 20173-2012 — Technical Specification for Installation and Test of Ring Crane in Reactor Building of PWR Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$319.0015 pages
Valid

NB/T 20174-2012 — Technical Specification for Onsite Manufacture and Acceptance of Carbon Steel & Stainless Steel Tanks of PWR Nuclear Island

Industry·Recommended
Instant delivery (0–9 sec)
$239.0015 pages
Valid

NB/T 20175-2012 — Technical Specification for Installation and Acceptance of Fuel Handling and Storage System of PWR Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$399.0015 pages
Valid

NB/T 20176-2012 — Design requirements for hydrogen, nitrogen, oxygen and carbon dioxide supply systems of PWR nuclear power plant

Industry·Recommended
Instant delivery (0–9 sec)
$195.0015 pages
Valid

NB/T 20177-2012 — Design Criteria for Component Cooling Water System of Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid

NB/T 20178-2012 — Design Criteria of Nuclear Sampling System of Pressurized Water Reactor Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages