NB/T Standards
Found: 3846 — page 74 of 81
Valid
NB/T 20088-2012 — Requirements for the Replacement Parts and Components for Safety-class Equipment in Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid
NB/T 20089-2012 — Criteria for the protection of class 1E power systems and equipment in nuclear power plants
Industry·Recommended
Instant delivery (0–9 sec)
$495.0028 pages
Valid
NB/T 20090-2012 — Requirements for preoperational tests of class 1E power systems in nuclear power plants
Industry·Recommended
Instant delivery (0–9 sec)
$195.0015 pages
Valid
NB/T 20091-2012 — Inspection Guide for the Turbine of Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$500.0033 pages
Valid
NB/T 20092-2012 — Inspection Guide for the Moisture Separator Reheater of Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$470.0031 pages
Valid
NB/T 20093-2012 — Qualification of Safety-related Valve Actuators for Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$185.0016 pages
Valid
NB/T 20094-2012 — Containment Ventilation System of Pressurized Water Reactor Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$315.0018 pages
Valid
NB/T 20095-2012 — Design Criteria for HVAC Systems Located Outside Containment of PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$405.0023 pages
Valid
NB/T 20096-2012 — Failure Mode and Effects Analysis for System of Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$470.0031 pages
Valid
NB/T 20097-2012 — Concrete Containment Functional Design Requirements for PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$405.0023 pages
Valid
NB/T 20098-2012 — Design Criteria for Containment Hydrogen Control System of Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$105.0015 pages
Valid
NB/T 20099-2012 — Analysis requirements for loss-of-coolant accident of pressurized water reactor nuclear power plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20100-2012 — Requirements of overpressure analysis for reactor primary system and main steam system of pressurized water reactor nuclear power plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20101-2012 — Analysis Requirement for Rod Ejection Accidents of Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20102-2012 — Determination of Steady State Neutron Reaction Rate Distributions and Reactivity of Nuclear Reactors
Industry·Recommended
Instant delivery (0–9 sec)
$255.0015 pages
Valid
NB/T 20103-2012 — Accident Analysis and Safety Criteria for Pressurized Water Reactor Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$345.0020 pages
Valid
NB/T 20104-2012 — Analysis Requirement for Anticipated Transient without Scram on Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20105-2012 — Load Code for the Design of Nuclear Power Plants Building Structures
Industry·Recommended
Instant delivery (0–9 sec)
$145.0015 pages
Valid
NB/T 20106-2012 — Code for cooling water model simulation of nuclear power plant
Industry·Recommended
Instant delivery (0–9 sec)
$255.0015 pages
Valid
NB/T 20107-2012 — Technical Regulation for Construction of Reactor Coolant Pump Installation in PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$345.0020 pages
Valid
NB/T 20108-2012 — Technical Regulation of Containment Penetration Installation in PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$105.0015 pages
Valid
NB/T 20109-2012 — Technical Specification of Neutron Flux Guide Tube Installation in Reactor Building for PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid
NB/T 20110-2012 — Technical Regulation for Installation of PWR Nuclear Power Auxiliary System Equipment
Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid
NB/T 20111-2012 — General Technical Regulation of Safety-related Valves Installation in PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$105.0015 pages
Valid
NB/T 20112-2012 — Technical Regulation of the Cable Terminal Connection in the Reactor Building for PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid
NB/T 20113-2012 — Technical Regulation for Construction of HVAC Installation in PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$315.0018 pages
Valid
NB/T 20114-2012 — Technical regulation for installation of CRDM power supply system of pressurized water reactor nuclear power plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20115-2012 — Technical Regulation for Construction and Acceptance of Reactor Pressure Vessel Head Installation in PWR Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid
NB/T 20116-2012 — General requirements for informatization management of nuclear power plant construction projects
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20117-2012 — Prescriptions of Safety Management for Construction of Nuclear Power Project
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid
NB/T 20118-2012 — Regulation for Fire Protection for Nuclear Power Plants Construction
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20119-2012 — Material Item Management Requirements for Nuclear Power Engineering
Industry·Recommended
Instant delivery (0–9 sec)
$435.0025 pages
Valid
NB/T 20120-2012 — Management Provision for the Technology of Nuclear Power Engineering Construction
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20121-2012 — The Regulation for Editing Construction Organization Plan of Nuclear Power Project
Industry·Recommended
Instant delivery (0–9 sec)
$255.0015 pages
Valid
NB/T 20122-2012 — Checking-and-acceptance Management Provision for the Quality and the Hand-over of Nuclear Power Engineering Construction
Industry·Recommended
Instant delivery (0–9 sec)
$375.0021 pages
Valid
NB/T 20123-2012 — Standard for Division of Sub-section and Sub-project in Construction of Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$375.0021 pages
Valid
NB/T 20124-2012 — Code for Acceptance of Construction of Biological Shielding Concrete of PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid
NB/T 20125-2012 — Construction Specification of the Foundation Grouting for PWR Safety Important Facility
Industry·Recommended
Instant delivery (0–9 sec)
$195.0015 pages
Valid
NB/T 20126-2012 — Specifications for Construction and Acceptance of Caulking of PWR Nuclear Island Plant
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20127-2012 — Technical Requirements for Embedment Parts Manufacture and Installation of PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid
NB/T 20128-2012 — Specifications on Construction and Acceptance of Nuclear Island Foundation Pit
Industry·Recommended
Instant delivery (0–9 sec)
$255.0015 pages
Valid
NB/T 20129-2012 — General Technical Regulation for Installation, Test and Acceptance of Emergency Diesel Generator of Nuclear Island in Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$315.0018 pages
Valid
NB/T 20130-2012 — Concrete Radiation Shielding
Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid
NB/T 20131-2012 — Design Criteria for Emergency Core Cooling Sump of Pressurized Water Reactors Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$315.0018 pages
Valid
NB/T 20132-2012 — Design Requirements of Personnel Airlock for Containment in Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$105.0015 pages
Valid
NB/T 20133.1-2012 — Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants - Part 1: General Requirements
Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid
NB/T 20133.2-2012 — Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants. Part 2: Standard Test Method for Evaluating Coatings at Simulated Design Basis Accident (DBA) Conditions
Industry·Recommended
Instant delivery (0–9 sec)
$219.0015 pages
Valid
NB/T 20133.3-2012 — Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants - Part 3: Standard Test Method for Effects of Gamma Radiation
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages