Valid

GB/T 20319-2017Wind turbine generator systems—Specification for acceptance (English PDF)

风力发电机组 验收规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (23 pages)

Need quotation for your management?

Get a formal quotation for GB/T 20319-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

July 12, 2017

Implementation date

February 1, 2018

Scope

GB/T 20319-2017 is the English-translated version of 风力发电机组 验收规范.

GB/T 20319-2017 sets the general principles, content and methods for accepting a wind turbine after it has been installed, commissioned and connected to the grid, in two stages: pre-acceptance and final acceptance.

It lists the information to be available before each stage, the instruments, personnel and turbine condition required, when acceptance starts, what each stage checks, the conditions for passing and the documents to be produced.

Informative annexes give example pre-acceptance and final acceptance documents, methods for assessing the power curve and the operating data with reference indicators, and the inspection of high-strength bolts.

It applies to horizontal-axis wind turbines with a swept area above 200 m². It replaces GB/T 20319-2006, was issued on 12 July 2017 and has applied since 1 February 2018.

Found what you need?

Document preview — GB/T 20319-2017

National Standard of the People's Republic of China

ICS
27.180
Classification
F 11
Replacing
GB/T 20319-2006

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Acceptance conditions
  • 4.1 Pre-acceptance required information
  • 4.2 final acceptance before the required information
  • 4.3 instruments and personnel
  • 4.4 Unit status
  • 5 acceptance start
  • 6 acceptance content
  • 6.1 Pre-acceptance of content
  • 6.2 final acceptance content
  • 7 Acceptance of qualified conditions
  • 7.1 pre-acceptance of qualified conditions
  • 7.2 final acceptance of qualified conditions
  • 8 Acceptance of documents required
  • Appendix A (informative) Pre-acceptance document example
  • Appendix B (informative) final acceptance document example
  • Appendix C (informative) power curve assessment methods
  • Appendix D (informative) operational data assessment methods and reference indicators
  • Appendix E (Informative) High-strength bolt inspection

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

This standard replaces GB/T 20319-2006 "Acceptance Specification for Wind Turbine Generator." Compared with GB/T 20319-2006 main change As follows.

--- Modify the scope of the standard Chapter 1 (see Chapter 1, 2006 edition Chapter 1);

--- Added terms and definitions (see 3.1 ~ 3.7);

--- Increasing the conditions before acceptance (see 4.1, 4.2);

--- Added Chapter 5 acceptance started (see Chapter 5);

--- Revised the time required for trial operation and assessment indicators (see 6.1, 2006 Edition 4.3);

--- Modify the pre-acceptance inspection items and content (see 6.1, 2006 version 4.4);

--- Modify the final acceptance of the main contents (see 6.2, 2006 version 4.6);

--- Removed the measurement of grounding resistance (see.2006 version 5.3);

--- The provisions of the acceptance criteria based on the content of some of the acceptance method has been revised and moved into the appendix (see 6.1, 7.2, Appendix A, Appendix C, Appendix D, Appendix E);

--- Modify the acceptance of qualified conditions (see 7.1, 7.2, 2006 Edition 4.4,4.6);

--- Modify the acceptance document, and gives the file format for reference (see Chapter 8 and Appendix A, Appendix B, 2006 edition Chapter 6).

1 Scope

This standard specifies the general principles, contents and methods of pre-acceptance and final acceptance after the wind turbine is installed and commissioned for grid-connected power generation.

This standard applies to wind turbine swept area of more than 200m² horizontal axis wind turbine (referred to as "unit").

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 2900.53 Electrotechnical terminology wind turbine

GB/T 18451.2-2012 wind turbine power characteristics test

GB/T 19069 wind turbine controller technical conditions

GB/T 22516 wind turbine noise measurement method

GB/T 23479.1-2009 Wind turbine double-fed asynchronous generator Part 1: Technical conditions

GB/T 25387.1 Full power converter for wind turbines - Part 1: Technical conditions

GB/T 25388.1 wind turbine generator doubly-fed converter Part 1: Technical conditions

GB/T 25389.1-2010 Wind power generators low speed permanent magnet synchronous generators Part 1: Technical conditions

GB/T 25390 wind turbine ductile iron parts

GB/T 33225 wind turbine power test based on cabin anemometer method

GB/T 33628 wind turbine high strength bolt connection deputy installation technical requirements

Technical code of JGJ82 steel high strength bolt connection

IEC 61400-4:2012 Wind Turbine Gearbox Design Requirements (Windturbines-Part 4: Design requirementsforwindturbinegearboxes)

IEC TS61400-26-1 Wind Turbine Generators Part 26-1 Time-Based Wind Turbine Utilization (Wind Turbines-Part 26-1.Timebasedavailabilityfor windturbines)

IEC TS61400-26-2 Wind Turbines - Part 26-2 - Wind Turbine Utilization Based on Power Generation (Wind turbines-Part 26-2. Production-basedavailability for wind turbines)

VDI3834 non-direct-drive wind turbine and its components mechanical vibration measurement and evaluation [Blatt1/Part 1Measurementand evaluationofthemechanicalvibrationofwindenergyturbinesandtheircomponents (windenergytur-bineswithgearbox)]

3 Terms and definitions

GB/T 2900.53 defined and the following terms and definitions apply to this document.

3.1 Commissioning testing

Adjustment and test abbreviation. After the installation of the unit, according to the unit design documents and debugging outline regulation to adjust, set and a series of test workers For the general term.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 23 pages — is available in the English PDF.

Referenced standards

Normative references

GB/T 23479.1-2009 · IEC 61400-4:2012 · IEC TS61400-26-1 · IEC TS61400-26-2

Cited by

Similar standards

Editions of GB/T 20319

EditionTitleRevisionStatus
GB/T 20319-2017Wind turbine generator systems—Specification for acceptancecurrent editionCurrent
GB/T 20319-2006Wind turbine generator systems—Specification for acceptanceprevious editionSuperseded

This page sells the current edition, GB/T 20319-2017. Earlier editions are listed for reference only.

How to Download GB/T 20319-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
23 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 20319-2017

$355.00