GB/T 20319-2017Wind turbine generator systems—Specification for acceptance (English PDF)
风力发电机组 验收规范
This is a limited preview
Buy now to download the full PDF (23 pages)
Need quotation for your management?
Get a formal quotation for GB/T 20319-2017 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
July 12, 2017
Implementation date
February 1, 2018
Scope
GB/T 20319-2017 is the English-translated version of 风力发电机组 验收规范.
GB/T 20319-2017 sets the general principles, content and methods for accepting a wind turbine after it has been installed, commissioned and connected to the grid, in two stages: pre-acceptance and final acceptance.
It lists the information to be available before each stage, the instruments, personnel and turbine condition required, when acceptance starts, what each stage checks, the conditions for passing and the documents to be produced.
Informative annexes give example pre-acceptance and final acceptance documents, methods for assessing the power curve and the operating data with reference indicators, and the inspection of high-strength bolts.
It applies to horizontal-axis wind turbines with a swept area above 200 m². It replaces GB/T 20319-2006, was issued on 12 July 2017 and has applied since 1 February 2018.
Found what you need?
Document preview — GB/T 20319-2017
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F 11
- Replacing
- GB/T 20319-2006
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Acceptance conditions
- 4.1 Pre-acceptance required information
- 4.2 final acceptance before the required information
- 4.3 instruments and personnel
- 4.4 Unit status
- 5 acceptance start
- 6 acceptance content
- 6.1 Pre-acceptance of content
- 6.2 final acceptance content
- 7 Acceptance of qualified conditions
- 7.1 pre-acceptance of qualified conditions
- 7.2 final acceptance of qualified conditions
- 8 Acceptance of documents required
- Appendix A (informative) Pre-acceptance document example
- Appendix B (informative) final acceptance document example
- Appendix C (informative) power curve assessment methods
- Appendix D (informative) operational data assessment methods and reference indicators
- Appendix E (Informative) High-strength bolt inspection
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard replaces GB/T 20319-2006 "Acceptance Specification for Wind Turbine Generator." Compared with GB/T 20319-2006 main change As follows.
--- Modify the scope of the standard Chapter 1 (see Chapter 1, 2006 edition Chapter 1);
--- Added terms and definitions (see 3.1 ~ 3.7);
--- Increasing the conditions before acceptance (see 4.1, 4.2);
--- Added Chapter 5 acceptance started (see Chapter 5);
--- Revised the time required for trial operation and assessment indicators (see 6.1, 2006 Edition 4.3);
--- Modify the pre-acceptance inspection items and content (see 6.1, 2006 version 4.4);
--- Modify the final acceptance of the main contents (see 6.2, 2006 version 4.6);
--- Removed the measurement of grounding resistance (see.2006 version 5.3);
--- The provisions of the acceptance criteria based on the content of some of the acceptance method has been revised and moved into the appendix (see 6.1, 7.2, Appendix A, Appendix C, Appendix D, Appendix E);
--- Modify the acceptance of qualified conditions (see 7.1, 7.2, 2006 Edition 4.4,4.6);
--- Modify the acceptance document, and gives the file format for reference (see Chapter 8 and Appendix A, Appendix B, 2006 edition Chapter 6).
1 Scope
This standard specifies the general principles, contents and methods of pre-acceptance and final acceptance after the wind turbine is installed and commissioned for grid-connected power generation.
This standard applies to wind turbine swept area of more than 200m² horizontal axis wind turbine (referred to as "unit").
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2900.53 Electrotechnical terminology wind turbine
GB/T 18451.2-2012 wind turbine power characteristics test
GB/T 19069 wind turbine controller technical conditions
GB/T 22516 wind turbine noise measurement method
GB/T 23479.1-2009 Wind turbine double-fed asynchronous generator Part 1: Technical conditions
GB/T 25387.1 Full power converter for wind turbines - Part 1: Technical conditions
GB/T 25388.1 wind turbine generator doubly-fed converter Part 1: Technical conditions
GB/T 25389.1-2010 Wind power generators low speed permanent magnet synchronous generators Part 1: Technical conditions
GB/T 25390 wind turbine ductile iron parts
GB/T 33225 wind turbine power test based on cabin anemometer method
GB/T 33628 wind turbine high strength bolt connection deputy installation technical requirements
Technical code of JGJ82 steel high strength bolt connection
IEC 61400-4:2012 Wind Turbine Gearbox Design Requirements (Windturbines-Part 4: Design requirementsforwindturbinegearboxes)
IEC TS61400-26-1 Wind Turbine Generators Part 26-1 Time-Based Wind Turbine Utilization (Wind Turbines-Part 26-1.Timebasedavailabilityfor windturbines)
IEC TS61400-26-2 Wind Turbines - Part 26-2 - Wind Turbine Utilization Based on Power Generation (Wind turbines-Part 26-2. Production-basedavailability for wind turbines)
VDI3834 non-direct-drive wind turbine and its components mechanical vibration measurement and evaluation [Blatt1/Part 1Measurementand evaluationofthemechanicalvibrationofwindenergyturbinesandtheircomponents (windenergytur-bineswithgearbox)]
3 Terms and definitions
GB/T 2900.53 defined and the following terms and definitions apply to this document.
3.1 Commissioning testing
Adjustment and test abbreviation. After the installation of the unit, according to the unit design documents and debugging outline regulation to adjust, set and a series of test workers For the general term.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 23 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2900.53Electrotechnical terminology -- Wind turbine generator systems
- GB/T 18451.2-2012Wind energy generation systems - Power performance measurements of electricity producing wind turbines
- GB/T 19069Stall regulation wind turbines - Control system - Technical condition
- GB/T 22516Wind turbine generators systems -- Acoustic noise measurement techniques
- GB/T 25387.1Wind turbines generator system—Full-power converter—Part 1:Technical condition
- GB/T 25388.1Wind turbines generator system - Double-fed converter - Part 1: Technical condition
GB/T 23479.1-2009 · IEC 61400-4:2012 · IEC TS61400-26-1 · IEC TS61400-26-2
Cited by
- GB/T 19568-2025Wind energy generation systems - Assembling and installation specification of wind turbines
- GB/T 46785-2025Wind energy generation systems - Desert and gobi wind turbines
- GB/T 41512-2022Distributed wind energy generation systems
- RB/T 080-2021Guidelines for acceptance for terminal integrated multi-energy complementary energy system
- NB/T 10206-2019Guide for preparation of wind turbine bidding documents
- NB/T 10217-2019Guide of production preparation for wind farm
Similar standards
Editions of GB/T 20319
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 20319-2017 | Wind turbine generator systems—Specification for acceptance | current edition | Current |
| GB/T 20319-2006 | Wind turbine generator systems—Specification for acceptance | previous edition | Superseded |
This page sells the current edition, GB/T 20319-2017. Earlier editions are listed for reference only.
How to Download GB/T 20319-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 19069-2017 — Stall regulation wind turbines - Control system - Technical condition
GB/T 22516-2015 — Wind turbine generators systems -- Acoustic noise measurement techniques
GB/T 25387.1-2021 — Wind turbines generator system—Full-power converter—Part 1:Technical condition
Secure payment via Stripe
Payments accepted
GB/T 20319-2017
$355.00