Valid

GB/T 31997-2015Codes of construction acceptance on wind power plant project (English PDF)

风力发电场项目建设工程验收规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 31997-2015 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

September 11, 2015

Implementation date

April 1, 2016

Scope

GB/T 31997-2015 is the English-translated version of 风力发电场项目建设工程验收规程.

GB/T 31997-2015 sets codes for the construction acceptance of wind power plant projects. It gives the main technical requirements for acceptance of the wind farm's units on completion, the starting of the booster station, the handover of the project for production, and the completion acceptance of the whole project.

It applies to the acceptance of new-build and extension wind farm construction projects. Its normative references include GB/T 20319, many GB 50xxx construction codes, DL/T standards for electric power works and NB/T 31021.

Issued on 11 September 2015 and applicable from 1 April 2016, it does not replace an earlier edition.

Found what you need?

Document preview — GB/T 31997-2015

National Standard of the People's Republic of China

ICS
27.180
Classification
F 11

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules.

1 Scope

This standard specifies the wind farm project completion acceptance unit, booster station starts, the transfer of production engineering acceptance and completion of the project acceptance The main technical requirements.

This standard applies to new construction, expansion of wind farm construction project acceptance.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 20319 wind turbine acceptance

GB 50147 electrical high-voltage electrical equipment installation engineering construction and acceptance

GB 50148 electric equipment installation of power transformers, oil reactors, transformers for construction and acceptance

GB 50149 electric equipment installation engineering construction and acceptance of bus arrangement

GB 50150 works of electrical installations electrical equipment handover test standard

GB 50168 electric equipment installation engineering construction and acceptance of cable lines

GB 50169 electric equipment installation engineering construction and acceptance of grounding devices

GB 50171 electric equipment installation engineering cubicle and secondary circuit wiring for construction and acceptance

GB 50172 electric equipment installation engineering construction and acceptance of battery

GB 50173 works of electrical installations 66kV and below overhead power line construction and acceptance

GB 50202 foundation engineering foundation construction quality acceptance Construction Quality Acceptance GB 50203 masonry structure specification

GB 50204 Construction Quality Acceptance of Concrete Structure Engineering

GB 50205 Steel Engineering Construction Quality Acceptance

GB 50210 Building Decoration Engineering Quality Acceptance

GB 50233 110 ~ 500kV overhead transmission line construction and acceptance Construction Quality

GB 50242 Building Water and Heating Engineering acceptance

GB 50254 electrical low-voltage electrical equipment installation engineering construction and acceptance

GB 50300 Construction Quality Acceptance of uniform standards Building Construction Quality

GB 50303 Electrical Projects

DL/T 782 110kV and above Transmission and Distribution Project start and completion and acceptance procedures

DL/T 995 relay protection and automatic device grid security inspection procedures

DL/T 5161 (all parts), electrical equipment installation engineering quality inspection and assessment procedures

DL/T 5168 110kV ~ 500kV overhead power line quality and assessment procedures Construction

DL/T 5210.1 power construction construction quality inspection and evaluation procedures - Part 1. civil engineering

JTGB 01 highway engineering standard

NB/T 31021 wind TECHNOLOGY filing and finishing specifications

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Normative references

GB 50169 · GB 50171 · GB 50172 · GB 50254 · GB 50303 · DL/T 5161 · DL/T 5210.1

Similar standards

How to Download GB/T 31997-2015

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 31997-2015

$95.00