GB/T 19568-2025Wind energy generation systems - Assembling and installation specification of wind turbines (English PDF)
风能发电系统 风力发电机组装配和安装规范
Open the GB/T 19568-2025 preview as PDF
This is a limited preview
Buy now to download the full PDF (25 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 31, 2025
Implementation date
May 1, 2026
Scope
GB/T 19568-2025 is the English-translated version of 风能发电系统 风力发电机组装配和安装规范.
GB/T 19568-2025 is the Chinese national standard covering erecting a turbine - the receipt and storage of the components, the pre-assembly on the ground, the lift sequence and the wind limits for each stage, the alignment and the connections, and the commissioning checks before the machine is handed over. It replaces GB/T 19568-2017, with the fastener installation standard GB/T 33628-2025. In force from 1 May 2026. Issued on 31 October 2025, it has been in force since 1 May 2026, replacing GB/T 19568-2017.
Document preview — GB/T 19568-2025
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F 11
- Replacing
- GB/T 19568-2017
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1.Scope1
- 2 Normative References1
- 3.Terms and Definitions1
- 4.General Requirements1
- 4.1 General Requirements1
- 4.2 Connection Requirements2
- 5.Assembly requirements for key components3
- 5.1 Spindle bearing assembly3
- 5.2 Transmission Chain Assembly4
- 5.3 Assembly of yaw and pitch bearings and yaw gear ring5
- 5.4 Brake Assembly5
- 5.6 Elastic support assembly6
- 5.7 Transmission Chain Assembly6
- 5.8 Generator Assembly (Flexible Coupling)7
- 5.9 High-speed shaft coupling7
- 5.10 Hydraulic and Lubrication System Assembly7
- 5.11 Assembly of nacelle cover and wheel hub cover7
- 6 Wind farm installation requirements8
- 6.1 Safety Requirements8
- 6.2 Installation personnel requirements8
- 6.3 Installation site requirements8
- 6.4 Installation Requirements for Key Components in Wind Farms9
- 7.Inspection Requirements15
- 17 Appendix C (Normative) Method for Inspecting Bolt Tightness21
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part
1.Structure and Drafting Rules of Standardization Documents". Drafting. This document replaces GB/T 19568-2017 "Specifications for Assembly and Installation of Wind Turbine Generator Sets". Compared with GB/T 19568-2017, Apart from structural adjustments and editorial changes, the main technical changes are as follows:
a) The "General Requirements" have been changed (see 4.1.4, 4.1.6, 4.1.7, 4.1.8, and
3.1 in the.2017 version);
b) The requirements for screw, bolt, and stud connections have been changed (see 4.2.1.1~4.2.1.3, 4.2.1.5, and
3.2.1 in the.2017 version);
c) Added installation requirements for ring groove rivet connections (see 4.2.6);
d) The content of "Main Bearing Housing Composition and Gearbox Assembly" has been changed to "Transmission Chain Assembly" requirements (see 5.2,.2017 version). 3.3.2);
e) The content of "Yaw and pitch bearing assembly" has been changed to "Yaw, pitch bearing, and yaw gear assembly" (see 5.3). (Version 3.3.3,.2017)
f) Assembly requirements for passive mechanical brakes and hydraulic gearbox elastic supports have been added (see
5.4.2 and 5.6.2);
g) Increased requirements for generator assembly (see 5.8);
h) Security requirements have been changed (see 6.1,
4.1 in the.2017 version);
1 Scope
GB/T 19568-2025 is the Chinese national standard covering erecting a turbine - the receipt and storage of the components, the pre-assembly on the ground, the lift sequence and the wind limits for each stage, the alignment and the connections, and the commissioning checks before the machine is handed over. It replaces GB/T 19568-2017, with the fastener installation standard GB/T 33628-2025. In force from 1 May 2026. Issued on 31 October 2025, it has been in force since 1 May 2026, replacing GB/T 19568-2017.
This document specifies the general requirements for the assembly and installation of wind turbine generator sets, the assembly requirements for key components, the installation requirements for wind farms, and the inspection requirements. Seek and verify the method. This document applies to the assembly and installation of wind turbine generator sets.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included. For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies. This document.
GB/T 9327-2008 Crimp and mechanical connections for conductors of power cables with rated voltage of 35kV (Um=40.5kV) and below Fittings Testing Methods and Requirements
GB/T 19072 Wind Turbine Generator Tower
GB/T 20319 Acceptance Specification for Wind Turbine Generator Sets
GB/T 33628 Technical requirements for the installation of high-strength threaded connections in wind turbine generator sets
GB/T 37898 Safety Technical Specification for Lifting Wind Turbine Generator Sets DL/T 796 Safety Regulations for Wind Power Plants
3 Terms and Definitions
This document does not contain any terms or definitions that need to be defined.
4.1 General Requirements
4.1.1 All personnel involved in assembly should undergo three levels of safety education and on-the-job skills training. Those in special trades (crane operators, special equipment operators) should hold relevant certificates. Only those with the corresponding qualification certificates are allowed to work, and operators of key processes and special processes must be trained and qualified before they can work.
4.1.2 Before assembly, all parts should be inspected to ensure that their models and specifications meet the requirements of the configuration list.
4.1.3 Before assembly, the parts entering the assembly area should be inspected. Assembly can only proceed if they meet the following requirements.
a) It bears a certificate of conformity after passing inspection;
b) Review the main mating dimensions and part numbers of key components and record them in the warranty card;
c) The mating dimensions adjusted by the fitter shall be re-inspected by the quality inspection department of the complete machine manufacturer and recorded in the warranty card.
4.1.4 Each assembly process should have an assembly process control card, which should be recorded and stored in the wind turbine generator set file.
4.1.5 Parts should be cleaned or washed before assembly and should be free of burrs, flaked edges, scale, rust, chips, oil, colorants, and dust. Before assembly, sharp corners or high points on mating surfaces should be trimmed. Unless otherwise specified, sharp corners and edges of parts should be rounded off before assembly. (Assembly process...)
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 25 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 19072Wind turbines - Tower
- GB/T 20319Wind turbine generator systems—Specification for acceptance
- GB/T 33628Wind energy generation systems - Technical requirements for installation of high-strength threaded fasteners of wind turbines
- GB/T 37898Wind turbines—Safety technical regulation for hoisting
GB/T 9327-2008
Editions of GB/T 19568
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 19568-2025 | Wind energy generation systems - Assembling and installation specification of wind turbines | current edition | Current |
| GB/T 19568-2017 | Wind turbines -- Assembling and installation regulation | previous edition | In force |
| GB/T 19568-2004 | Assembling and installation regulation for wind turbine generator systems | previous edition | Obsolete |
This page sells the current edition, GB/T 19568-2025. Earlier editions are listed for reference only.
How to Buy GB/T 19568-2025
- 1Add to cart. Click the "Buy GB/T 19568-2025" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 19072-2022 — Wind turbines - Tower
GB/T 20319-2017 — Wind turbine generator systems—Specification for acceptance
GB/T 33628-2025 — Wind energy generation systems - Technical requirements for installation of high-strength threaded fasteners of wind turbines
Secure payment via Stripe
Payments accepted
GB/T 19568-2025
$455.00