Browse Standards

Found: 84897 — page 1153 of 1769

Valid

NB/T 20065-2012 — Installation and Arrangement Requirement for Transducer and Transmitter Important to Safety in Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$200.0015 pages
Valid

NB/T 20066-2012 — The Design Criteria for Nuclear Power Plants Station Blackout

Industry·Recommended
Instant delivery (0–9 sec)
$350.0020 pages
Valid

NB/T 20067-2012 — Identification for Safety Class Equipment in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$170.0015 pages
Valid

NB/T 20068-2012 — Requirements for Coping with Common Cause Failure (CCF) of Instrumentation and Control Systems Important to Safety in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$260.0015 pages
Valid

NB/T 20069-2012 — Performance Monitoring Test of Instrumentation Channels Important to Safety in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$350.0020 pages
Valid

NB/T 20070-2012 — Criteria for Design, Installation, and Qualification of Raceway Systems for Class 1E Circuits in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$410.0023 pages
Valid

NB/T 20071-2012 — Requirements for Electrical Supplies of Instrumentation and Control Systems Important to Safety in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$130.0015 pages
Valid

NB/T 20072-2012 — Determination and Maintenance of Trip Setpoints for Instrumentation of Safety Systems in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$260.0015 pages
Valid

NB/T 20073-2012 — Criterion for Instrumentation and Control Equipment Grounding in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$190.0016 pages
Valid

NB/T 20074-2012 — Qualification of Class 1E Motor Control Centers for Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$440.0025 pages
Valid

NB/T 20075-2012 — Protection Provided by Electrical Equipment Against External Impact for Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$110.0015 pages
Valid

NB/T 20076-2012 — Earthquake Instrumentation Criteria for Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$200.0015 pages
Valid

NB/T 20077-2012 — Criteria for the Handling and Initial Evaluation of Records from Nuclear Power Plants Seismic Instrumentation

Industry·Recommended
Instant delivery (0–9 sec)
$170.0015 pages
Valid

NB/T 20078-2012 — Qualification Procedure for Safety-related Pneumatic Control Valve of Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$260.0015 pages
Valid

NB/T 20079-2012 — Qualification Procedure for Safety-class Electric Actuators Applied in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$350.0020 pages
Valid

NB/T 20080-2012 — Qualification of Class 1E Lead Storage Batteries for Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$200.0015 pages
Valid

NB/T 20081-2012 — Qualification Procedure for Class 1E Transformer Applied in Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$200.0015 pages
Valid

NB/T 20082-2012 — Qualification Procedure for Safety-class Diesel-generator Applied as Standby Power Supplies for Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$260.0015 pages
Valid

NB/T 20083-2012 — Criteria for Lubricating Oil Systems Design for Emergency Diesel Generator of Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$200.0015 pages
Valid

NB/T 20084-2012 — Qualification procedure for safety class residual heat removal pump motors applied in nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$230.0015 pages
Valid

NB/T 20085-2012 — Qualification Procedure for Safety Class High-voltage Switchboard Applied in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$230.0015 pages
Valid

NB/T 20086-2012 — Assessing, Monitoring, and Mitigating Aging Effects on Class 1E Equipment Used in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$830.0046 pages
Valid

NB/T 20087-2012 — Aging Management Guidance for Instrument and Control Cables Important to Safety for Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$590.0033 pages
Valid

NB/T 20088-2012 — Requirements for the Replacement Parts and Components for Safety-class Equipment in Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$230.0015 pages
Valid

NB/T 20089-2012 — Criteria for the protection of class 1E power systems and equipment in nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$500.0028 pages
Valid

NB/T 20090-2012 — Requirements for preoperational tests of class 1E power systems in nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$200.0015 pages
Valid

NB/T 20091-2012 — Inspection Guide for the Turbine of Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$590.0033 pages
Valid

NB/T 20092-2012 — Inspection Guide for the Moisture Separator Reheater of Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$560.0031 pages
Valid

NB/T 20093-2012 — Qualification of Safety-related Valve Actuators for Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$190.0016 pages
Valid

NB/T 20094-2012 — Containment Ventilation System of Pressurized Water Reactor Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$320.0018 pages
Valid

NB/T 20095-2012 — Design Criteria for HVAC Systems Located Outside Containment of PWR Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$410.0023 pages
Valid

NB/T 20096-2012 — Failure Mode and Effects Analysis for System of Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$560.0031 pages
Valid

NB/T 20097-2012 — Concrete Containment Functional Design Requirements for PWR Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$410.0023 pages
Valid

NB/T 20098-2012 — Design Criteria for Containment Hydrogen Control System of Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$110.0015 pages
Valid

NB/T 20099-2012 — Analysis requirements for loss-of-coolant accident of pressurized water reactor nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$140.0015 pages
Valid

NB/T 20100-2012 — Requirements of overpressure analysis for reactor primary system and main steam system of pressurized water reactor nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$140.0015 pages
Valid

NB/T 20101-2012 — Analysis Requirement for Rod Ejection Accidents of Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$140.0015 pages
Valid

NB/T 20102-2012 — Determination of Steady State Neutron Reaction Rate Distributions and Reactivity of Nuclear Reactors

Industry·Recommended
Instant delivery (0–9 sec)
$260.0015 pages
Valid

NB/T 20103-2012 — Accident Analysis and Safety Criteria for Pressurized Water Reactor Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$350.0020 pages
Valid

NB/T 20104-2012 — Analysis Requirement for Anticipated Transient without Scram on Pressurized Water Reactor Nuclear Power Plants

Industry·Recommended
Instant delivery (0–9 sec)
$140.0015 pages
Valid

NB/T 20105-2012 — Load Code for the Design of Nuclear Power Plants Building Structures

Industry·Recommended
Instant delivery (0–9 sec)
$150.0015 pages
Valid

NB/T 20106-2012 — Code for cooling water model simulation of nuclear power plant

Industry·Recommended
Instant delivery (0–9 sec)
$260.0015 pages
Valid

NB/T 20107-2012 — Technical Regulation for Construction of Reactor Coolant Pump Installation in PWR Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$350.0020 pages
Valid

NB/T 20108-2012 — Technical Regulation of Containment Penetration Installation in PWR Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$110.0015 pages
Valid

NB/T 20109-2012 — Technical Specification of Neutron Flux Guide Tube Installation in Reactor Building for PWR Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$170.0015 pages
Valid

NB/T 20110-2012 — Technical Regulation for Installation of PWR Nuclear Power Auxiliary System Equipment

Industry·Recommended
Instant delivery (0–9 sec)
$290.0016 pages
Valid

NB/T 20111-2012 — General Technical Regulation of Safety-related Valves Installation in PWR Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$110.0015 pages
Valid

NB/T 20112-2012 — Technical Regulation of the Cable Terminal Connection in the Reactor Building for PWR Nuclear Power Plant

Industry·Recommended
Instant delivery (0–9 sec)
$170.0015 pages