Valid

GB/T 19570-2017Engineering technical spicification for sewage pipeline discharging into the sea (English PDF)

污水排海管道工程技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (17 pages)

Need quotation for your management?

Get a formal quotation for GB/T 19570-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 29, 2017

Implementation date

July 1, 2018

Scope

GB/T 19570-2017 is the English-translated version of 污水排海管道工程技术规范.

GB/T 19570-2017 is the Chinese engineering specification for pipelines that discharge sewage into the sea. It sets the technical requirements for the route survey and the selection of the pipeline route, for the discharge pipe and its diffuser, including their design and construction, and for the mixing zone that forms in the sea around the outfall.

It defines terms such as route survey and sewage pipeline discharging into the sea, and an annex explains the Brooks formula used for the further dilution of the pollution plume.

It applies to sewage outfall pipeline projects, and projects built abroad by Chinese organisations may refer to it. It replaces GB/T 19570-2004, was issued on 29 December 2017 and has applied since 1 July 2018.

Found what you need?

Document preview — GB/T 19570-2017

National Standard of the People's Republic of China

ICS
07.060; 13.030.99
Classification
Z 66
Replacing
GB/T 19570-2004

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 General
  • 5 route survey and selection
  • 6 discharge tube and diffuser
  • 7 sewage row sea mixed area
  • Appendix A (informative) Brooks formula derivation process and application conditions (for re-dilution of pollution plume formula)
  • References

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

This standard replaces GB/T 19570-2004 "Sewage Displacement Pipeline Engineering Specifications." This standard and GB/T 19570-2004 phase Comparison, in addition to editorial changes outside the main technical changes are as follows.

--- Increase "surge wells" terms and definitions (see 3.3);

--- Increase "First of all, the area where the mixed zone formed by sewage discharge is located must be defined, and more than two outfalls And their mixed area and comparison "(see 5.1.3);

--- Modify the engineering geophysical requirements (see 5.2.5, 2004 edition of 5.1.4.4);

--- Adjust the "Chapter 6, Chapter 7 of the order" (see Chapter 6 and Chapter 7, 2004 edition Chapter 6 and Chapter 7);

--- Revised "pipe design temperature range" (see 6.2.4, 2004 edition of 7.2.4);

--- Increase "should adopt high-quality materials and environmental protection of pipe, such as steel pipe and continuous winding glass tube" (see 6.2.9);

--- Increase the discovery of pipeline rupture, should open the emergency vent or effective implementation of the sewage diversion content (see 6.2.29);

--- Increase "coating materials should meet the environmental requirements" (see 6.4.2);

--- Increase "units involved in the construction of large-scale pipeline projects should have the relevant qualifications required by the ministries" (see 6.5.1);

--- Increase the "construction phase should have qualified supervision unit requirements" (see 6.5.2);

--- Increase "the main equipment used in the measurement and laying pipe stinger should be inspected by the statutory quality inspection department, and have a certificate book. Escalator should have spare parts "(see 6.5.2);

--- Increase "submarine pipeline laying, should be along the route sweep the sea, such as the discovery of seafloor reefs should be carried out first blasting or blasting" (See 6.5.3);

--- Increasing the pipe welding process and accuracy should meet the GB/T 50268-2008 specification requirements (see 6.5.10);

--- Increase the sewage row of sea pipeline construction in the sea temperature or stress changes in the sea should be used telescopic section to protect the pipeline (See 6.5.15);

--- Increasing the initial dilution data should be submitted by the SEPA Marine Environmental Assessment Unit (see 7.10);

--- Increase should be carried out sewage and initial dilution and mixing area water quality monitoring (see 7.19).

Introduction

In recent years, with the vigorous development of China's coastal economy, the living standards of the people have rapidly risen. In particular, opening up and science and technology substantially Ascending the masses to pay more attention to environmental protection, awareness and level of environmental protection significantly improved. The original norms can not adapt to the new situation need. The revised norms will pay more attention to the wishes of the people, in order to protect the marine environment for the purpose of the route survey, sewage drainage sea mixed area Investigation and sewage on the marine environment pollution control and pipeline design, construction, etc., to carry out more effective guidance to promote China's sewage pipe Road engineering technology continues to improve, a substantial increase in the level of marine environmental protection.

1 Scope

This standard specifies the Sewage Disposal of the sea route engineering survey and selection of routes, sewage and sea mixed area, pipeline design and construction and other technologies Claim.

This standard applies to sewage row of sea pipeline project, by our country's foreign sewage row of sea pipeline project construction can refer to use.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document.

GB 3097 seawater quality standards

GB/T 12763.2 Marine survey code - Part 2: Ocean hydrological observations

GB/T 12763.3 Marine survey code - Part 3: Marine meteorological observations

GB/T 12763.6 Marine survey code - Part 6: Marine life survey

GB/T 12763.8 Marine survey code - Part 8: Marine geophysical survey

GB/T 14914 seaside observing norms

GB 17378.4 Marine monitoring code - Part 4: Sea water analysis

GB 17378.5 Marine monitoring code - Part 5: Sediment analysis

GB 17378.6 Marine monitoring code - Part 6: Organism analysis

GB 17378.7 Marine monitoring code - Part 7: Coastal pollution ecological survey and biological monitoring

GB 17501-1998 Specification for oceanographic topographic survey

Submarine cable pipe routing survey specification

GB 18421 Marine biological quality

Sewage and marine disposal project pollution control standards

Town sewage treatment plant pollutant discharge standards

GB/T 19485-2014 Technical Guidelines for Environmental Impact Assessment of Marine Engineering

Specification for construction and acceptance of water supply and drainage pipelines

JTS 145-2015 Hydrological specifications for ports and waterways

Submarine Pipeline System

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Route Survey

Surveys of the state of the marine environment and marine development activities from the start to the end of the submarine pipeline corridor.

3.2 Sewage to the sea pipe

Laying in the sea for the discharge of sewage pipes.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 19570

EditionTitleRevisionStatus
GB/T 19570-2017Engineering technical spicification for sewage pipeline discharging into the seacurrent editionCurrent
GB/T 19570-2004Engineering technical spicification for sewage pipeline discharging into the seaprevious editionSuperseded

This page sells the current edition, GB/T 19570-2017. Earlier editions are listed for reference only.

How to Download GB/T 19570-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
17 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 19570-2017

$295.00