GB/T 19485-2014Technical guidelines for environmental impact assessment of marine engineering (English PDF)
海洋工程环境影响评价技术导则
This is a limited preview
Buy now to download the full PDF (73 pages)
Need quotation for your management?
Get a formal quotation for GB/T 19485-2014 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 27, 2014
Implementation date
October 1, 2014
Scope
GB/T 19485-2014 is the English-translated version of 海洋工程环境影响评价技术导则.
GB/T 19485-2014 is the Chinese standard "Technical guidelines for environmental impact assessment of marine engineering". Its scope clause reads: This standard specifies a marine construction project environmental impact assessment procedures, evaluation of the content, technology and methods report (form) the preparation and Requirements.
This standard applies to the environmental impact of water, territorial waters and internal waters under the jurisdiction of other marine construction projects in the People's Republic of China Evaluation; regional marine environmental impact assessment, environmental impact assessment review of the marine environmental impact assessment and other sea-related construction projects can participate According to the Executive. Its clauses include terms and definitions; general.
Found what you need?
Document preview — GB/T 19485-2014
National Standard of the People's Republic of China
- ICS
- 07.060
- Classification
- Z 04
- Replacing
- GB/T 19485-2004
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 General
- 4.1 Marine Environmental Impact Assessment Outcome
- 4.2 marine engineering environmental impact assessment stage
- 4.3 Marine Environmental Impact Assessment work program
- 4.4 Environmental Impact Assessment marine engineering content and scope
- 4.5 Marine Environmental Impact Assessment Grade
- 4.6 Evaluation Criteria
- 4.7 oceanographic survey and monitoring data
- 4.8 Environmental Investigation
- 4.9 Environmental Status Information
- 4.10 13 large marine construction projects
- 4.11 low-level radioactive liquid waste discharged into the sea 14 project
- 4.12 renovation, expansion project
- 4.13 Other environmental impact assessment of the contents of
- 4.14 16 coastal ecological environment
- 4.16 17 environmental protection facilities
- 4.17 pollutant emissions
- 4.20 siting projects and optimization
- 4.22 marine engineering environmental impact statement prepared
- 19 5.1 Subjects
- 5.2 Project Overview
- 5.3 Engineering Analysis
- 5.5 Environmental Status Assessment
- 5.6 Environmental impact prediction and assessment
- 5.7 Environmental Risk Analysis and Evaluation
- 5.8 Cleaner Production
- 5.9 Total Control
- 5.12 Public participation
- 5.14 Environmental Management and Environmental Monitoring
- 5.15 Environmental Impact Assessment conclusions
- 5.16 Environmental Impact Assessment Report Annex
- 6 Marine Hydrodynamic Environmental Impact Assessment
- 6.1 General
- 6.2 Use of investigation and monitoring
- 6.5 Environmental impact prediction
- 6.6 Environmental Impact Assessment
- 7 ocean topography and erosion Environmental Impact Assessment
- 7.1 General
- 7.2 Use of monitoring data and surveys
- 7.4 Environmental Status Assessment
- 7.5 Environmental impact prediction
- 7.6 Environmental Impact Assessment
- 8 Marine Water Quality Environmental Impact Assessment
- 8.1 General
- 39 8.5 Environmental impact prediction
- 40 8.6 Environmental Impact Assessment
- 8.7 Environmental countermeasures
- 9 environmental impact assessment in marine sediments
- 9.1 General
- 42 9.5 Environmental impact prediction
- 43 9.6 Environmental Impact Assessment
- 9.7 Environmental countermeasures
- 10 Environmental Impact Assessment of Marine Ecological
- 10.1 General
- 10.2 investigation and monitoring
- 10.4 Evaluation and major predictor of screening to determine
- 10.5 Analysis of the marine environment sensitive areas Evaluation
- 10.6 Environmental Status Assessment
- 10.7 Environmental Impact Prediction
- 10.8 Environmental Impact Assessment
- 10.9 marine ecological protection and compensation for damages
- Appendix A (normative) marine construction project environmental impact report format and content
1 Scope
This standard specifies a marine construction project environmental impact assessment procedures, evaluation of the content, technology and methods report (form) the preparation and
Requirements.
This standard applies to the environmental impact of water, territorial waters and internal waters under the jurisdiction of other marine construction projects in the People's Republic of China
Evaluation; regional marine environmental impact assessment, environmental impact assessment review of the marine environmental impact assessment and other sea-related construction projects can participate
According to the Executive.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 3097 water quality standards
GB 3552-1983 ship pollutant discharge standards
GB 4914 offshore oil exploration and development of pollutant emission concentration limits
GB 8978-1996 Integrated Wastewater Discharge Standard
GB 11215 Nuclear Radiation Environment Quality Evaluation General provisions
GB 11216 General requirements for nuclear facility effluent and environmental radioactivity monitoring quality assurance program
GB 11217 General provisions for monitoring effluents at nuclear facilities
GB 11607 Fisheries water quality standards
GB/T 12763 (all parts) oceanographic survey
GB 14587 LWR nuclear power plant radioactive waste water discharge system technical requirements
GB 17378 (all parts) specification for marine monitoring
GB 18218-2000 identification of major hazard
GB 18421 Marine life quality
GB 18668 marine sediment quality
HJ/T 2.1 Environmental Impact Assessment Technology Guidelines Master
HJ/T 2.2 Technical Guidelines for Environmental Impact Assessment of Atmospheric Environment
HJ/T 2.3 Environmental Impact Assessment Technology Guidelines surface water
HJ/T 2.4 Environmental Impact Assessment Technology Guidelines make a sound environment
HJ/T 19 Environmental Impact Assessment Technology Guidelines non-polluting ecological impact
HJ/T 169-2004 Construction Project Environmental Risk Assessment Guidelines
HY/T 076 terrestrial outfall into the sea and adjacent waters Monitoring Technical Specification
HY/T 077 rivers flow into the sea in total pollutant monitoring technical regulations
HY/T 078 marine biological quality monitoring procedures
HY/T 080 Coastal Wetland Ecological Monitoring technical regulations
HY/T 081 Mangrove Ecological monitoring technical regulations
Technical specification for ecological monitoring HY/T 082 coral reefs
Technical specification for ecological monitoring HY/T 083 seagrass beds
HY/T 084 Technical specification for ecological monitoring Gulf
Technical specification for ecological monitoring HY/T 085 Estuary
HY/T 086 land-based sewage into the sea and its adjacent waters Ecological Environmental Assessment Guidelines
HY/T 087 nearshore marine ecosystem health evaluation guidelines
SC/T 9110 Project Impact Assessment of technical regulations for marine living resources
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Bay bay; gulf
Surrounded by land and the area is not less than the width of the door opening to the diameter of the semicircle sea area.
[GB/T 18190-2000, the definition 2.1.19]
NOTE. This standard does not contain the Gulf of Liaodong Bay, Bohai Bay, Laizhou Bay, Hangzhou Bay and North Bay.
3.2 Estuary rivermouth; estuary
It has annual runoff into the sea and river terminals tidal interaction runoff waters.
NOTE. rewrite GB/T 18190-2000, the definition of 2.5.1.
3.3 Coastal waters nearshorearea
From the sea close to the coast of the mainland.
Note. Sea published baseline point refers to the outer limit of the territorial sea waters between the mainland coast of the Bohai Sea and the northern Gulf generally refers to 10m water depth shallow waters.
3.4 Coastal waters coastalarea
Within the coastal waters near the mainland coast, hydrological factors and weather conditions by big land Runoff waters.
Note. generally refers to the sea from the mainland within 10km of the coast.
3.5 Marine environment sensitive areas
Marine ecosystem service function of higher value, and its waters more difficult to restore function after suffering damage.
NOTE. including nature reserves, natural concentrated distribution of rare and endangered marine life, bays, estuaries waters, territorial sea base points and its surrounding waters and islands
Its surrounding seas, important marine ecosystems and special habitats (mangroves, coral reefs, etc.), important fishery waters, marine natural history sites and natural
Landscape.
3.6 Marine engineering
In development, utilization, protection and restoration of marine resources for the purpose, the main project is located in the coastline seaward side of the new construction, renovation, expansion project.
NOTE. marine engineering including. reclamation, offshore dam project; artificial island, offshore and subsea material storage facilities, cross-sea bridge, undersea tunnel project; seabed
Pipelines, submarine cables (optical) cable engineering; marine mineral resources exploration and development of its ancillary works; offshore tidal power, wave power plants, power plants and other ocean temperature difference can
Source Development and Utilization Project; large saltwater farms, artificial reef projects; Yantian, comprehensive utilization of seawater desalination projects; marine entertainment and sports, landscape
Development project; other maritime projects.
3.7 Marine Hydrodynamic environmental impact
Construction projects (including new construction, expansion, renovation project) for wave, tidal, current and residual current, and tidal water exchange capacity, water temperature and salinity structure
Wen impact of dynamic factors.
3.8 Ocean topography erosion and environmental impact environmentalimpactonmarinegeomorphology, erosionandsiltation
Construction projects (including new construction, expansion, renovation project) to change the coast, beaches, sea-bed and subsoil and other natural and geographical conditions and the resulting environmental impact.
3.9 Mixing zone
Pollutant emission standards to the ocean after dilution diffusion reaches the surrounding marine environment quality standards occupied sea area.
NOTE. The outlet center, after dilution and diffusion of pollutants in order to achieve the environmental quality standards in waters around the maximum distance for the area of a circle radius indicated.
4 General
4.1 Environmental Impact Assessment of the results of marine engineering
Environmental impact assessment of the results of marine construction projects including environmental impact report and environmental impact statement.
Belong to Level 1, Level 2 and Level 3 evaluation level of marine construction projects and large marine construction projects, marine engineering should be prepared ring
Environmental impact report. Marine engineering preparation of an environmental impact report should be consistent with the requirements of Appendix A.
Contents of the report should be clear, clear, concise; wherein the state of the environment can be based on marine survey and monitoring data, the data given in the summary table and evaluation
Summary index briefly clarify the status of environmental evaluation of water quality, sediment quality and biological quality of the results; environmental impact analysis and forecast content
Should be concise, focused, avoid theory, common sense, explanatory help content.
Rank less than three marine construction projects, marine engineering can prepare environmental impact statement. Marine Environmental Impact newspaper
Table for the report shall comply with Appendix B requirements.
4.2 marine engineering environmental impact assessment stage
Environmental impact assessment of marine engineering generally be divided into three stages (see Figure 1). Preparation of environmental impact statements of construction projects can be simple
Evaluation sessions.
a) The first stage is the preparation stage, the main tasks include.
--- Research on environmental protection and management laws, regulations and policies, research and other documents related to the environmental impact assessment;
--- Collect historical data, state of the environment to carry out reconnaissance, conduct a preliminary analysis of construction projects;
--- Determine the individual level of environmental impact assessment and evaluation of the evaluation level of construction projects, specifically within the construction project environmental impact assessment
Content, scope of the evaluation, the evaluation criteria;
--- Distil the main elements of the environmental impact, environmentally sensitive goals and environmental objectives;
--- Clear state of the environment survey content, the scope of investigation, survey items (elements or factors), survey stations laid, the investigation period, the investigation
Frequency, analysis and detection methods, evaluation methods, technical standards, etc. to be executed;
--- Screening to determine the main factors of environmental impact assessment and evaluation factor;
--- Clear the next phase of the environmental impact assessment of the key elements and environmental impact of the main contents of the report and so on.
b) The second stage is the formal sessions, the main tasks include.
--- Carry out detailed engineering analysis;
--- According to the environmental assessment has clearly content, scope and focus of the evaluation project evaluation, organization and implementation of environmental and public participation Survey survey;
--- Based on environmental quality requirements, analyze the obtained data, information, carrying out environmental situation analysis, evaluation of the evaluation;
--- Carry out the analysis of environmental impact prediction, evaluation;
--- Carry out clean production, environmental risks, the total control of the analysis and evaluation.
c) The third stage is the preparation of the report or report form stage, the main tasks include.
--- Based Environmental Investigation and forecasting analysis, environmental quality in accordance with the requirements set forth loop construction project site, size and layout
Environmental feasibility analysis, evaluation findings;
--- Give environmental protection concrete countermeasures and suggestions;
--- Clarify environmental management and monitoring plan.
1 marine engineering block diagram of the environmental impact assessment stage
4.3 marine environmental impact assessment program of work
Class 1 evaluation level of marine construction projects and large marine construction project, the project should compile a marine EIA Price of the program of work, the specific content and format shall conform to Annex C requirements.
Marine environmental impact assessment program of work should be based on a preliminary understanding of the engineering characteristics and environmental characteristics, determination and clear construction projects
The scope of the environmental impact assessment, evaluation level, evaluation criteria, the main environmental issues, objectives and key environmental protection environmentally sensitive objects; preliminary determination
Evaluation of content, evaluation priorities; determine the environmental status of the survey content, the scope of investigation, survey items (elements or factors), survey stations layout, survey
Period, the frequency of the survey, analysis and detection methods, evaluation methods, technical standards should perform technical evaluation methods and routes; preparation guide ring
Environmental impact evaluation of the implementation of the program.
4.4 marine engineering content and scope of the environmental impact assessment
4.4.1 Evaluation Content
EIA content of marine construction projects, in accordance with the specific type of construction project and its shadow on the marine environment that may arise
Ring, identified in Table 1.
Table 1 marine construction projects each single environmental impact assessment content
Environmental impact assessment content
Reclamation, offshore dam projects. the construction of urban reclamation, reclamation works formed the foundation,
Contiguous transport energy projects, reclamation, land reclamation, land reclamation reclamation, bay change
Building, beach reconstruction and other projects; artificial island, surrounded by the sea, beach enclosures, enclosures and other Gulf
Engineering; required reclamation marina and other projects, dug-in basin, dock and wharf;
Sea dam, revetment, dike (dam), anti-wave (wave) embankment, diversion dike (dam), submerged breakwater (Dam), cited dike (dam), siltation erosion, various types of gates and other projects
Sea and seabed materials storage facilities, cross-sea bridge, undersea tunn...
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 73 pages — is available in the English PDF.
Referenced standards
Cited by
- GB/T 45142-2025Technical guidelines for monitoring and effectiveness evaluation for marine oil spill pollution ecological restoration
- GB/T 42361-2023Technical guidelines for sea area use demonstration
- GB/T 42642-2023Technical guideline for monitoring and effectiveness evaluation of marine zoobenthos populations ecological restoration
- GB/T 41341.1-2022Technical specifications for siting of ocean energy power station—Part 1: Tidal current energy
- GB/T 41341.2-2022Technical specifications for siting of ocean energy power station—Part 2: Wave energy
- HJ 19-2022Technical guidelines for environmental impact assessment - Ecological impact
Similar standards
Editions of GB/T 19485
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 19485-2014 | Technical guidelines for environmental impact assessment of marine engineering | current edition | Current |
| GB/T 19485-2004 | Technical guidelines for environmental impact assessment of marine engineering | previous edition | Superseded |
This page sells the current edition, GB/T 19485-2014. Earlier editions are listed for reference only.
How to Download GB/T 19485-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 19485-2014
$1,220.00