GB/T 1094.7-2008Power transformers - Part 7: Loading guide for oil-immersed power transformers (English PDF)
电力变压器 第7部分:油浸式电力变压器负载导则
GB/T 1094.7 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| GB/T 1094.7-2024 | Power transformers—Part 7: Loading guide for mineral-oil-immersed power transformers | Valid |
| GB/T 1094.7-2008 | Power transformers - Part 7: Loading guide for oil-immersed power transformers | Obsolete |
GB/T 1094.7-2008 is obsolete. It has been replaced by GB/T 1094.7-2024. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for GB/T 1094.7-2008 in 30 minutes.
Issued by
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China
Level / Type
National · Recommended
Issue date
September 24, 2008
Implementation date
August 1, 2009
Scope
GB/T 1094.7-2008 is the English-translated version of 电力变压器 第7部分:油浸式电力变压器负载导则.
GB/T 1094.7-2008 is the Chinese national standard "Power transformers - Part 7: Loading guide for oil-immersed power transformers".
It was issued on September 24, 2008 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China and the Standardization Administration of China, and took effect on August 1, 2009. It is obsolete: it has been replaced by GB/T 1094.7-2024.
Found what you need?
Document preview — GB/T 1094.7-2008
National Standard of the People's Republic of China
Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China
Contents
- Document data
1 Document data
Sector: National standard (Recommended).
Issuing body: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China.
Date of issue: 2008-09-24.
Date of implementation: 2009-08-01.
Status: obsolete, replaced by GB/T 1094.7-2024.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Cited by
- GB/T 25438-2026Technical parameters and requirements for three-phase oil-immersed transformers with tridimensional wound cores
- GB/T 47962-2026Guide for the application, specification and testing of phase-shifting transformers
- GB/T 10230.2-2025Tap-changers - Part 2: Application guidelines
- GB/T 1094.16-2025Power transformers - Part 16: Transformers for wind turbine applications
- GB/Z 15166.8-2025High-voltage alternating-current fuses - Part 8: Application guide
- GB/T 18494.2-2022Convector transformers - Part 2: Transformers for HVDC applications
How to Download GB/T 1094.7-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 1094.10-2022 — Power transformers - Part 10: Determination of sound levels
GB/T 1094.6-2011 — Power transformers -- Part 6: Reactors
GB/T 1094.10-2003 — Power transformers - Part 1 0: Determination of sound levels
Secure payment via Stripe
Payments accepted
GB/T 1094.7-2008
$235.00