Valid

GB/T 33766-2017Technical requirements for independent energy of solar photovoltaic system (English PDF)

独立太阳能光伏电源系统技术要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 33766-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

May 31, 2017

Implementation date

December 1, 2017

Scope

GB/T 33766-2017 is the English-translated version of 独立太阳能光伏电源系统技术要求.

GB/T 33766-2017 sets the technical requirements for stand-alone solar photovoltaic power systems in China, together with the terms and definitions and the test methods.

It applies to systems whose photovoltaic modules are rated below 1.0 kW and whose output is DC at 72 V or less, or AC at 220 V. The requirements start from the parts such a system is made of: photovoltaic modules, controller, storage battery and inverter.

Three informative annexes cover the design of the system configuration, the level of exposure, and how the balance point is found, where the generating efficiency curve of the modules crosses the load curve.

Clause 2 cites fifteen standards, among them GB/T 9535, GB/T 20321.1, GB/T 20321.2, GB/T 29196-2012, GB 31241, JB/T 11137 and JB/T 11140. It was issued on 31 May 2017 and has applied since 1 December 2017.

Found what you need?

Document preview — GB/T 33766-2017

National Standard of the People's Republic of China

ICS
27.160
Classification
F 12

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 normative reference document
  • 3 Terms and definitions
  • 5 Test methods
  • Appendix A (informative) System configuration design
  • Appendix B (informative) Level of exposure
  • Appendix C (informative) Determination of system balance point

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009.

1 Scope

This standard specifies the terms and definitions of independent solar photovoltaic power systems, technical requirements and test methods.

This standard applies to the PV module rated power of 1.0kW below the DC output of 72V or less or AC 220V independent too Solar photovoltaic power supply system.

2 Normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this document. For undated references, the latest edition (including all modifications) applies to this document.

GB/T 9535 Design, identification and shaping of crystalline silicon photovoltaic modules for ground use

GB/T 12527 Overhead insulated cables with rated voltages up to and including 1 kV

GB/T 14285 Technical specification for relay protection and safety automatic device

GB/T 18911 Design, qualification and shaping of thin - film PV modules for ground use

GB/T 19064-2003 Technical conditions and test methods for domestic solar photovoltaic power systems

GB/T 20321.1 Inverters for off-grid wind energy and solar power generation systems - Part 1: Technical conditions

GB/T 20321.2 Inverter for off-grid wind energy and solar power generation systems - Part 2: Test methods

GB/T 22473 Lead - acid batteries for energy storage

GB/T 29196-2012 Technical specification for independent photovoltaic systems

GB 31241 Lithium-ion batteries and battery pack safety requirements for portable electronic products

GB/T 32512 Technical Requirements for Lightning Protection of Photovoltaic Power Station

GB 50054 Code for design of low voltage distribution

DL 5027 Typical fire protection procedures for power equipment

JB/T 11137 General requirements for lithium ion battery packs

JB/T 11140 lithium iron phosphate battery module general requirements

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 System balance point

The equilibrium point of the system is the equilibrium point between the minimum solar radiation and the load, that is, the intersection of the efficiency of the component power generation and the load curve.

4 Technical requirements

4.1 System components

The main part of the independent solar photovoltaic power system consists of components such as PV modules, controllers, accumulators and inverters.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 33766-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 33766-2017

$235.00