GB/T 33607-2017Smart grid operation and control system architecture (English PDF)
智能电网调度控制系统总体框架
This is a limited preview
Buy now to download the full PDF (18 pages)
Need quotation for your management?
Get a formal quotation for GB/T 33607-2017 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
May 12, 2017
Implementation date
December 1, 2017
Scope
GB/T 33607-2017 is the English-translated version of 智能电网调度控制系统总体框架.
GB/T 33607-2017 sets out the overall framework of the smart grid dispatching control system.
It fixes the overall design and the functional positioning and composition of its application groups - real-time monitoring and early warning, dispatch planning and security checking, dispatch management, and the grid operation cockpit - with the basic platform they all sit on, and it states the capacity, performance indicators and functional availability the whole system has to reach.
The basic platform chapter covers the message bus and service bus, data storage and management, platform management, public services, data acquisition and exchange, and system security.
It applies to the design, development, construction, acceptance, operation and maintenance of such systems at provincial level and above, and county-level systems may follow it as a reference. Issued on 12 May 2017, it has applied since 1 December 2017.
Found what you need?
Document preview — GB/T 33607-2017
National Standard of the People's Republic of China
- ICS
- 29.240
- Classification
- F 21
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 normative reference document
- 3 Terms and definitions
- 4 system overall framework
- 4.1 General Framework Requirements
- 4.2 Overall framework composition
- 4.3 Relationship between basic platform and various applications
- 4.4 Data Logical Relationships between Applications
- 5 base platform
- 5.1 General requirements
- 5.2 Basic Platform System Framework
- 5.3 Message bus and service bus
- 5.4 Data storage and management
- 5.5 Platform Management
- 5.6 Public Service
- 5.7 Data Acquisition and Exchange
- 5.8 System Security
- 6 real - time monitoring and early warning applications
- 6.1 functional positioning and composition of real-time monitoring and early warning
- 6.2 real-time monitoring and intelligent alarm
- 6.3 Analysis of hydropower and new energy monitoring
- 6.4 Automatic power control
- 6.5 Network Analysis
- 6.6 Online Security and Stability Analysis
- 6.7 Scheduling Operation Auxiliary Decision
- 6.8 On-line verification and warning of relay protection settings
- 6.9 dispatcher training simulation
- 6.10 Auxiliary monitoring
- 6.11 Operation analysis and evaluation
- 7 Scheduling and security check class application
- 7.1 Function and positioning of dispatch plan and security check
- 7.2 Data reporting and information release
- 7.3 Forecast
- 7.4 Short-term transaction management
- 7.5 Maintenance Plan
- 7.6 Power Generation Plan
- 7.7 Hydropower and New Energy Dispatching
- 7.8 Planning Analysis and Assessment
- 7.9 Examination and settlement
- 7.10 static security check
- 7.11 Stable calculation checking
- 7.12 Auxiliary decision
- 7.13 Stability margin assessment
- 8 scheduling management class application
- 8.1 Function and configuration of scheduling management
- 8.2 Control Production Operation Management
- 8.3 Professional Management
- 8.4 Internal work management
- 8.5 Comprehensive Analysis and Evaluation
- 8.6 Information Display and Release
- 8.7 External Sharing and Collaboration
- 9 grid running cockpit class application
- 9.1 Functional positioning and construction of the cockpit of the grid operation
- 9.2 Running KPI Monitoring Early Warning
- 9.3 Running the Panorama View
- 9.4 centralized console
- 10 System Performance and Indicators
- 10.1 Capacity
- 10.2 Performance Indicators
- 10.3 Functional availability
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
1 Scope
This standard specifies the overall design and system framework of the intelligent grid dispatching control system, standardizes the basic platform, real-time monitoring and early warning Application, scheduling and security check class application, scheduling management class application, power grid running cockpit class application function positioning and composition, system total Body performance requirements.
This standard is applicable to the design, research and development, construction, acceptance, operation and maintenance of the intelligent grid dispatching control system at provincial level and above. County (with) Level scheduling control system with reference.
2 Normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this document. For undated references, the latest edition (including all modifications) applies to this document.
GB/T 30149 Specification for Generic Model of Power Grid
GB/T 31464 Code of Practice for Power Grid
GB/T 31992 Generic alarm format for power systems
GB/T 33590.2 Technical specification for smart grid dispatching control system - Part 2: Terminology
GB/T 33601 Generic specification for general model data for grid equipment
GB/T 33602 General Service Agreement for Power Systems
GB/T 33603 Specification for dynamic message coding of power system model data
GB/T 33604 Power system simple service interface specification
GB/T 33605 Code for message transmission of power system messages
DL/T 476 Power System Real-time Data Communication Application Layer Protocol
DL/T 1170 Specification for Power Dispatch Workflow Description
Code Specification for Power System of DL/T 1230 Power System
DL/T 1380 Code for data exchange of grid operation model
DL/T 1456 Power System Database Universal Access Interface Specification
National Development and Reform Commission. 2014, No. 14, "power monitoring system security protection"
3 Terms and definitions
GB/T 33590.2 Definitions of terms and definitions apply to this document.
4 System overall framework
4.1 Overall framework requirements
Smart grid scheduling control system of the main system and preparation system should adopt exactly the same system architecture framework, with the same function And to achieve the main, prepare the integration of the operation. Horizontal, the scheduling system through a unified base platform to achieve the integration of various types of applications to run And the interaction with the management information system to achieve the main and standby between the application of the coordination of the operation and the main and standby system maintenance and data synchronization;
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 18 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 30149CIM based efficient model exchange format
- GB/T 31464The grid operation code
- GB/T 31992Common alarm format for electric power system
- GB/T 33590.2Technical specification of smart grid operation and control systems—Part 2: Terminology
- GB/T 33601Power grid equipment common model naming specification
- GB/T 33602General service protocol for electric power system
DL/T 476
Cited by
- GB/T 44637-2024Energy interconnection system - Interaction between smart grid and heat, gas, water and transportation systems
- GB/T 40585-2021Technical specifications for monitoring, assessment and visualization of power grid operational risk
- DL/T 2039-2019Basic configuration technical conditions of local power grid sales control center
Similar standards
How to Download GB/T 33607-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1170-2012 — Workflow description specification for power dispatching
DL/T 1230-2016 — Graphic description specification for electric power system
DL/T 1380-2014 — Specification for exchanging of grid operating model data
Secure payment via Stripe
Payments accepted
GB/T 33607-2017
$295.00