Valid

GB/T 40585-2021Technical specifications for monitoring, assessment and visualization of power grid operational risk (English PDF)

电网运行风险监测、评估及可视化技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (38 pages)

Need quotation for your management?

Get a formal quotation for GB/T 40585-2021 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 11, 2021

Implementation date

May 1, 2022

Scope

GB/T 40585-2021 is the English-translated version of 电网运行风险监测、评估及可视化技术规范.

GB/T 40585-2021 specifies technical requirements for monitoring, assessing and visualizing power grid operational risk, a combined measure of the likelihood and harm of events that affect safe and stable grid operation in real time or the ultra-short term.

After general technical requirements it deals with risk monitoring, risk assessment and the visual presentation of grid operation risks, and it defines risk scenario, risk severity, risk assessment and risk early warning.

Informative annexes set out a grid operation risk index system and the definition, calculation and evaluation methods of the risk indicators. It applies to power dispatch agencies and operation and maintenance units at provincial level and above, while other dispatch and maintenance units and grid planning and design bodies may use it for reference. It was issued on 11 October 2021 and has applied since 1 May 2022.

Found what you need?

Document preview — GB/T 40585-2021

National Standard of the People's Republic of China

ICS
29.020
Classification
F 21

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 General technical requirements
  • 5 Power grid operation risk monitoring
  • 6 Grid operation risk assessment
  • 7 Visualization of grid operation risks
  • Appendix A (Informative) Grid Operation Risk Index System
  • Appendix B (informative) The definition, calculation method and evaluation method of power grid operation risk indicators

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.

1 Scope

This document specifies the technical requirements for the monitoring, evaluation and visualization of power grid operation risks.

This document is applicable to power dispatch agencies and operation and maintenance units at the provincial level and above, other power dispatch agencies and operation and maintenance units, and grid planning and design. Units such as calculations can be implemented by reference.

2 Normative references

The content of the following documents constitutes an indispensable clause of this document through normative references in the text. Among them, dated quotations Only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.

GB/T 30149 Power grid general model description specification

GB/T 31992 General warning format for power system

GB/T 33602 Power System General Service Agreement

GB/T 33607 Smart grid dispatching control system overall framework

GB 38755-2019 Safety and Stability Guidelines for Power Systems

DL/T 1230 Power System Graphic Description Specification

3 Terms and definitions

The following terms and definitions defined in GB/T 30149 and DL/T 1230 apply to this document.

3.1 Power grid operational risk

A comprehensive measurement of the possibility and harm of factors or events that affect the safe and stable operation of the power grid in real-time or ultra-short-term.

3.2 Risk scenario

Factors that affect the safe and stable operation of the power grid or specific scenarios in which events occur.

3.3 Risk hazard

Serious consequences caused by factors or events that affect the safe and stable operation of the power grid.

3.4 Risk assessment

Comprehensive assessment of risks and hazards.

3.5 Risk early warning

Based on the source of the risk, according to the degree of risk, the risk information is notified in a visual manner, and the operation and maintenance personnel of the power supply network refer to it. And decision-making.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 38 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 40585-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
38 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 40585-2021

$590.00