Scope
GB/T 26866-2022 is the English-translated version of 电力时间同步系统检测规范.
GB/T 26866-2022 is the Chinese national test specification for power time synchronization systems. It fixes the test conditions, the test items, which are the type test, the factory inspection and the on-site inspection, the test methods, the way results are judged and the inspection intervals, and it closes with the inspection rules.
It defines timing deviation and monitoring unit, and lists the abbreviations used. It applies to the development, production, testing and inspection of power time synchronization systems.
Among the documents it cites are GB/T 7261-2016, GB/T 13729-2019, the GB/T 17626 immunity test series, GB/T 25931-2010, GB/T 33591-2017, DL/T 860 and DL/T 1100.1-2018, whose technical requirements it provides the detection methods for.
It replaces GB/T 26866-2011, was issued on 14 October 2022 and has applied since 1 May 2023.
Found what you need?
Document preview — GB/T 26866-2022
National Standard of the People's Republic of China
- ICS
- 27.100
- Classification
- F 21
- Replacing
- GB/T 26866-2011
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Abbreviations
- 5 Test items and requirements
- 6 Inspection rules
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted.
This document replaces GB/T 26866-2011 "Testing Specification for Time Synchronization System of Electric Power System", which is consistent with GB/T 26866-2011 In addition to structural adjustments and editorial changes, the main technical changes are as follows.
a) Modified normative references (see Chapter 2, Chapter 2 of the 2011 edition);
b) Added the terms "time deviation" and "monitoring unit" (see 3.1, 3.2);
c) Added "abbreviations" (see Chapter 4);
d) The main instruments "PTP switch" and "network tester" were added (see 5.2.2.8, 5.2.2.9);
e) Changed the qualification criteria in "punctuality performance test" (see 5.2.4, 4.2.4 of the 2011 edition);
f) Changed the whole group method of time synchronization system in "The whole group test of time synchronization system" (see 5.3, 4.3 of the 2011 edition);
g) Changed the inspection items in "Inspection items" (see 6.4, 5.4 of the 2011 edition);
h) Added "PTP interface", "Data model detection", "Location information analysis function detection", "Time source selection function detection" and "Clock detection" Monitoring Function Test" (see 5.2.3.7.2, 5.2.10, 5.2.11, 5.2.12, 5.2.13).
Introduction
At present, time synchronization devices have been widely used in power systems. With the deepening and popularization of applications, time synchronization devices have improved In order to standardize the application of time synchronization devices in the power industry, the DL/T 1100.1-2018 has been released for Product performance, function, environmental adaptability and other aspects put forward specific requirements. This document is based on the technology proposed in DL/T 1100.1-2018 It is required to give the corresponding detection methods and determine the inspection rules, so as to provide standard basis for the product inspection and quality supervision of the time synchronization device.
1 Scope
This document specifies the test conditions, test items (including type test, factory inspection and on-site inspection) of the power time synchronization system and its Inspection method, test result determination method and inspection period requirements.
This document applies to the development, production, testing and inspection of power time synchronization systems.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.
GB/T 7261-2016 Basic test methods for relay protection and safety automatic devices
GB/T 13729-2019 Telecontrol terminal equipment
GB/T 17626.2-2018 Electromagnetic Compatibility Test and Measurement Technology Electrostatic Discharge Immunity Test
GB/T 17626.3-2016 Electromagnetic compatibility test and measurement technology Radio frequency electromagnetic field radiation immunity test
GB/T 17626.4-2018 Electromagnetic Compatibility Test and Measurement Technology Electrical Fast Transient Burst Immunity Test
GB/T 17626.5-2019 Electromagnetic Compatibility Test and Measurement Technology Surge (Shock) Immunity Test
GB/T 17626.8-2006 Electromagnetic Compatibility Test and Measurement Technology Power Frequency Magnetic Field Immunity Test
GB/T 17626.9-2011 Electromagnetic Compatibility Test and Measurement Technology Pulse Magnetic Field Immunity Test
GB/T 17626.10-2017 Electromagnetic Compatibility Test and Measurement Technology Damped Oscillating Magnetic Field Immunity Test
GB/T 17626.18-2016 Electromagnetic Compatibility Test and Measurement Technology Damped Oscillating Wave Immunity Test
GB/T 19520.12-2009 Mechanical Structure of Electronic Equipment 482.6mm (19in) Series Mechanical Structure Dimensions Part 3-101. Box and its plugins
GB/T 25931-2010 Precision Clock Synchronization Protocol for Network Measurement and Control Systems
GB/T 33591-2017 Technical Specification for Time Synchronization System and Equipment of Intelligent Substation
DL/T 860 (all parts) Electric power automation communication networks and systems
DL/T 1100.1-2018 Time Synchronization System for Power Systems Part 1: Technical Specifications
DL/T 1100.6-2018 Time synchronization system of power system Part 6: Monitoring specification
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Timing deviation
The monitoring unit measures or calculates the obtained time deviation between the timed device and the monitoring unit.
3.2 Monitoring unit
A module with time synchronization monitoring function can monitor timing equipment and timed equipment; it can be deployed inside the time synchronization device, or can be as a stand-alone device.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 7261-2016Basic test methods for protection relays and security automatic equipment
- GB/T 13729-2019Remote terminal unit equipment
- GB/T 17626.2-2018Electromagnetic compatibility -- Testing and measurement techniques -- Electrostatic discharge immunity test
- GB/T 17626.3-2016Electromagnetic compatibility - Testing and measurement techniques - Part 3: Radiated, radio-frequency, electromagnetic field immunity test
- GB/T 17626.4-2018Electromagnetic compatibility -- Testing and measurement techniques -- Electrical fast transient/burst immunity test
- GB/T 17626.5-2019Electromagnetic compatibility - Testing and measurement techniques - Surge immunity test
DL/T 860
Cited by
- GB/T 45906.10-2025Substation secondary system - Part 10: Test and detection
- GB/T 46932-2025Technical specification for the civil aviation BeiDou timing system
- GB/T 33591-2017Technical specification of time synchronism system and equipment in smart substation
- GB/T 14598.302-2016Specification for arc flash protection equipment
Similar standards
Editions of GB/T 26866
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 26866-2022 | Testing specifications of power time synchronism systems | current edition | Current |
| GB/T 26866-2011 | Testing specifications of power time synchronism systems | previous edition | Superseded |
This page sells the current edition, GB/T 26866-2022. Earlier editions are listed for reference only.
How to Download GB/T 26866-2022
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1100.1-2018 — Time synchronism systems of power system - Part 1: Technical specifications
DL/T 1100.6-2018 — Time synchronism systems of power system -- Part 6: Monitoring specifications
DL/T 860.10-2018 — Communication networks and systems for power utility automation -Part 10: Conformance testing