GB/T 45906.10-2025Substation secondary system — Part 10: Test and detection (English PDF)
变电站二次系统 第10部分:试验与检测
Open the GB/T 45906.10-2025 preview as PDF
This is a limited preview
Buy now to download the full PDF (17 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
August 1, 2025
Implementation date
February 1, 2026
Scope
GB/T 45906.10-2025 is the English-translated version of 变电站二次系统 第10部分:试验与检测.
GB/T 45906.10-2025 is the Chinese national standard covering checking that a substation secondary system works before and after it is installed — the test conditions, the type test, the factory inspection, the integration test and the on-site inspection for the protection and control equipment, the station monitoring system, the centralised monitoring system and the error prevention function, and the network security testing that is now part of commissioning rather than a separate audit. Part 10 of the series, with the equipment part GB/T 45906.5-2025. First edition, under the China Electricity Council. In force from 1 February 2026. Issued on 1 August 2025, it has been in force since 1 February 2026.
Document preview — GB/T 45906.10-2025
National Standard of the People's Republic of China
- ICS
- 29.240.10
- Classification
- F 20
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- PrefaceIII
- IntroductionIV
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions3
- 4 General Requirements3
- 5 Test conditions3
- 5.1 Environmental conditions for testing3
- 5.2 Benchmark conditions for testing3
- 6 Type test4
- 6.1 Protection control and related equipment4
- 6.2 Station Monitoring System5
- 6.3 Substation Centralized Monitoring System5
- 6.4 Preventing Errors in Electrical Operations6
- 7 Factory Inspection6
- 7.1 Protection control and related equipment6
- 7.2 Station Monitoring System8
- 7.3 Substation Centralized Monitoring System8
- 7.4 Preventing Errors in Electrical Operations8
- 8 Integration Testing8
- 9 On-site inspection9
- 9.1 Protection control and related equipment9
- 9.2 Station Monitoring System10
- 9.3 Substation Centralized Monitoring System10
- 9.4 Preventing Errors in Electrical Operations10
- Appendix A (Normative) Substation Secondary System Network Security Detection Method12
- A.1 Ontology Security12
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
This document is Part 10 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts.
— Part 1: General requirements;
— Part 2: Data and models;
— Part 3: Communication message specifications;
— Part 4: Network security protection;
— Part 5: Protection, control and related equipment;
— Part 6: Station monitoring system;
— Part 7: Centralized monitoring system;
— Part 8: Electrical operation error prevention;
— Part 9: Construction specifications;
— Part 10.Testing and inspection.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is issued by the National Grid Operation and Control Standardization Technical Committee (SAC/TC446), the National Measuring Relay and Protection Equipment Standardization Technical Committee It is under the jurisdiction of the Static Relay Protection Device Subcommittee of the Standardization Technical Committee (SAC/TC154/SC1).
This document was drafted by: China Electric Power Research Institute Co., Ltd., State Electric Power Dispatching and Control Center, State Grid Economic and Technological Research Institute Co., Ltd., State Grid Corporation of China Information and Communications Branch, Guangdong Power Grid Co., Ltd., Yunnan Power Grid Co., Ltd., State Grid Gansu Provincial Electric Power Company Electric Power Research Institute, State Grid Beijing Electric Power Company, Nanjing NARI Relay Protection Electric Co., Ltd., State Grid NARI Technology Co., Ltd.
Co., Ltd., Beijing Sifang Relay Protection Engineering Technology Co., Ltd., Xuji Electric Co., Ltd., Anhui Nanrui Jiyuan Power Grid Technology Co., Ltd., Nanjing Electric Automation Co., Ltd. and Changyuan Shenzhen Ruijibao Automation Co., Ltd.
The main drafters of this document are: Yang Guosheng, Liu Huihai, Zhang Jinhu, Liu Yu, Zhou Zexin, Zhang Zhi, Chang Naichao, Meng Jiangwen, Xu Kai, Zhang Xiaoli, Zhan Rongrong, Li Jinsong, Wang Zhihui, Wang Chunyu, Zhang Haiyan, Zhao Na, Zhang Wei, Wang Yongnian, Liu Wei, Shi Hengchu, Jin Long, Shen Yan, Jia Ling, Yu Yue, Li Bozhong, Li Jing, Liu Dongchao, Hong Xi, Wu Fangying, Fang Wei, Ma Qianli, Chen Qi, Ling Hao, Li Yalei, Zhao Mingyang, Yan Yiming, and Shen Hongming.
Introduction
In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized.
Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system List standards.
GB/T 45906 covers the substation secondary system from the aspects of general requirements, equipment system functional requirements and engineering implementation and testing.
The system is planned to consist of 10 parts.
— Part 1: General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction, Network security and other technical requirements.
— Part 2: Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection Processing requirements, modeling methods, and model configuration processes.
— Part 3: Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication The implementation method of the service.
— Part 4: Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems.
— Part 5: Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment.
— Part 6: Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc.
— Part 7: Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and Mutual technical requirements.
— Part 8: Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and Energy, performance and application requirements.
— Part 9: Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering.
System and technical requirements.
— Part 10.Testing and inspection. The purpose is to standardize the general principles and inspection of substation secondary system equipment and systems. Require. Substation secondary system Part 10.Testing and inspection
1 Scope
This document specifies the protection control and related equipment in the substation secondary system, the station monitoring system, and the substation centralized monitoring system (hereinafter referred to as Centralized control system, general requirements and test conditions for preventing electrical operation errors, as well as type test, factory inspection, integrated test and on-site Inspection content, methods and requirements.
This document applies to the design, development, testing, construction, operation, maintenance and overhaul of substation secondary systems.
2 Normative references
GB/T 7261
GB/T 13729
GB/T 14285
GB/T 14598.3
GB/T 14598.301
GB/T 16814
GB/T 17215.211-2021
GB/T 17215.301
GB/T 17215.303-2022
GB/T 19520.12
GB/T 19862-2016
GB/T 21050-2019
GB/T 20272-2019
GB/T 20273-2019
GB/T 26862-2011
GB/T 26864
GB/T 26866-2022
GB/T 26865.2
GB/T 30094
GB/T 31994-2015
GB/T 34132
GB/T 34871
GB/T 34943-2017
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 7261Basic test methods for protection relays and security automatic equipment
- GB/T 13729Remote terminal unit equipment
- GB/T 14285Technical code for relaying protection and security automatic equipment
- GB/T 14598.301Technical requirements for power system continuous recorder
- GB/T 16814Methods of measurement for Synchronous digital Hierarchy (SDH) optical fiber cable line system
- GB/T 17215.211-2021Electricity metering equipment(AC) - General requirements, tests and test conditions - Part 11: Metering equipment
GB/T 14598.3 · GB/T 19520.12
Editions of GB/T 45906.10
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 45906.10-2025 | Substation secondary system - Part 10: Test and detection | current edition | Current |
This page sells the current edition, GB/T 45906.10-2025. Earlier editions are listed for reference only.
How to Buy GB/T 45906.10-2025
- 1Add to cart. Click the "Buy GB/T 45906.10-2025" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 13729-2019 — Remote terminal unit equipment
GB/T 14285-2023 — Technical code for relaying protection and security automatic equipment
GB/T 14598.300-2017 — General specification for transformer protection equipment