GB/T 17215.303-2022Electricity metering equipment (AC) - Particular requirements - Part 3: Digital input electricity meters (English PDF)
交流电测量设备 特殊要求 第3部分:数字化电能表
Open the GB/T 17215.303-2022 preview as PDF
This is a limited preview
Buy now to download the full PDF (84 pages)
Issued by
State Administration for Market Regulation; Standardization Administration of China
Level / Type
National · Recommended
Issue date
April 15, 2022
Implementation date
November 1, 2022
Scope
GB/T 17215.303-2022 is the English-translated version of 交流电测量设备 特殊要求 第3部分:数字化电能表.
China's national requirements for digital input electricity meters - meters that never see the primary voltage or current, and receive sampled values over a network instead. It specifies the classification and standard electrical values, the structure, the meter marking and documentation, the metrological performance requirements and tests, the structural safety requirements, the climatic environment, external influences, the protection of metrological performance, the electrical requirements, the functional requirements and the type tests. It applies to newly manufactured meters installed on 50 Hz or 60 Hz networks, connected through electronic transformers or stand-alone merging units, and fed with digitised sampled values conforming to DL/T 860.92 or GB/T 20840.9. In a digital substation there is no analogue signal to meter. The current and voltage are digitised at the switchyard by an electronic transformer or a merging unit and published on a process bus as a stream of sampled values, and every protection relay, recorder and meter takes the same stream. That changes what a meter is. Its accuracy no longer depends on an input circuit at all: it depends on the sampled value stream and on the arithmetic performed on it, and the errors that matter are of a different kind - lost or delayed frames, timestamp jitter, loss of time synchronisation, a subscription to the wrong dataset, a quality flag ignored. A meter that computes perfectly from corrupted or misaligned input is worse than an inaccurate analogue one, because nothing in the reading shows that anything is wrong. The standard therefore covers both the metrology and the digital behaviour: how accuracy is defined and tested when the input is a data stream, what the meter must do when frames are missing or quality flags are set, how time synchronisation is required and verified, and how the metrological configuration is protected from alteration. Issued on 15 April 2022 and in force since 1 November 2022, it replaces GB/T 17215.303-2013.
Document preview — GB/T 17215.303-2022
National Standard of the People's Republic of China
- ICS
- 17.220.20
- Classification
- N 22
- Replacing
- GB/T 17215.303-2013
Issued by: State Administration for Market Regulation; Standardization Administration of China
Contents
- 1 Scope
- 2 Normative references
- 3 Digital Energy Meters
- 11 Measuring equipment
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part
1.Structure and Drafting Rules of Standardization Documents" drafted. This document is part 3 of GB/T 17215.3.GB/T 17215.3 has released the following parts.
---GB/T 17215.301 Special requirements for multifunctional electric energy meters;
---GB/T 17215.302 Particular requirements for alternating current measuring equipment Part
2.Static harmonic active energy meters;
--- GB/T 17215.303 Particular requirements for alternating current measuring equipment Part
3.Digital electric energy meter;
---GB/T 17215.304 Particular requirements for alternating current measuring equipment Part
4.Static electricity connected via electronic transformers energy table;
--- GB/T 17215.311 Particular requirements for alternating current measuring equipment Part
11.Electromechanical active energy meters (0.5, 1 and 2);
---GB/T 17215.321 Electrical Measuring Equipment (AC) - Special Requirements Part
21.Static Active Energy Meters (Class A, B, C, D and E);
--- GB/T 17215.323 Particular requirements for alternating current measuring equipment Part
1 Scope
China's national requirements for digital input electricity meters - meters that never see the primary voltage or current, and receive sampled values over a network instead. It specifies the classification and standard electrical values, the structure, the meter marking and documentation, the metrological performance requirements and tests, the structural safety requirements, the climatic environment, external influences, the protection of metrological performance, the electrical requirements, the functional requirements and the type tests. It applies to newly manufactured meters installed on 50 Hz or 60 Hz networks, connected through electronic transformers or stand-alone merging units, and fed with digitised sampled values conforming to DL/T 860.92 or GB/T 20840.9. In a digital substation there is no analogue signal to meter. The current and voltage are digitised at the switchyard by an electronic transformer or a merging unit and published on a process bus as a stream of sampled values, and every protection relay, recorder and meter takes the same stream. That changes what a meter is. Its accuracy no longer depends on an input circuit at all: it depends on the sampled value stream and on the arithmetic performed on it, and the errors that matter are of a different kind - lost or delayed frames, timestamp jitter, loss of time synchronisation, a subscription to the wrong dataset, a quality flag ignored. A meter that computes perfectly from corrupted or misaligned input is worse than an inaccurate analogue one, because nothing in the reading shows that anything is wrong. The standard therefore covers both the metrology and the digital behaviour: how accuracy is defined and tested when the input is a data stream, what the meter must do when frames are missing or quality flags are set, how time synchronisation is required and verified, and how the metrological configuration is protected from alteration. Issued on 15 April 2022 and in force since 1 November 2022, it replaces GB/T 17215.303-2013.
This document specifies the classification and standard electricity value, structure, meter identification and Documentation, metrological performance requirements and tests, structural safety requirements, climatic environment, external influences, metrological performance protection requirements, electrical requirements, functional requirements Request, type test. This document is suitable for installation and use in 50Hz or 60Hz power grid, via Electronic Transformer (ET) or Independent Merging Unit (SAMU) Access, and input the newly manufactured meter that complies with the DL/T 860.92 or GB/T 20840.9 specification of the digitized sampling value.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.
GB/T 2423.1-2008 Environmental Testing of Electrical and Electronic Products Part
11 Measuring equipment
GB/T 17215.301-2007 Special requirements for multifunctional electric energy meters
GB/T 17626.2-2018 Electromagnetic Compatibility Test and Measurement Technology Electrostatic Discharge Immunity Test
GB/T 17626.3-2016 Electromagnetic compatibility test and measurement technology Radio frequency electromagnetic field radiation immunity test
GB/T 17626.4-2018 Electromagnetic Compatibility Test and Measurement Technology Electrical Fast Transient Burst Immunity Test
GB/T 17626.5-2019 Electromagnetic Compatibility Test and Measurement Technology Surge (Shock) Immunity Test
GB/T 17626.6-2017 Electromagnetic Compatibility Test and Measurement Technology Conducted Disturbance Immunity Induced by Radio Frequency Fields
GB/T 17626.12-2013 Electromagnetic Compatibility Test and Measurement Technology Ringing Wave Immunity Test
GB/T 17626.18-2016 Electromagnetic Compatibility Test and Measurement Technology Damped Oscillating Wave Immunity Test GB T17626.20-2014 Electromagnetic Compatibility Test and Measurement Technology Transverse Electromagnetic Wave (TEM) Waveguide Emission and Immunity test
GB/T 17626.29-2006 Electromagnetic compatibility test and measurement technology DC power input port voltage dips, short-term interruptions and Voltage Variation Immunity Test
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 84 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 4208-2017Degrees of protection provided by enclosures (IP code)
- GB/T 17215.211-2021Electricity metering equipment(AC) - General requirements, tests and test conditions - Part 11: Metering equipment
- GB/T 17215.301-2007Electricity metering equipment (AC) - Particular requirements - Part 1: Multi-function electricity meters
- GB/T 17626.12-2013Electromagnetic compatibility - Testing and measurement techniques - Part 12: Ring wave immunity test
GB/T 2423.1-2008 · GB/T 2423.2-2008 · GB/T 2423.4-2008 · GB/T 2423.43-2008 · GB/T 17626.2-2018 · GB/T 17626.3-2016 · GB/T 17626.4-2018 · GB/T 17626.5-2019 · GB/T 17626.6-2017 · GB/T 17626.18-2016 · GB/T 17626.29-2006
Similar standards
GB/T 17215.301-2024|GB/T 17215.302-2024|GB/T 20840.9-2017|GB/T 17215.321-2008|GB/T 17215.322-2008|GB/T 17215.303-2013
Editions of GB/T 17215.303
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 17215.303-2022 | Electricity metering equipment (AC) - Particular requirements - Part 3: Digital input electricity meters | first revision | Current |
| GB/T 17215.303-2013 | Electricity metering equipment (AC) - Particular requirements - Part 3: Digital input electricity meters | first issue | Superseded |
This page sells the current edition, GB/T 17215.303-2022. Earlier editions are listed for reference only.
How to Buy GB/T 17215.303-2022
- 1Add to cart. Click the "Buy GB/T 17215.303-2022" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 17215.211-2021 — Electricity metering equipment(AC) - General requirements, tests and test conditions - Part 11: Metering equipment
GB/T 4208-2017 — Degrees of protection provided by enclosures (IP code)
GB/T 17215.301-2024 — Electricity metering equipment (AC) - Particular requirements - Part 1: Multi-function electricity meters
Secure payment via Stripe
Payments accepted
GB/T 17215.303-2022
$660.00