Scope

GB/T 19963.2-2024 is the English-translated version of 风电场接入电力系统技术规定 第2部分:海上风电.

GB/T 19963.2-2024 is the offshore part of the Chinese grid connection specification for wind power. China has built more offshore wind capacity than anyone else, and offshore plant connects differently from onshore: it comes ashore through long submarine cables, sometimes through HVDC, its collection network has a very different reactive behaviour, and the plant itself is large enough that its response during a system fault matters to the stability of the whole grid. The standard sets the general requirements and then the connection requirements in the order the grid code addresses them: the active power control and its ramp rates, the power forecasting the plant must provide, the reactive power and voltage control, the fault ride-through behaviour for both voltage dips and swells and the reactive current support required during a fault, the frequency response and the inertia or fast frequency support, the power quality, the protection and the requirements on the measurement, communication and dispatch interface. It takes effect on 1 April 2025.

Document preview — GB/T 19963.2-2024

National Standard of the People's Republic of China

ICS
27.180
Classification
F11

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions1
  • 4 General Requirements2
  • 5 Active power2
  • 6 Power prediction2
  • 7 Reactive voltage3
  • 8 Fault Ride-Through5
  • 9 Operational suitability6
  • 10 Power Quality7
  • 11 Simulation Model and Parameters7
  • 12 Secondary System7
  • 10 Reference11

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part

1.Structure and drafting rules for standardization documents" Drafting. This document is Part 2 of GB/T 19963 Technical Regulations for Wind Farm Connection to Power System. GB/T 19963 has been published as follows: Lower part.

1.Onshore wind power;

2.Offshore wind power. This document partially replaces GB/T 19963-2011 "Technical Regulations for Wind Farm Access to Power System" and is consistent with GB/T 19963-2011. In addition to structural adjustments and editorial changes, the main technical changes are as follows:

--- Changed the scope of application of this document (see Chapter 1, Chapter 1 of the.2011 edition);

--- Added the terms "offshore wind farm", "offshore wind farm grid connection point" and "offshore wind farm collection point", and deleted the terms "wind farm" and "wind power" "Grid connection point" and other terms (see Chapter 3, Chapter 3 of the.2011 edition);

--- Deleted the content of "wind farm transmission lines" (see Chapter 4 of the.2011 edition);

--- Added requirements for primary frequency regulation and inertia response of wind farms (see 5.2);

--- Changed the basic requirements for wind farm power forecasting and the requirements for reporting forecast curves, and added reporting of power forecasting operation conditions and predictive performance requirements (see Chapter 6, Chapter 6 of the.2011 edition);

--- Changed the requirements for wind farm reactive power supply, reactive capacity configuration and voltage control (see Chapter 7, Chapter 6 and Chapter 7);

--- Added requirements for dynamic reactive support for low voltage ride-through, high voltage ride-through and continuous ride-through (see Chapter 8);

--- Added requirements for analysis and prevention of broadband oscillations in wind farms (see Chapter 9);

--- Added power quality requirements for wind farm collection points (see 10.2);

--- Changed the requirements for wind farm simulation models, and added content on model evaluation and parameter changes (see Chapter 11,.2011 edition). 12);

1 Scope

GB/T 19963.2-2024 is the offshore part of the Chinese grid connection specification for wind power. China has built more offshore wind capacity than anyone else, and offshore plant connects differently from onshore: it comes ashore through long submarine cables, sometimes through HVDC, its collection network has a very different reactive behaviour, and the plant itself is large enough that its response during a system fault matters to the stability of the whole grid. The standard sets the general requirements and then the connection requirements in the order the grid code addresses them: the active power control and its ramp rates, the power forecasting the plant must provide, the reactive power and voltage control, the fault ride-through behaviour for both voltage dips and swells and the reactive current support required during a fault, the frequency response and the inertia or fast frequency support, the power quality, the protection and the requirements on the measurement, communication and dispatch interface. It takes effect on 1 April 2025.

This document specifies the overall requirements for offshore wind farm access to the power system, active power, power forecast, reactive voltage, fault ride-through, operation The adaptability, power quality, simulation models and parameters, technical requirements of secondary systems, and test and evaluation contents are discussed. This document applies to newly built or modified (expanded) offshore power transmission lines connected to the power system through industrial frequency AC transmission lines or flexible DC transmission systems. Access, commissioning and operation of wind farms.

2 Normative references

The contents of the following documents constitute essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document.

GB/T 12326 Power quality voltage fluctuation and flicker

GB/T 14285 Technical specification for relay protection and safety automatic devices

GB/T 14549 Power quality - Harmonics in public power grids

GB/T 15543 Power quality three-phase voltage unbalance

GB/T 19862 General requirements for power quality monitoring equipment

GB/T 19963.1 Technical regulations for connecting wind farms to power systems Part

3 Terms and definitions

The terms and definitions defined in GB/T 19963.1 and NB/T 31047.2 and the following apply to this document.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

GB 38031-2025|GB/T19963.2-2024|GB/T 19963-2011|GB/T 1.1-2020|GB/T 19963|GB/T 19963.|GB/T 12326|GB/T 14285

How to Buy GB/T 19963.2-2024

  1. 1Add to cart. Click the "Buy GB/T 19963.2-2024" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 19963.2-2024

$305.00

$260.00for partners