GB 146.2-2020Gauge for standard gauge railways - Part 2: Structure gauge (English PDF)
标准轨距铁路限界 第2部分:建筑限界
This is a limited preview
Buy now to download the full PDF (18 pages)
Need quotation for your management?
Get a formal quotation for GB 146.2-2020 in 30 minutes.
Issued by
State Administration for Market Regulation; Standardization Administration of China
Level / Type
National · Mandatory
Issue date
October 11, 2020
Implementation date
May 1, 2021
Scope
GB 146.2-2020 is the English-translated version of 标准轨距铁路限界 第2部分:建筑限界.
GB 146.2-2020 is Part 2 of the Chinese national standard on gauges for 1 435 mm standard gauge railways and covers the structure gauge.
It specifies the basic, tunnel, bridge and combined bridge and tunnel structure gauges, and defines the structure gauge as the limiting cross-section inside which no equipment or structure other than rolling stock and the equipment interacting with it may intrude.
It gives separate gauges for passenger and freight railways up to 160 km/h, for those above 160 km/h and for passenger dedicated lines, together with the widening of the gauge on curves and the treatment of signals, overhead line equipment, canopies and station structures.
It applies to the design, construction, operation and maintenance of those lines. It replaces GB 146.2-1983, was issued on 11 October 2020 and has applied since 1 May 2021.
Found what you need?
Document preview — GB 146.2-2020
National Standard of the People's Republic of China
- ICS
- 93.100
- Classification
- S 04
- Replacing
- GB 146.2-1983
Issued by: State Administration for Market Regulation; Standardization Administration of China
Contents
- Foreword3
- 1 Scope5
- 2 Terms and definitions5
- 3 General5
- 4 v<=160 km/h passenger and freight railway structure gauge6
- 5 v >160 km/h passenger and freight railway structure gauge12
- 6 Passenger dedicated line structure gauge14
Foreword
GB 146, Gauge for standard gauge railways, is divided into two parts.
-- Part 1: Rolling stock gauge;
-- Part 2: Structure gauge.
This Part is Part 2 of GB 146.
This Part was drafted in accordance with the rules given in GB/T 1.1-2009.
This Part replaces GB 146.2-1983, Structure gauge for standard gauge railways; compared with GB 146.2-1983, the main technical changes, except editorial changes, are as follows.
-- Modify the name of the railway structure gauge to v <= 160 km/h passenger and freight railway structure gauge (see Chapter 4; Chapter 4 of version 1983);
-- Modify the platform gauge height in the basic structure gauge (see Chapter 4; 4.1.1 of version 1983);
-- For tunnel gauge-1 and tunnel gauge-2, add the lower contour line of newly-built tunnel at the lower gauge of 25 mm ~ 1 210 mm above the rail surface (see 4.2.1, 4.2.2; 4.2.1, 4.2.2 of version 1983);
-- Delete tunnel gauge-1B, tunnel gauge 02B, bridge gauge-1B, bridge gauge-2B (see 4.2.1, 4.2.2, 4.3.1, and 4.3.2 of version 1983);
-- Add v > 160 km/h passenger and freight railway structure gauge (see Chapter 5);
-- Add the passenger dedicated line structure gauge (see Chapter 6);
-- Delete the reference diagram of the pantograph position of electrified railway (see Appendix A of version 1983);
-- Delete the reference diagram of the off-gauge goods loading gauge (see Appendix B of version 1983).
1 Scope
This Part of GB 146 specifies the basic structure gauge, tunnel structure gauge, bridge structure gauge and bridge and tunnel structure gauge of 1 435 mm standard gauge railway tracks.
This Part applies to the design, construction, operation and maintenance of the following standard gauge railway tracks.
-- v <= 160 km/h passenger and freight railway;
-- v > 160 km/h passenger and freight railway;
-- Passenger dedicated railway.
2 Terms and definitions
The following terms and definitions are applicable to this document.
2.1 Structure gauge
The limit cross-sectional contour perpendicular to the center line of the track.
Within this contour, except for rolling stock and the equipment interacting with rolling stock and related equipment (such as vehicle reducer, contact wire, hanging string, locator), other equipment or structures shall not be invaded.
3 General
3.1 Whether it is a new rail or an old rail (including the long-term replacement of heavy rail thickened track beds), the structure gauge dimension that is calculated from the rail surface shall meet the requirements.
3.2 The dimensions on each structure gauge drawing of this Part are based on the track on the horizontal straight road.
4 v<=160 km/h passenger and freight railway structure gauge
4.1 Basic structure gauge
4.2 Tunnel structure gauge
4.3 Bridge structure gauge
5 v >160 km/h passenger and freight railway structure gauge
5.1 Basic structure gauge
5.2 Bridge and tunnel structure gauge
5.2.1 The bridge and tunnel structure gauge in the internal combustion traction section adopts the contour dimensions of the bridge gauge-1, as shown in Figure 5. It is applicable to the v > 160 km/h internal combustion traction passenger and freight railways which are newly built or rebuilt after 2003.
6 Passenger dedicated line structure gauge
6.1 Structure gauge-4 is the basic structure gauge of passenger dedicated line railways, as shown in Figure 9.
6.2 Structure gauge-4 is applicable to passenger special railways which are newly built and rebuilt after 2000.
6.3 The widening amount of the structure gauge on the curve.
When the maximum width of the structure gauge is 4 880 mm, calculate the widening amount W1 inside of the curve according to Formula (4)
6.4 For the structure gauge of signal machine and overhead line system, flyover, overbridge, electric lighting, canopy and other bolt supports and elevated waiting room structure column, the structure gauge of the short starting signal that runs in the opposite direction in the station, and station structure gauge, see 4.1.1.3 for the widening calculation method. […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 18 pages — is available in the English PDF.
Referenced standards
Cited by
- GB/T 16904.2-2025Checking of rolling stock clearance for standard gauge railways - Part 2: Inspection device
- GB/T 25335-2025Railway heavy-duty construction machinery - T-girder erecting machines
- GB/T 25339-2025Railway heavy-duty construction machinery - Track panel laying machines
- GB/T 33627-2025General requirement of aero-derivative gas turbine assembly enclosure
- NB/T 11643-2024General technical standard of coal batch weigh wagon loading system
- GB/T 42860-2023General requirements of transportation for launch vehicle
Similar standards
Editions of GB 146.2
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB 146.2-2020 | Gauge for standard gauge railways - Part 2: Structure gauge | first revision | Current |
| GB 146.2-1983 | Gauge for standard gauge railways - Part 2: Structure gauge | first issue | Superseded |
This page sells the current edition, GB 146.2-2020. Earlier editions are listed for reference only.
How to Download GB 146.2-2020
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 146.1-2020 — Gauge for standard gauge railways - Part 1: Rolling stock gauge
GB 11118-2026 — Hydraulic fluids (L-HL, L-HM, L-HV, L-HS and L-HG type)
GB 11557-2026 — Provisions for protecting drivers from injury by the steering mechanism of motor vehicles
Secure payment via Stripe
Payments accepted
GB 146.2-2020
$105.00