NB/T — Energy Industry

Found: 3876 — page 31 of 81

Valid

NB/T 20009.9-2021 — Welding consumables for pressurized water reactor nuclear power plants - Part 9: Carbon steel wires and fluxes for submerged arc welding

National·Recommended
Instant delivery (0–9 sec)
$539.00PDF
Valid

NB/T 20010.16-2021 — PWR nuclear power plant valve - Part 16: Online sealing test for safety class valves

Industry·Recommended
Instant delivery (0–9 sec)
$255.0015 pages
Valid

NB/T 20015-2021 — Nuclear power plant simulators for use in operator training and examination

Industry·Recommended
Instant delivery (0–9 sec)
$455.0042 pages
Valid

NB/T 20017-2021 — Structural integrity test of prestressed concrete containments for pressurized water reactor nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$360.0020 pages
Valid

NB/T 20018-2021 — Containment leaktightness test for PWR nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$420.0024 pages
Valid

NB/T 20031-2021 — Control of combustible gas concentration in the containment after accidents in pressurized water reactor nuclear power plant

Industry·Recommended
Instant delivery (0–9 sec)
$495.0028 pages
Valid

NB/T 20037.2-2021 — Level 1 probabilistic safety assessment for nuclear power plant applications - Part 2: Internal events at low power and shutdown

Industry·Recommended
Instant delivery (0–9 sec)
$620.0040 pages
Valid

NB/T 20037.3-2021 — Level 1 probabilistic safety assessment for nuclear power plant applications - Part 3: Internal flooding at power

Industry·Recommended
Instant delivery (0–9 sec)
$360.0020 pages
Valid

NB/T 20037.4-2021 — Level 1 probabilistic safety assessment for nuclear power plant applications - Part 4: Internal fire at power

Industry·Recommended
Instant delivery (0–9 sec)
$545.0035 pages
Valid

NB/T 20037.5-2021 — Level 1 probabilistic safety assessment for nuclear power plant applications - Part 5: Earthquake at power

Industry·Recommended
Instant delivery (0–9 sec)
$530.0035 pages
Valid

NB/T 20039.1-2021 — Code on nuclear air and gas treatment - Ventilation, air conditioning and air cleaning - Part 1: Fans and blowers

Industry·Recommended
Instant delivery (0–9 sec)
$465.0026 pages
Valid

NB/T 20040-2021 — Seismic qualification test rules of safety classified electrical equipment for nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$485.0024 pages
Valid

NB/T 20044-2021 — Technical regulation for construction and acceptance of reactor internals installation in PWR nuclear power plant

Industry·Recommended
Instant delivery (0–9 sec)
$360.0020 pages
Valid

NB/T 20068-2021 — Requirements for dealing with common cause failures of instrumentation and control systems important to safety in nuclear power plants

National·Recommended
Instant delivery (0–9 sec)
$699.00PDF
Valid

NB/T 20097-2021 — Concrete containment system functional design requirements for PWR nuclear power plant

Industry·Recommended
Instant delivery (0–9 sec)
$470.0031 pages
Valid

NB/T 20101-2021 — Analysis requirement for rod ejection accidents of pressurized water reactor nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$255.0015 pages
Valid

NB/T 20108-2021 — Technical regulation of containment penetration installation in PWR nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid

NB/T 20143.4-2021 — Code for nuclear air and gas treatment - Process gas treatment - Part 4: Compressor

Industry·Recommended
Instant delivery (0–9 sec)
$300.0017 pages
Valid

NB/T 20159-2021 — The construction technical specification for steel liner of PWR nuclear power plant

Industry·Recommended
Instant delivery (0–9 sec)
$510.0029 pages
Valid

NB/T 20160-2021 — Technical specification for covering construction of stainless steel pool in PWR nuclear power plant

Industry·Recommended
Instant delivery (0–9 sec)
$420.0024 pages
Valid

NB/T 20161-2021 — Technical regulations for installation and testing of external neutron fluence rate measurement system for pressurized water reactor nuclear power plants

National·Recommended
Instant delivery (0–9 sec)
$539.00PDF
Valid

NB/T 20259.2-2021 — Code of valuation on bill of quantities of nuclear power plant construction works - Part 2: Construction works

Industry·Recommended
Instant delivery (0–9 sec)
$3,125.00214 pages
Valid

NB/T 20259.3-2021 — Code of valuation on bill of quantities of nuclear power plant construction works - Part 3: Process equipment and pipe installation

Industry·Recommended
Instant delivery (0–9 sec)
$1,625.00109 pages
Valid

NB/T 20259.4-2021 — Code of valuation on bill of quantities of nuclear power plant construction works - Part 4: Ventilation and air conditioning equipment installation

Industry·Recommended
Instant delivery (0–9 sec)
$455.0030 pages
Valid

NB/T 20259.5-2021 — Code of valuation on bill of quantities of nuclear power plant construction works - Part 5: Electrical equipment installation

Industry·Recommended
Instant delivery (0–9 sec)
$920.0056 pages
Valid

NB/T 20259.6-2021 — Code of valuation on bill of quantities of nuclear power plant construction works - Part 6: Automatic control instrumentation installation

Industry·Recommended
Instant delivery (0–9 sec)
$500.0033 pages
Valid

NB/T 20263-2021 — Code for design of communication system of nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$360.0020 pages
Valid

NB/T 20343-2021 — Design and fabrication specification for the thermal insulation of reactor vessel and reactor coolant piping and equipment of PWR nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$360.0020 pages
Valid

NB/T 20358.14-2021 — Budget quotas of nuclear power plant construction project works - Part 14: Manufacture of module and containment vessel

Industry·Recommended
Instant delivery (0–9 sec)
$4,700.00266 pages
Valid

NB/T 20358.15-2021 — Budget quotas of nuclear power plant construction project works - Part 15: Assembly and installation of module and steel containment vessel

Industry·Recommended
Instant delivery (0–9 sec)
$1,775.00114 pages
Valid

NB/T 20421.5-2021 — Monitoring method for safety important cables in nuclear power plants - Part 5: Optical time domain reflection

Industry·Recommended
Instant delivery (0–9 sec)
$420.0024 pages
Valid

NB/T 20445.3-2021 — Level 2 probabilistic safety assessment for nuclear power plant applications - Part 3: Internal events at low power and shutdown

Industry·Recommended
Instant delivery (0–9 sec)
$465.0026 pages
Valid

NB/T 20560.1-2021 — Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plant - Part 1: General technical requirements

Industry·Recommended
Instant delivery (0–9 sec)
$255.0015 pages
Valid

NB/T 20560.2-2021 — Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plants - Part 2: Technical requirements for debris source walkdown

Industry·Recommended
Instant delivery (0–9 sec)
$180.0015 pages
Valid

NB/T 20560.3-2021 — Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plants - Part 3: Technical requirements for upstream effects analysis

Industry·Recommended
Instant delivery (0–9 sec)
$300.0017 pages
Valid

NB/T 20560.5-2021 — Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plants - Part 5: Technical requirements for debris head loss test

Industry·Recommended
Instant delivery (0–9 sec)
$180.0015 pages
Valid

NB/T 20560.7-2021 — Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plant - Part 7: Technical requirements for downstream (in-vessel) effects test

Industry·Recommended
Instant delivery (0–9 sec)
$315.0018 pages
Valid

NB/T 20579-2021 — Reference index for commissioning of nuclear power plant construction project

Industry·Recommended
Instant delivery (0–9 sec)
$830.0084 pages
Valid

NB/T 20580.2-2021 — Budget estimation norm of nuclear power plant construction project works - Part 2: Mechanical equipment installation engineering for nuclear island

Industry·Recommended
Instant delivery (0–9 sec)
$2,510.00187 pages
Valid

NB/T 20580.4-2021 — Budget estimation norm of nuclear power plant construction project works - Part 4: Ventilation and air-conditioning installation engineering for nuclear island

Industry·Recommended
Instant delivery (0–9 sec)
$1,070.0065 pages
Valid

NB/T 20580.5-2021 — Budget estimation norm of nuclear power plant construction project works - Part 5: Electrical equipment installation engineering for nuclear island

Industry·Recommended
Instant delivery (0–9 sec)
$1,100.0066 pages
Valid

NB/T 20580.6-2021 — Budget estimation norm of nuclear power plant construction project works - Part 6: Automation control instrument and communication equipment installation engineering for nuclear island

Industry·Recommended
Instant delivery (0–9 sec)
$2,375.00137 pages
Valid

NB/T 20580.8-2021 — Budget estimation norm of nuclear power plant construction project works - Part 8: Thermal equipment installation engineering for conventional island

Industry·Recommended
Instant delivery (0–9 sec)
$2,525.00184 pages
Valid

NB/T 20580.9-2021 — Budget estimation norm of nuclear power plant construction project works - Part 9: Electrical equipment installation engineering for conventional island

Industry·Recommended
Instant delivery (0–9 sec)
$4,835.00276 pages
Valid

NB/T 20582-2021 — Commissioning technical guideline for reactor boron and water makeup system of PWR nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$195.0015 pages
Valid

NB/T 20583-2021 — Technical guideline for loss of control power test of PWR nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$105.0015 pages
Valid

NB/T 20584-2021 — Technical guideline for secondary circuit vacuum tightness test of PWR nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$90.0015 pages
Valid

NB/T 20585-2021 — Guideline for trend analysis of operating events in nuclear power plants

Industry·Recommended
Instant delivery (0–9 sec)
$195.0015 pages