GB/T 45906.6-2025Substation secondary system — Part 6: Substation monitoring and control system (English PDF)
变电站二次系统 第6部分:站内监控系统
Open the GB/T 45906.6-2025 preview as PDF
This is a limited preview
Buy now to download the full PDF (15 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
August 1, 2025
Implementation date
February 1, 2026
Scope
GB/T 45906.6-2025 is the English-translated version of 变电站二次系统 第6部分:站内监控系统.
GB/T 45906.6-2025 is the Chinese national standard covering the computer system an operator actually watches a substation through — the system architecture and configuration, the power supply and environmental conditions and the hardware and software it runs on, the platform, monitoring, control, maintenance and patrol functions, the human-machine interface, the information exchange inside the station and with the master station, and the performance figures that decide how fast a command reaches the switchgear. Part 6 of the series, with the data and model part GB/T 45906.2-2025. First edition, under the China Electricity Council. In force from 1 February 2026. Issued on 1 August 2025, it has been in force since 1 February 2026.
Document preview — GB/T 45906.6-2025
National Standard of the People's Republic of China
- ICS
- 29.240.10
- Classification
- F 20
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Abbreviations
- 5 General Requirements
- 6 Overall Architecture
- 6.1 System Architecture
- 6.2 System Configuration
- 7 Normal working conditions
- 7.1 Power supply and environmental requirements
- 7.2 Hardware Requirements
- 7.3 Software Requirements
- 8 Functional Requirements
- 8.1 Platform Functions
- 8.2 Monitoring Function
- 8.3 Control Function
- 8.4 Maintenance Function
- 8.5 Patrol Function
- 9 Human-Machine Interface
- 10 Information Interaction10
- 10.1 Information Interaction within the Site
- 10.2 Information Interaction with the Master Station
- 11 Performance Requirements11
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
This document is Part 6 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts.
— Part 1: General requirements;
— Part 2: Data and models;
— Part 3: Communication message specifications;
— Part 4: Network security protection;
— Part 5: Protection, control and related equipment;
— Part 6: Station monitoring system;
— Part 7: Centralized monitoring system;
— Part 8: Electrical operation error prevention;
— Part 9: Construction specifications;
— Part 10.Testing and inspection.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Grid Operation and Control Standardization Technical Committee (SAC/TC446), the National Electric Power System Management and its Information It is under the jurisdiction of the Technical Committee for Standardization of Information Exchange (SAC/TC82).
This document was drafted by: State Electric Power Dispatching and Control Center, China Electric Power Research Institute Co., Ltd., China Southern Power Grid Power Dispatching Control Center, Beijing Sifang Relay Protection Engineering Technology Co., Ltd., State Grid Tianjin Electric Power Company, State Grid Jiangsu Electric Power Company, State Grid Liaoning Electric Power Company Provincial Electric Power Co., Ltd., State Grid Corporation of China East China Branch, State Grid Chongqing Electric Power Company, Xuji Electric Co., Ltd., NARI Technology Co., Ltd., Guodian Nanjing Automation Co., Ltd., Nanjing NARI Relay Protection Electric Co., Ltd., Changyuan Shenzhen Ruijie Automation Co., Ltd., Kylin Software Co., Ltd., State Grid Shandong Electric Power Company, State Grid Economic and Technological Research Institute Co., Ltd., Guangxi Power Grid Co., Ltd.
The company's Electric Power Research Institute, Inner Mongolia Electric Power (Group) Co., Ltd., and State Grid Hebei Electric Power Co., Ltd.
The main drafters of this document are: Chang Naichao, Zhao Na, Li Jin, Wang Guochun, Li Dan, Qin Hongxia, Li Jinsong, Chen Jian, Liu Xiaoping, Zhang Qibing, Wang Shunjiang, Qu Gang, Li Dezhi, Wang Shenqiang, Fang Wei, Zhang Jinhu, Diao Dongyu, Zhang Wei, Li Yalei, Ji Xin, Zhang Haining, Cui Xu, Ge Liqing, Teng Jingyu, Zhu Jiayun, Jia Liwei, Fang Ping, Zhao Mingyang, Li Qiyu, Guo Peng, Han Xinglei, Zhou Shengqi, Wu Congying, Zhou Ke, An Shengdong, Qin Zening, and Fan Ruiyi.
Introduction
In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized.
Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system List standards.
GB/T 45906 "Substation Secondary System" comprehensively covers general requirements, equipment system functional requirements, project implementation and testing, etc.
The substation secondary system is planned to consist of 10 parts.
— Part 1: General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction, Network security and other technical requirements.
— Part 2: Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection Processing requirements, modeling methods, and model configuration processes.
— Part 3: Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication The implementation method of the service.
— Part 4: Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems.
— Part 5: Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment.
— Part 6: Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc.
— Part 7: Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and Mutual technical requirements.
— Part 8: Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and Energy, performance and application requirements.
— Part 9: Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering.
System and technical requirements.
— Part 10.Testing and inspection. The purpose is to standardize the general principles and requirements for the inspection of substation secondary system equipment and systems. Please wait. Substation secondary system Part 6: Station Monitoring System
1 Scope
This document specifies the overall requirements, overall architecture, normal working conditions, functional requirements, human-machine interface, signal processing, and other aspects of the substation monitoring system.
Information interaction and performance requirements.
This document applies to the design, development, testing, construction, operation, maintenance and overhaul of substation monitoring systems.
2 Normative references
GB/T 9813.3
GB/T 26865.2
GB/T 33602
GB/T 34121
GB/T 36572
GB/T 37546
GB/T 45906.1
GB/T 45906.2
GB/T 45906.3
GB/T 45906.4
GB/T 45906.8
IEC 60870
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 9813.3General specification for computer—Part 3: Server
- GB/T 26865.2Real-time dynamic monitoring system of power system—Part 2: Protocols for data transferring
- GB/T 33602General service protocol for electric power system
- GB/T 34121Technical specification for relay protection configuration tool in smart substation
- GB/T 36572Guidelines of cyber security protection for electric power system supervision and control
- GB/T 37546Technical specification for unattended substation monitoring and control system
IEC 60870
Editions of GB/T 45906.6
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 45906.6-2025 | Substation secondary system - Part 6: Substation monitoring and control system | current edition | Current |
This page sells the current edition, GB/T 45906.6-2025. Earlier editions are listed for reference only.
How to Buy GB/T 45906.6-2025
- 1Add to cart. Click the "Buy GB/T 45906.6-2025" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 26865.2-2023 — Real-time dynamic monitoring system of power system—Part 2: Protocols for data transferring
GB/T 33602-2017 — General service protocol for electric power system
GB/T 34121-2017 — Technical specification for relay protection configuration tool in smart substation
Secure payment via Stripe
Payments accepted
GB/T 45906.6-2025
$245.00