GB/T 45906.3-2025Substation secondary system — Part 3: Communication message specification (English PDF)
变电站二次系统 第3部分:通信报文规范
Open the GB/T 45906.3-2025 preview as PDF
This is a limited preview
Buy now to download the full PDF (58 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
August 1, 2025
Implementation date
February 1, 2026
Scope
GB/T 45906.3-2025 is the English-translated version of 变电站二次系统 第3部分:通信报文规范.
GB/T 45906.3-2025 is the Chinese national standard covering how devices inside a substation talk to each other and to the master station — the protocol set, the application data frame with its negotiation, ports, timeouts and error handling, the data objects and their types, functional constraints and control blocks, and the services for reporting, logging, general substation events, multicast sampled values, control, files and remote procedure calls, plus the communication gateway that carries all of it to the outside. At 35,000 words. Part 3 of the series, with the equipment part GB/T 45906.5-2025 and the testing part GB/T 45906.10-2025. First edition, under the China Electricity Council. In force from 1 February 2026. Issued on 1 August 2025, it has been in force since 1 February 2026.
Document preview — GB/T 45906.3-2025
National Standard of the People's Republic of China
- ICS
- 29.240.10
- Classification
- F 20
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- PrefaceIII
- IntroductionIV
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions1
- 4 Abbreviations2
- 5 Communication Protocol Set2
- 6 data frame3
- 6.1 Application Protocol Data Unit3
- 6.2 Application Service Data Unit6
- 6.3 Empty Data Frame6
- 6.4 Data Frame Negotiation7
- 6.5 Frame transmission mode7
- 6.6 Service Port7
- 6.7 TCP Connection Control7
- 6.8 Error handling7
- 6.9 Timeout and Communication Status Detection7
- 6.10 Data Encoding8
- 6.11 Data Frame Based on ISO /IEC /IEEE8802-38
- 7 Data Objects9
- 7.1 Basic Data Types9
- 7.2 Extended Data Types10
- 7.3 Public ACSI Type11
- 7.4 Functional Constraints (FC)14
- 7.5 Control Objects14
- 7.6 Control Block16
- 7.7 Data Values and Definitions17
- 8 Communication Services1818
- 8.1 Interactive Mode18
- 8.2 Related Services19
- 8.3 Server, Logical Device, and Logical Node Services20
- 8.4 Data Services26
- 8.5 Dataset Services29
- 8.6 Fixed value services32
- 8.7 Reporting Services34
- 8.8 Log Services39
- 8.9 General Substation Event Services42
- 8.10 Multicast Sampled Value Service45
- 8.11 Control Services46
- 8.12 File Services53
- 8.13 Remote Procedure Call Services56
- 8.14 Testing Service (Test)60
- Appendix A (Normative) Communication Gateway Application61
- A.1 Working Mode61
- A.2 Communication Gateway Model61
- A.3 Communication Gateway Implementation62
- Appendix B (Informative) Communication Transmission Security63
- B.1 Overview63
- B.2 Transport Layer Security63
- B.3 Application Layer Security63
- Appendix C (Informative) Application in Auxiliary Control and Sensor Internet of Things65
- C.1 Working Mode65
- C.2 Device Model65
- C.3 Communication Data Classification65
- C.4 Communication Services66
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
This document is Part 3 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts.
— Part 1: General requirements;
— Part 2: Data and models;
— Part 3: Communication message specifications;
— Part 4: Network security protection;
— Part 5: Protection, control and related equipment;
— Part 6: Station monitoring system;
— Part 7: Centralized monitoring system;
— Part 8: Electrical operation error prevention;
— Part 9: Construction specifications;
— Part 10.Testing and inspection.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document was prepared by the National Grid Operation and Control Standardization Technical Committee (SAC/TC446), the National Electric Power System Management and Information Exchange The Standardization Technical Committee (SAC/TC82) will be transferred to this department for coordination.
This document was drafted by: China Electric Power Research Institute Co., Ltd., State Grid Corporation of China, State Grid Corporation of China East China Branch, State Grid Beijing Electric Power Company, State Grid Tianjin Electric Power Company, State Grid Shandong Electric Power Company, State Grid Jiangsu Electric Power Company, State Grid Zhejiang Electric Power Company Provincial Electric Power Co., Ltd., State Grid Hubei Electric Power Co., Ltd., State Grid Jilin Electric Power Co., Ltd., China Southern Power Grid Co., Ltd., Mongolia Electric Power (Group) Co., Ltd., China Three Gorges Corporation, Nanjing NARI Relay Protection Electric Co., Ltd., State Grid NARI Technology Co., Ltd., State Grid Electric Power Research Institute Co., Ltd., Beijing Sifang Relay Protection Automation Co., Ltd., and Dongfang Electronics Co., Ltd.
Co., Ltd., Changyuan Shenzhen Ruijibao Automation Co., Ltd., and Guodian Nanjing Automation Co., Ltd.
The main drafters of this document are: Dou Renhui, Chang Naichao, Wang Yongfu, Li Dan, Li Wenzhuo, Sheng Fu, Wang Lihua, Dai Xiaoxiang, Luo Huayu, Yu Jing, Liu Qianling, Ge Yachuan, Sun Fanen, Shi Zebing, Li Jin, Han Dong, Xiao Yongli, Sun Jun, Li Jinsong, Zhang Jinhu, Qu Gang, Guo Lei, Chen Jian, Zhang Qibing, Du Qiwei, Zheng Xiang, Hong Yue, Yang Song, Ren Hui, Wu Yanping, Yao Zhiqiang, Zhang Haiyan, Peng Zhiqiang, Ruan Lixiang, Liu Xuefei, Liang Zhengtang, Wang Zhihua, Sun Dan, Wang Zhenzhen, Zhao Na, Xu Xin, Yang Qing, Ren Hao, and Wang Shui.
Introduction
In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized.
Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system List standards.
GB/T 45906 "Substation Secondary System" comprehensively covers general requirements, equipment system functional requirements, project implementation and testing, etc.
The substation secondary system consists of 10 parts.
— Part 1: General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction, Network security and other technical requirements.
— Part 2: Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection Processing requirements, modeling methods, and model configuration processes.
— Part 3: Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication The implementation method of the service.
— Part 4: Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems.
— Part 5: Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment.
— Part 6: Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc.
— Part 7: Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and Mutual technical requirements.
— Part 8: Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and Energy, performance and application requirements.
— Part 9: Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering.
System and technical requirements.
— Part 10.Testing and inspection. The purpose is to standardize the general principles and requirements for the inspection of substation secondary system equipment and systems. Please wait. Substation secondary system Part 3: Communication message specifications
1 Scope
This document specifies the communication protocol set, data frames, data objects and communication services for data interaction in substation secondary systems.
This document applies to data and file transmission between devices within the substation secondary system, and between the substation secondary system and the master station.
2 Normative references
GB/T 16262.1
GB/T 16262.2
GB/T 16263.2
GB/T 33602
GB/T 42151.6
GB/T 42151.72
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Service Requester servicerequester
The entity that issues the request service primitive.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 58 pages — is available in the English PDF.
Referenced standards
Normative references
GB/T 16262.1 · GB/T 16262.2 · GB/T 16263.2 · GB/T 42151.6 · GB/T 42151.72
Cited by
Editions of GB/T 45906.3
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 45906.3-2025 | Substation secondary system - Part 3: Communication message specification | current edition | Current |
This page sells the current edition, GB/T 45906.3-2025. Earlier editions are listed for reference only.
How to Buy GB/T 45906.3-2025
- 1Add to cart. Click the "Buy GB/T 45906.3-2025" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 33602-2017 — General service protocol for electric power system
GB/T 45906.1-2025 — Substation secondary system — Part 1: General requirement
GB/T 45906.10-2025 — Substation secondary system — Part 10: Test and detection
Secure payment via Stripe
Payments accepted
GB/T 45906.3-2025
$1,040.00