GB/T 45906.8-2025Substation secondary system — Part 8: Preventing electric mal-operation (English PDF)
变电站二次系统 第8部分:电气操作防误
Open the GB/T 45906.8-2025 preview as PDF
This is a limited preview
Buy now to download the full PDF (15 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
August 1, 2025
Implementation date
February 1, 2026
Scope
GB/T 45906.8-2025 is the English-translated version of 变电站二次系统 第8部分:电气操作防误.
GB/T 45906.8-2025 is the Chinese national standard covering the interlocking that stops a switching operation being carried out in the wrong order — the functional architecture, the rule check and the locking of any operation that does not comply with it, the error prevention performed at the station control layer, the bay layer, the process layer and the master station so that no single layer is the only guard, and the application to remote, sequential and local operation. Part 8 of the series. First edition, under the China Electricity Council. In force from 1 February 2026. Issued on 1 August 2025, it has been in force since 1 February 2026.
Document preview — GB/T 45906.8-2025
National Standard of the People's Republic of China
- ICS
- 29.240.10
- Classification
- F 20
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- PrefaceIII
- IntroductionIV
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions1
- 4 General Requirements2
- 5 Functional Architecture2
- 6 Functional and performance requirements2
- 6.1 Station control layer error prevention2
- 6.2 Interval layer error prevention5
- 6.3 Process level error prevention5
- 6.4 Master Station Error Prevention5
- 7 Application Requirements6
- 7.1 Basic Requirements6
- 7.2 Remote Control Operation Prevention6
- 7.3 Preventing errors in sequential control operations8
- 7.4 Preventing errors during local operation References8
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
This document is Part 8 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts.
— Part 1: General requirements;
— Part 2: Data and models;
— Part 3: Communication message specifications;
— Part 4: Network security protection;
— Part 5: Protection, control and related equipment;
— Part 6: Station monitoring system;
— Part 7: Centralized monitoring system;
— Part 8: Electrical operation error prevention;
— Part 9: Construction specifications;
— Part 10.Testing and inspection.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Technical Committee for Standardization of Power Grid Operation and Control (SAC/TC446).
This document was drafted by: State Grid Shandong Electric Power Company, Nanjing Nanrui Relay Protection Electric Co., Ltd., State Grid Corporation of China, State Grid Tianjin Electric Power Company, Municipal Power Company, State Grid Anhui Electric Power Co., Ltd., State Grid Fujian Electric Power Co., Ltd., Changyuan Shenzhen Ruijibao Automation Co., Ltd., Zhuhai UTE Electric Power Technology Co., Ltd., Changyuan Gongchuang Electric Power Safety Technology Co., Ltd., Beijing Sifang Relay Protection Engineering Technology Co., Ltd., China Electric Power Research Institute Co., Ltd., Xuji Electric Co., Ltd., NARI Nanjing Control System Co., Ltd., NARI Technology Co., Ltd., China Energy Engineering Group Liaoning Electric Power Survey and Design Institute Co., Ltd., China Southern Power Grid Power Dispatching and Control Center, China Southern Power Grid Energy Development Research Institute Co., Ltd. and Inner Mongolia Electric Power (Group) Co., Ltd.
The main drafters of this document are: Liu Yuanlong, Teng Jingyu, Dong Yu, Sun Yang, Zhao Yongqiang, Li Yan, Xie Xiaodong, Wang Quan, You Daning, Fan Rongqi, Ge Ning, Wang Shuying, Zhang Yongwu, Li Yongxi, Ge Liqing, Lin Pi, Wang Anning, Wang Zhijie, Han Maolin, Tian Weiyun, Wang He, Wang Shenqiang, Zhang Wei, Zhao Na, Zhang Haiting, Han Xiao, Peng Bin, Li Jinsong, Jiang Baichao, Lu Tong, Li Ang, Chang Qing, Wei Lue, Bai Wen, Guo Lijun, He Mei, Li Jin, Liu Kemeng, Leng Xiangbiao, An Shengdong, Jiang Tao, and Qiao Hongwei.
Introduction
In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized.
Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system List standards.
GB/T 45906 "Substation Secondary System" comprehensively covers general requirements, equipment system functional requirements, project implementation and testing, etc.
The substation secondary system is planned to consist of 10 parts.
— Part 1: General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction, Network security and other technical requirements.
— Part 2: Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection Processing requirements, modeling methods, and model configuration processes.
— Part 3: Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication The implementation method of the service.
— Part 4: Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems.
— Part 5: Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment.
— Part 6: Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc.
— Part 7: Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and Mutual technical requirements.
— Part 8: Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and Energy, performance and application requirements.
— Part 9: Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering.
System and technical requirements.
— Part 10.Testing and inspection. The purpose is to standardize the general principles and requirements for the inspection of substation secondary system equipment and systems. Please wait. Substation secondary system Part 8: Prevention of electrical errors
1 Scope
This document specifies the overall requirements, functional architecture, functions and performance, and application requirements for electrical operation error prevention of substation secondary systems.
This document is applicable to the design, development, testing, construction, operation, maintenance and Maintenance.
2 Normative references
GB 26860
GB/T 36572
GB/T 40095
GB/T 45906.4
3 Terms and Definitions
The terms and definitions defined in DL/T 687 and DL/T 1404 and the following apply to this document.
3.1
Operations that do not comply with the anti-error operation procedures will be locked out.
3.2 preventingmal-operationrulescheck
Determine whether the error prevention rules are met, and if not, lock the operation.
3.3 tagoutinterlocking
On the monitoring system wiring diagram, a signboard with the function of prohibiting the operation of this system is set on the electrical equipment to achieve operation locking.
3.4
Based on the network topology, the operation of circuit breakers, disconnectors and grounding switches can be locked to prevent errors at the master station.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 26860Safety code of electric power industry - Electric part of power plants and transformer substations
- GB/T 36572Guidelines of cyber security protection for electric power system supervision and control
- GB/T 40095Technical specifications for measurement and control device in smart substation
- GB/T 45906.4Substation secondary system — Part 4: Cyber security protection
Editions of GB/T 45906.8
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 45906.8-2025 | Substation secondary system - Part 8: Preventing electric mal-operation | current edition | Current |
This page sells the current edition, GB/T 45906.8-2025. Earlier editions are listed for reference only.
How to Buy GB/T 45906.8-2025
- 1Add to cart. Click the "Buy GB/T 45906.8-2025" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 26860-2011 — Safety code of electric power industry - Electric part of power plants and transformer substations
GB/T 36572-2018 — Guidelines of cyber security protection for electric power system supervision and control
GB/T 40095-2021 — Technical specifications for measurement and control device in smart substation
Secure payment via Stripe
Payments accepted
GB/T 45906.8-2025
$200.00