Scope
GB/T 2694-2018 is the English-translated version of 输电线路铁塔制造技术条件.
GB/T 2694-2018 covers the manufacture of steel towers for power transmission lines, in particular angle steel towers, and can also be used as a reference for power microwave towers, power communication towers and similar steel structures.
It sets the requirements for materials, including steel, welding materials, fasteners and zinc ingots, and for each stage of production: cutting, marking, forming, hole making, root cleaning and beveling, welding, assembly of welded parts, correction, hot dip galvanizing and trial assembly.
It also covers inspection items, sampling plans and judgment rules, packaging, marking, transport and storage, and the documents handed over with the towers, with annexes on test methods for the zinc coating.
It replaces GB/T 2694-2010, was issued on 13 July 2018 and has applied since 1 February 2019.
Found what you need?
Document preview — GB/T 2694-2018
National Standard of the People's Republic of China
- ICS
- 29.240.99
- Classification
- K 47
- Replacing
- GB/T 2694-2010
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword4
- 1 Scope5
- 2 Normative references5
- 3 Terms and definitions, symbols7
- 3.1 Terms and definitions7
- 3.2 Symbols9
- 4 General9
- 5 Materials10
- 5.1 Steel10
- 5.2 Welding materials11
- 5.3 Fasteners11
- 5.4 Zinc ingots11
- 6 Technical requirements12
- 6.1 Cutting12
- 6.2 Marking12
- 6.3 Forming (bending, flattening, opening and closing angles)13
- 6.4 Hole making14
- 6.5 Root cleaning, back shoveling, beveling15
- 6.6 Welding16
- 6.7 Assembly of welded parts23
- 6.8 Correction24
- 6.9 Hot dip galvanizing24
- 6.10 Trial assembly25
- 7 Inspection27
- 7.1 Certificate of conformity27
- 7.2 Inspection items27
- 7.3 Inspection requirements and methods27
- 7.4 Sampling plan and judgment principle29
- 8 Packaging, marking, transportation, storage33
- 8.1 Packaging33
- 8.2 Marking33
- 8.3 Transportation and storage33
- 9 Data handover requirements34
- Appendix A (Normative) Hot-dip galvanizing layer uniformity test - Copper sulfate test method35
- Appendix B (Normative) Hot-dip galvanized layer adhesion test - Drop hammer test method37
- Appendix C (Normative) Test method for hot-dip galvanized layer thickness - Metal coating thickness gauge test method38
- Appendix D (Normative) Hot-dip galvanized layer adhesion test -- Dissolution weighing test method39
1 Scope
This standard specifies the materials, technical requirements, inspection, packaging, marking, transportation, storage in the manufacturing process of transmission line towers (hereinafter referred to as "towers").
This standard applies to the manufacturing of angle steel towers for transmission lines.
It can be used as a reference for the manufacturing of power microwave towers, power communication towers and similar steel structures.
2 Normative references
The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) is applicable to this standard.
GB/T 41 Hexagon nuts, style 1 - Product grade C
GB/T 95 Plain washers - Product grade C
GB/T 229 Metallic materials - Charpy pendulum impact test method
GB/T 470 Zinc ingots
GB/T 699 Quality carbon structure steels
GB/T 700 Carbon structural steels
GB/T 702 Hot-rolled steel bars - Dimensions, shape, weight and tolerances
GB/T 706 Hot rolled section steel
GB/T 709 Dimension shape weight and tolerances for hot-rolled steel plates and sheets
3 Terms and definitions, symbols
3.1 Terms and definitions
The following terms and definitions apply to this document.
3.2 Symbols
The following symbols apply to this document.
4 General
4.1 The manufacture and inspection of the tower shall meet the design requirements. When the design needs to be modified, the consent of the design organization shall be obtained and the design change document shall be signed.
4.2 Matters not specified in this standard shall comply with the provisions of the relevant current national standards.
4.4 The production process of the tower shall comply with the provisions of the environment, safety, occupational health.
5 Materials
5.3 Fasteners.
5.1 Steel
5.1.1 The specifications and grades of steel used in the manufacture of the tower shall be selected according to the design requirements;
5.1.2 Steel materials shall have traceability marks. If the original traceability marks are split during the manufacturing process, the marks shall be transplanted before the materials are split.
5.2 Welding materials
5.2.1 The quality of welding materials such as welding rods, welding wires, fluxes shall comply with the provisions of GB/T 5117, GB/T 5118, GB/T 5293, GB/T 8110, GB/T 10045, GB/T 12470, GB/T 17493.
5.2.2 The coating on the surface of the welding rod shall not fall off or be damp. The surface of the welding wire shall be smooth and flat; there shall be no burrs, scratches, rust, oxide scale or other impurities that have adverse effects on welding performance and welding equipment operation performance.
5.2.3 The welding gas shall meet the requirements of GB/T 6052 and HG/T 3728.
5.2.4 Before the first use of each welding material, the mechanical properties test of the deposited metal shall be carried out.
5.2.5 The management of welding materials shall comply with the provisions of JB/T 3223.
5.4 Zinc ingots
The quality requirements, test methods, inspection rules and markings, packaging, transportation and storage of zinc ingots shall comply with the provisions of GB/T 470.
6 Technical requirements
6.1 Cutting
6.1.1 After cutting, there shall be no cracks or edge defects greater than 1.0 mm on the fracture. The flatness of the cut surface shall not be greater than 0.05t (t is the thickness) and shall not be greater than 2.0 mm. The depth of the cut mark shall not be greater than 0.3 mm. The allowable deviation of the local notch depth is 1.0 mm.
6.2 Marking
6.2.2 The steel stamps of the identification shall be arranged neatly; the font shall not have defects; the font height is 8 mm ~ 18 mm.
6.2.3 The steel stamp shall not be pressed on the hole making, bending, milling, welding parts.
6.3 Forming (bending, flattening, opening and closing angles)
6.4 Hole making
6.4.1 The punching surface shall not have obvious concave defects; burrs larger than 0.3 mm shall be removed. After hole making, there shall be no missing edges or collapsed angles larger than 0.5 mm at the boundary intersection between the hole wall and the part surface. The allowable deviation of hole making shall comply with the provisions of Table 4.
6.6 Welding
6.6.1 Welding procedure qualification
For the steel, welding materials, welding methods, structural forms, preheating, post-treatment, etc., which are used for the first time, welding procedure qualification shall be carried out in accordance with GB 50661 before welding work; welding process specifications and welding operation instructions shall be prepared.
6.6.2 Welder qualification
6.6.4 Welding groove
6.6.4.1 The form and size of the welding groove shall comply with the relevant provisions of GB/T 985.1 and GB/T 985.2. The form and size of the groove with special requirements for the drawings shall be determined, based on the drawings and combined with the welding procedure qualification.
6.6.4.2 The welding groove shall be processed by mechanical methods first. When flame cutting is used, the weld groove shall be flat, free of burrs, cracks, gas cutting nodules, interlayers or other defects.
6.6.5 Welding rework
7 Inspection
7.1 Certificate of conformity
Products shall be inspected and accepted before leaving the factory and a product certificate of conformity shall be issued.
7.3 Inspection requirements and methods
7.4 Sampling plan and judgment principle
7.4.1 Sampling principle
7.4.2 Inspection batch
The inspection batch can be composed of several production batches or part of the production batch. The exit-factory inspection batch is determined according to the actual situation. The inspection batch accepted by the buyer shall be based on the contractual agreement between the supplier and the buyer.
7.4.6 Judgment principle
7.4.6.1 Judgment principle for parts
When the inspected parts have one of the following conditions, they shall be judged as unqualified. […]
7.4.6.2 Comprehensive judgment principle
If one of the items in Class A is unqualified, the product shall be judged as unqualified; if one of the items in Class B is not less than the rejection number (Re), the product shall be judged as unqualified.
8 Packaging, marking, transportation, storage
8.1 Packaging
8.1.1 Angle steel packaging
8.1.1.1 The packaging length, number of bundles and weight of angle steel shall be convenient for packaging, transportation, marking.
8.1.2 Connection plate packaging
The connection plate packaging should be fastened by long bolts and a lifting point shall be set.
8.2 Marking
In addition to meeting the contract requirements, the marking shall also be identified in a conspicuous position on the bundle, indicating the project name, tower type, nominal height, tower number, bundle number, manufacturer name; the marking content shall also meet the requirements of the transportation department.
8.3 Transportation and storage
During loading, unloading, transportation and storage, the packaging must not be damaged to cause deformation of the product or damage to the galvanized layer.
9 Data handover requirements
The following information (but not limited to) shall be provided when the tower leaves the factory. […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 39 pages — is available in the English PDF.
Referenced standards
Normative references
Cited by
- GB/T 25020.1-2025Pole for overhead contact system of electrified railways - Part 1: Steel pole
- GB/T 33630-2025Wind energy generation systems - Specification for corrosion protection of offshore wind turbines
- GB/T 21698-2022Composite grounding conductor
- DL/T 646-2012Manufacturing technical requirements for steel tubular structures of substation and transmission line
- JB/T 9800-2011Assembly metal silo
Similar standards
Editions of GB/T 2694
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 2694-2018 | Specification of manufacturing for transmission line tower | current edition | Current |
| GB/T 2694-2010 | Specification of manufacturing for transmission line tower | previous edition | Superseded |
This page sells the current edition, GB/T 2694-2018. Earlier editions are listed for reference only.
How to Download GB/T 2694-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 229-2020 — Metallic Materials — Charpy Pendulum Impact Test Method
GB/T 2290-2012 — Coal tar pitch
GB/T 22900-2022 — General rules of science and technology research project evaluation
Secure payment via Stripe
Payments accepted
GB/T 2694-2018
$475.00