Scope

GB/T 31487.1-2025 is the English-translated version of 直流融冰装置 第1部分:系统设计.

GB/T 31487.1-2025 is the Chinese national standard covering designing a deicing installation - the current needed to melt ice off a given conductor at a given temperature and wind, the connection to the line and the switching, the interaction with the network and the protection while a transmission line is deliberately short-circuited through a converter. At 50,500 words it is the largest of the three parts. It replaces GB/T 31487.1-2015, revised with Parts 2 and 3. It was issued on 31 December 2025 and has been in force since 1 July 2026, replacing GB/T 31487.1-2015. The document is under the responsibility of the China Electrical Equipment Industry Association. This page is published from the official record of the 2025 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.

Document preview — GB/T 31487.1-2025

National Standard of the People's Republic of China

ICS
29.240.99
Classification
K 46
Replacing
GB/T 31487.1-2015

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1.Scope1
  • 2 Normative References1
  • 3.Terms and Definitions2
  • 4 Design conditions7
  • 4.1 Ice Melting Line7
  • 4.2 DC ice melting device configuration station7
  • 5 Complete design8
  • 5.1 General Rules8
  • 5.2 Methods for melting ice on conductors and ground wires8
  • 5.3 Main Circuit Parameter Design8
  • 5.4 System Access Method9
  • 5.5 Types and Main Electrical Wiring of DC De-icing Devices9
  • 5.6 Induced voltage and induced current in the ice-melting circuit10
  • 5.7 Ground wire insulation design for applications requiring de-icing11
  • 5.8 Overvoltage protection and insulation coordination of DC de-icing device12
  • 5.9 Connection between DC de-icing device and circuit13
  • 6.Functional and Performance Requirements14
  • 6.1 Normal operating conditions of DC de-icing device14
  • 6.2 Grid-commutated DC de-icing device15
  • 6.3 Modular Multilevel DC De-icing Device19
  • 7.Inspection Rule21
  • 7.1 General Provisions21
  • 7.2 Type testing and routine testing22
  • 7.3 Field Test25
  • 8.Operation and Maintenance29
  • 8.1 General Rules29
  • 8.2 Operating Mode29
  • 95 Appendix G (Informative) Typical Protection Configuration for DC De-icing Devices 99 G.1 Typical Protection Configuration of DC De-icing Device with Power Grid Phase Commutation 99 G.2 Modular Multilevel DC Ice Melting Device Typical Protection Configuration 100 Appendix H (Informative) DC De-icing Procedure for Conductors and Ground Wires 103 H.1 Line De-energization Conductor DC De-icing Process 103 H.2 Line power outage ground wire DC de-icing process 104 H.3 Line Uninterrupted Grounding DC De-icing Process 105 References106

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part

1.Structure and Drafting Rules of Standardization Documents". Drafting. This document is Part 1 of GB/T 31487 "DC De-icing Devices". GB/T 31487 has the following parts published.

1.System Design;

1 Scope

GB/T 31487.1-2025 is the Chinese national standard covering designing a deicing installation - the current needed to melt ice off a given conductor at a given temperature and wind, the connection to the line and the switching, the interaction with the network and the protection while a transmission line is deliberately short-circuited through a converter. At 50,500 words it is the largest of the three parts. It replaces GB/T 31487.1-2015, revised with Parts 2 and 3. It was issued on 31 December 2025 and has been in force since 1 July 2026, replacing GB/T 31487.1-2015. The document is under the responsibility of the China Electrical Equipment Industry Association. This page is published from the official record of the 2025 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.

This document defines the terminology for DC ice-melting device system design and specifies the design conditions, complete system design, functions, and... Performance requirements, inspection rules, operation and maintenance requirements. This document applies to the de-icing of conductors and ground wires of 110kV and above AC transmission lines, and the de-icing of ground wires of DC transmission lines, for grid phase-change DC transmission. The de-icing device and modular multilevel DC de-icing device are used as references for other voltage level transmission lines and other types of DC de-icing devices.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included. For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies. This document.

GB/T 311.1 Insulation Coordination Part

3 Experiment. This document replaces GB/T 31487.1-2015 "DC De-icing Devices Part

1.System Design and Application Guidelines", and is consistent with GB/T 31487.1- Compared to.2015, aside from structural adjustments and editorial changes, the main technical changes are as follows:

---The scope has been changed (see Chapter 1, Chapter 1 of the.2015 edition);

---Added terms "line de-icing during power outages", "line de-icing without power outages", "valve", "converter", "grid phase-commutation converter", and "modularization". "Multi-level converter", "ice-melting bus", "ground wire ice-melting lead wire", "grid phase-commutated DC ice-melting device", "modular multi-level DC ice-melting device" "Ice-melting device", "Design ice-melting voltage", "Isolating switch on the ice-melting busbar device side", "Isolating switch on the ice-melting busbar line side", "Conductors and ground" "Line connection disconnect switch", "Ground wire and lead wire connection disconnect switch", "Conductor short-circuit disconnect switch", "Ground wire short-circuit disconnect switch", "Replacement" "DC-side grounding switch of converter", "AC-side grounding switch of converter", "DC pole bus grounding switch", "Ice melting bus grounding switch" "Grounding switch", "Maintenance status", "Cold standby status", "Hot standby status", "AC side hot standby status", "Operating status", "When" "Pre-state", "Target state", "De-icing sequence control", "Equivalent test", "Maintenance test", "Field test", "Equipment test", "Subsystem test" "System test" (see 3.1.1, 3.1.2, 3.2.1~3.2.4, 3.2.6, 3.2.7, 3.2.9, 3.2.10, 3.3.4, 3.4.1~3.4.11) 3.5.1~3.5.5, 3.6.1~3.6.3, 3.7.3~3.7.8);

---Terms changed to "DC de-icing device", "minimum de-icing current", "design de-icing current", "induced voltage", "induced current", and "maximum allowable". "Xu Rongbing current", "rated input voltage", "rated output current", "rated output voltage", "rated output power", "minimum operating voltage" The definition of "flow" (see 3.2.8, 3.3.1~3.3.3, 3.3.5~3.3.11, and 3.2, 3.7~3.10, 3.14,

3.18 in the.2015 edition) 3.19);

---The term "subsystem" has been removed (see

3.4 in the.2015 edition);

---The design conditions have been changed (see Chapter 4, 4.1-

4.3 of the.2015 edition);

---Changes have been made to the "General Rules for Complete Set Design", "Main Circuit Parameter Design", "System Connection Method", and "DC Ice Melting Device Type and Electrical Main Connection". The regulations regarding "Line", "Overvoltage Protection and Insulation Coordination of DC De-icing Device", and "Connection of DC De-icing Device to Line" (see 5.1, 5.3~) 5.5, 5.8, and 5.9 (5.1-

5.6 in the.2015 edition);

---Added "Methods for melting ice in conductors and ground wires", "Induced voltage and induced current in ice melting circuits", and "Insulation of ground wires requiring ice melting". The design specifications are detailed in sections 5.2, 5.6, and 5.7.

---The provisions regarding "installation," "fire prevention," and "ventilation" have been removed (see sections

5.8 of the.2015 edition);

6 Reactors

GB/T 1094.10-2022 Power Transformers - Part

10 Sound Level Measurement

GB/T 1984 High Voltage AC Circuit Breakers

GB/T 1985-2023 High-voltage AC disconnect switches and grounding switches

GB 3096 Environmental Quality Standard for Noise

GB/T 7261 Basic Test Methods for Relay Protection and Safety Automatic Devices Common technical requirements for

GB/T 11022 High-voltage AC switchgear and controlgear standards

GB/T 11024.1 Parallel capacitors for AC power systems with nominal voltage above 1000V - Part

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 110 pages — is available in the English PDF.

Referenced standards

Normative references

GB/T 311.1 · GB/T 311.2 · GB/T 311.3

Editions of GB/T 31487.1

EditionTitleRevisionStatus
GB/T 31487.1-2025Direct current deicers - Part 1: System designcurrent editionCurrent
GB/T 31487.1-2015Direct current deicers - Part 1: System designprevious editionSuperseded

This page sells the current edition, GB/T 31487.1-2025. Earlier editions are listed for reference only.

How to Buy GB/T 31487.1-2025

  1. 1Add to cart. Click the "Buy GB/T 31487.1-2025" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
110 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 31487.1-2025

$1,505.00

$1,280.00for partners