Valid

GB/T 311.12-2025Insulation co-ordination - Part 12: Application guidelines for LCC HVDC converter stations (English PDF)

绝缘配合 第12部分:高压直流换流站(LCC)绝缘配合应用导则

Preview PDF

This is a limited preview

Buy now to download the full PDF (76 pages)

Need quotation for your management?

Get a formal quotation for GB/T 311.12-2025 in 30 minutes.

Issued by

State Administration for Market Regulation

Level / Type

National · Recommended

Issue date

October 5, 2025

Implementation date

May 1, 2026

Scope

GB/T 311.12-2025 is the English-translated version of 绝缘配合 第12部分:高压直流换流站(LCC)绝缘配合应用导则.

GB/T 311.12-2025 — This document provides insulation coordination guidelines for high-voltage direct current converter stations employing grid-commutated converters (LCCs).

The purpose is to evaluate the converter... The station equipment is subjected to overvoltage stress under DC voltage, power frequency voltage, harmonic voltage, and impulse voltage, and the rated withstand voltage of the equipment is determined. level.

This document applies only to the insulation distribution of LCC high-voltage DC converter stations that use gapless metal oxide surge arresters for overvoltage protection.

This document also introduces the method for determining the protection level of surge arresters in series or parallel combinations, and provides typical surge arrester configurations.

The stress on the case and the surge arrester. The appendix provides an example of insulation coordination for an LCC high-voltage DC converter station that supports the content and basic analysis techniques described in the main text of this document.

Found what you need?

Document preview — GB/T 311.12-2025

National Standard of the People's Republic of China

ICS
29.080
Classification
C 60

Issued by: State Administration for Market Regulation

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative References
  • 3 Terms, Definitions, Symbols, and Abbreviations
  • 3.1 Terms and Definitions
  • 3.2 Symbols and Abbreviations
  • 4 Typical layout diagram of a high-voltage direct current converter station 3.
  • 5 Operating voltage and overvoltage
  • 5.1 Continuous operating voltage at different locations of the converter station
  • 5.2 Maximum Peak Continuous Operating Voltage (PCOV) and Peak Continuous Operating Voltage (CCOV)
  • 5.3 Sources and types of overvoltage
  • 5.4 Temporary and Resonant Overvoltages
  • 5.5 Soft wave front overvoltage
  • 5.6 Overvoltages of fast wavefront, ultra-fast wavefront, and steep wavefront
  • 6 Surge Arrester Characteristics and Stress
  • 6.1 Surge Arrester Characteristics
  • 6.2 Surge Arrester Standard
  • 6.3 Surge arrester stress
  • 6.4 Protection Strategy
  • 6.5 Summary of Fault Events and Surge Arrester Stress
  • 7 Insulation Coordination Calculation Program
  • 7.1 Overview
  • 7.2 Surge arrester requirements
  • 7.3 Representative Overvoltage (Urp)
  • 7.4 Determination of the withstand voltage (Ucw)
  • 7.5 Determination of required withstand voltage (Urw)
  • 7.6 Determination of the specified withstand voltage (Uw)
  • 8 Research Tools and System Models
  • 8.1 Overview
  • 8.2 Research Methods and Tools
  • 8.3 System Model
  • Appendix A (Informative) Comparison of this document's structural designations with those of IEC 60071-12:2022
  • Appendix B (Informative) Technical Differences Between This Document and IEC 60071-12:2022 and Their Reasons
  • Appendix C (Informative) Example of Insulation Coordination for LCC High Voltage Direct Current Converter Station
  • C.1 Overview
  • C.2 Example of an LCCCVDC converter station with a single-pole single-12-pulse converter
  • C.3 Example of an LCCCVDC converter station with a single-pole dual 12-pulse converter
  • Appendix D (Informative) Example of Insulation Coordination for Back-to-Back DC Converter Stations
  • D.1 Overview
  • D.2 DC System Parameters
  • D.3 Arrangement and parameters of surge arresters
  • D.4 Overvoltage and its protection
  • D.5 Protection level and insulation level
  • D.6 Air gap
  • D.7 Determine the minimum voltage for creepage distance
  • D.8 Shielding of switch field
  • References

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents".

Drafting.

This document is Part 12 of GB/T 311 "Insulation Coordination". GB/T 311 has already published the following parts.

---Part 1: Definitions, Principles, and Rules;

---Part 2: Usage Guidelines;

---Part 3: Insulation Coordination Procedures for High Voltage Direct Current Converter Stations;

---Part 4: Calculation Guidelines for Power Grid Insulation Coordination and Simulation;

---Part 11: Definitions, principles, and rules for insulation coordination in high-voltage direct current systems;

---Part 12: Insulation Coordination Application Guidelines for High Voltage Direct Current Converter Stations (LCCs);

---Part 14: Insulation Coordination of AC/DC Filters in High Voltage DC Systems this document is modified to adopt IEC 60071-12:2022 "Insulation coordination - Part 12: Application of insulation coordination in high voltage DC converter stations (LCC)".

Guidelines.

This document has undergone significant structural adjustments compared to IEC 60071-12:2022.A comparison of the structural numbering changes between the two documents is provided below.

See Appendix A for the table of contents.

This document differs significantly from IEC 60071-12:2022.The relevant clauses are indicated in the margins using vertical markers.

Straight lines (|) are marked. A summary of these technical differences and their reasons can be found in Appendix B.

The following editorial changes have been made to this document.

---Appendix A (informative) "Comparison of Structure Numbers in this Document with IEC 60071-12:2022" has been added;

---Appendix B (Informative) has been added. "Technical Differences Between This Document and IEC 60071-12:2022 and Their Reasons";

---Added Appendix D (Informative) "Example of Insulation Coordination for Back-to-Back DC Converter Stations".

Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.

This document was proposed by the China Electrical Equipment Industry Association.

This document is under the jurisdiction of the National Technical Committee on Standardization of High Voltage Testing Technology and Insulation Coordination (SAC/TC163).

Introduction

GB/T 311 "Insulation Coordination" aims to establish the principles and guidelines for insulation coordination in high-voltage AC and high-voltage DC applications. Due to the nature of AC insulation coordination...

There is a significant difference between AC insulation coordination and DC insulation coordination. It needs to be divided into two aspects. AC insulation coordination and DC insulation coordination, which are proposed to consist of the following parts.

---Part 1: Definitions, Principles, and Rules. The purpose is to establish definitions, principles, and rules for insulation coordination and to provide guidelines for insulation coordination in AC systems.

Provide guidance in coordination.

---Part 2: Usage Guidelines. This section aims to provide guidance on the correct implementation of Part 1.

---Part 3: Insulation Coordination Procedures for High Voltage Direct Current Converter Stations. The purpose is to provide guidance on insulation coordination for high voltage direct current converter stations.

---Part 4: Calculation Guidelines for Power Grid Insulation Coordination and its Simulation. The purpose is to establish guidelines for the digital calculation of insulation coordination.

---Part 11: Definition, Principles, and Rules of Insulation Coordination in High Voltage Direct Current Systems. The purpose is to establish the principles,, and rules of insulation coordination in DC systems.

Defines, principles, and rules, and provides guidance for insulation coordination in high-voltage direct current systems.

---Part 12: Insulation Coordination Application Guidelines for High Voltage Direct Current Converter Stations (LCCs). The purpose is to provide guidance for high voltage direct current converters using LCCs.

Provides guidance on insulation coordination for DC converter stations.

---Part 13: Insulation Coordination Application Guidelines for High Voltage Direct Current Converter Stations (VSCs). The purpose is to provide guidance for high voltage direct current converters using VSCs.

Provides guidance on insulation coordination for DC converter stations.

---Part 14: Insulation Coordination of AC/DC Filters in High-Voltage DC Systems. The purpose is to determine the insulation coordination of AC and DC filters in high-voltage DC systems.

Insulation coordination of the current filter.

---Part 15: Insulation Coordination of DC Transmission Lines. The purpose is to determine the insulation coordination of DC transmission lines and grounding electrode lines.

This document is Part 12 of GB/T 311 "Insulation Coordination". With increasingly rich experience in the construction and operation of DC power projects in my country, there is an urgent need for further research on DC...

This document provides a unified standard for insulation coordination in DC power systems, offering guiding technical documentation for DC engineering construction in my country. It also outlines the requirements for systems employing grid commutation.

Insulation Coordination Application Guidelines and Application Examples for HVDC Converter Stations (LCC), based on the actual application of LCC DC transmission projects in my country.

The relevant content will be adjusted to adapt to my country's technological conditions and engineering needs.

Insulation Coordination Part 12: High Voltage Direct Current Converter Station (LCC) Insulation Coordination Application Guidelines

1 Scope

This document provides insulation coordination guidelines for high-voltage direct current converter stations employing grid-commutated converters (LCCs). The purpose is to evaluate the converter...

The station equipment is subjected to overvoltage stress under DC voltage, power frequency voltage, harmonic voltage, and impulse voltage, and the rated withstand voltage of the equipment is determined.

level.

This document applies only to the insulation distribution of LCC high-voltage DC converter stations that use gapless metal oxide surge arresters for overvoltage protection.

This document also introduces the method for determining the protection level of surge arresters in series or parallel combinations, and provides typical surge arrester configurations.

The stress on the case and the surge arrester.

The appendix provides an example of insulation coordination for an LCC high-voltage DC converter station that supports the content and basic analysis techniques described in the main text of this document.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.

For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.

This document.

GB/T 311.11 Insulation Coordination Part 11: Definitions, Principles and Rules for Insulation Coordination in High Voltage Direct Current Systems (GB/T 311.11-2025, IEC 60071-11:2022, MOD) GB/T 11032-2020 AC gapless metal oxide surge arresters (IEC 60099-4:2014, MOD) GB/T 13498 Terminology for High Voltage Direct Current Transmission (GB/T 13498-2017, IEC 60633:2015, MOD) GB/T 22389 Gapless Metal Oxide Surge Arresters for High Voltage Direct Current Converter Stations (GB/T 22389-2023, IEC 60099-9:2014) MOD) GB/T 50064 Code for Design of Overvoltage Protection and Insulation Coordination of AC Electrical Installations

3 Terms, definitions, symbols and abbreviations

3.1 Terms and Definitions

The terms and definitions defined in GB/T 311.11, GB/T 13498 and GB/T 22389, as well as the following terms and definitions, apply to this document.

3.1.1

The highest continuous operating voltage peak value occurring on the DC side equipment of the converter station, excluding commutation overshoot.

3.1.2

The maximum peak value of continuous operating voltage appearing on the DC side equipment of the converter station, including commutation overshoot.

3.1.3

The power frequency voltage (RMS) or DC voltage that produces the same power dissipation on the surge arrester as the actual continuous operating voltage of any waveform.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 76 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 311.12-2025

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
76 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 311.12-2025

$1,295.00