Scope

GB/T 25738-2024 is the English-translated version of 核电厂电动机调试技术导则.

GB/T 25738-2024 is the Chinese national technical guideline for commissioning the AC asynchronous motors installed in nuclear power plants. It specifies the commissioning conditions, the commissioning methods, the judgment criteria and the contents of the report, and it applies to the commissioning of those motors.

The prerequisites require calibrated instruments, complete design and manufacturing records, a finished installation with the electrical and instrumentation circuits terminated, a valid work permit, and quality appraisal documents for nuclear safety class motors.

The commissioning itself runs through preliminary inspection, static testing and start testing, and an annex gives the factors for converting stator winding insulation resistance to operating temperature.

It defines components and the nuclear safety class motor. It replaces GB/T 25738-2010, was issued on 26 October 2024 and has applied since 1 May 2025.

Found what you need?

Document preview — GB/T 25738-2024

National Standard of the People's Republic of China

ICS
29.240.99
Classification
F 25
Replacing
GB/T 25738-2010

Issued by: State Administration for Market Regulation; Standardization Administration of China

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Debugging
  • 4.1 Debugging Prerequisites
  • 4.2 Preliminary Inspection
  • 4.3 Static test
  • 4.4 Start the test
  • 5 Test Report
  • Appendix A (Informative) Conversion Factors for Converting Motor Stator Winding Insulation Resistance to Operating Temperature

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents". Drafting is required.

This document replaces GB/T 25738-2010 "Technical Guidelines for Commissioning of Electric Motors in Nuclear Power Plants".

In addition to structural adjustments and editorial changes, the main technical changes are as follows:

a) The scope of application has been changed (see Chapter 1, Chapter 1 of the 2010 edition);

b) The definition of nuclear safety-grade motor has been changed (see 3.2, 3.2 of the 2010 edition);

c) Added the requirements for the completion of motor installation (see 4.1.3);

d) The provisions for checking lubricating oil have been changed [see 4.2.2 e) and 4.2.2 e) of the 2010 edition];

e) Added the requirement to check the current transformer (CT) wiring [see 4.4.1 g)];

f) Added the requirement to check the neutral point connection [see 4.4.1 h)];

g) Added the requirement to inspect the inverter [see 4.4.1 k)];

h) Added requirements for no-load starting voltage drop measurement (see 4.4.3.1);

i) Added requirements for no-load starting of motors with frequency converters (see 4.4.3.7);

j) Added requirements for measuring the voltage drop when starting with load (see 4.4.4.2);

k) Change "low-voltage motor" to "motor with rated voltage below 1 000 V" and change "high-voltage motor" to "motor with rated voltage below 1 000 V". "Motors with a voltage of 1 000 V and above" (see 4.4.3.2, 4.4.4.3, 4.4.4.4, 2010 edition 4.4.3.2, 4.4.4.3, 4.4.4.4);

The normative appendix "Quality Appraisal and Special Tests for Typical Nuclear Safety-Grade Motors" (see Appendix A of the 2010 edition) has been deleted.

1 Scope

This document specifies the commissioning conditions, commissioning methods, judgment criteria, and report contents for AC asynchronous motors in nuclear power plants.

This document applies to the commissioning of AC asynchronous motors in nuclear power plants.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document.

For referenced documents without a date, only the latest version (including all amendments) applies to this document.

GB/T 755 Ratings and performance of rotating electrical machines

GB/T 1032 Test methods for three-phase asynchronous motors

GB/T 10068 Mechanical vibration of motors with a shaft center height of 56 mm or more - Measurement, evaluation and limits of vibration

GB/T 14048.12 Low-voltage switchgear and controlgear Part 4-3: Contactors and motor starters for non-motor loads AC semiconductor controllers and contactors

GB 50150 Electrical Equipment Acceptance Test Standard for Electrical Installation Engineering

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 Components

Items that make up equipment.

Note: Typical components of an electric motor include stators, rotors, bearings, couplings, electric heaters, coolers, terminal boxes, locking devices, seals, sensors, devices, etc.

3.2 Nuclear safety class motor

Suitable for motors required to protect the public during and after an accident.

4 Debugging

4.1 Debugging Prerequisites

4.1.1 The instruments and meters used for debugging shall be inspected and calibrated to be qualified and within the validity period.

4.1.2 The design and manufacturing completion documents of the motor should be complete and valid.

4.1.3 The motor installation is complete, the electrical and instrumentation circuits are terminated, and the auxiliary systems are available.

4.1.4 The debugging related documents have come into effect and the debugging work permit has been obtained.

4.1.5 The quality appraisal of nuclear safety-grade motors, special test factory documents and the application environment of nuclear safety-grade motors shall comply with the design requirements.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 25738

EditionTitleRevisionStatus
GB/T 25738-2024Technical guideline for motor commissioning in nuclear power plantsfirst revisionCurrent
GB/T 25738-2010Technical guideline for motor commissioning in nuclear power plantsfirst issueSuperseded

This page sells the current edition, GB/T 25738-2024. Earlier editions are listed for reference only.

How to Download GB/T 25738-2024

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
11 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 25738-2024

$205.00