GB/T 25388.2-2021Wind turbines generator system—Double-fed converter—Part 2: Test method (English PDF)
风力发电机组 双馈式变流器 第2部分:试验方法
This is a limited preview
Buy now to download the full PDF (18 pages)
Need quotation for your management?
Get a formal quotation for GB/T 25388.2-2021 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 9, 2021
Implementation date
October 1, 2021
Scope
GB/T 25388.2-2021 is the English-translated version of 风力发电机组 双馈式变流器 第2部分:试验方法.
GB/T 25388.2-2021 is the second part of the Chinese standard on the doubly-fed converter of a wind turbine generator system, and it gives the test methods. It sets the test conditions and the methods by which the performance, the protections and the grid behaviour of the converter are verified.
It applies to the AC-DC-AC voltage source converters of doubly-fed variable speed constant frequency wind turbines, the requirements being given in Part 1. Converter makers, turbine manufacturers and test bodies use it.
It replaces GB/T 25388.2-2010, was issued on 9 March 2021 and has applied since 1 October 2021.
Found what you need?
Document preview — GB/T 25388.2-2021
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F 11
- Replacing
- GB/T 25388.2-2010
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Test conditions
- 3.1 Test environment conditions
- 3.2 Equipment
- 4 Test method
- 4.1 Test platform
- 4.2 Test items and content
- 4.2.1 Electrical safety test
- 4.2.2 Grid-connected control test
- 4.2.3 Loading test
- 4.2.4 Power grid adaptability test
- 4.2.5 Fault voltage ride-through capability test
- 4.2.6 Efficiency test
- 4.2.7 Total power factor test
- 4.2.8 Total harmonic distortion rate measurement test
- 4.2.9 Each harmonic current measurement test
- 4.2.10 DC current content measurement test
- 4.2.11 DC voltage ripple coefficient measurement test
- 4.2.12 Current unbalance test
- 4.2.13 Overload test
- 4.2.14 Measurement of the differential mode voltage Umax on the machine side
- 4.2.15 Measurement test of common mode voltage on the machine side
- 4.2.16 Measurement of dU/dt value of voltage change rate at the motor side
- 4.2.17 Stability operation test
- 4.2.18 Torque control accuracy test
- 4.2.19 Reactive power accuracy test
- 4.2.20 Temperature rise test
- 4.2.21 Protection function test
- 4.2.22 Immunity test
- 4.2.23 Electromagnetic emission test
- 4.2.24 Communication test
- 4.2.25 Low temperature working test
- 4.2.26 High temperature work test
- 4.2.27 Constant humidity test
- 4.2.28 Alternating damp heat test
- 4.2.29 Protection performance test
- 4.2.30 Vibration test
- 4.2.31 Noise test
- 4.2.32 Additional test
- 5 Test report
- Appendix A (informative appendix) Topology diagram of power grid adaptability test platform
- Appendix B (informative appendix) schematic diagram of fault voltage generating device
1 Scope
This part of GB/T 25388 specifies the test of AC, DC, and AC voltage converters for doubly-fed wind turbines (hereinafter referred to as "units") Conditions and test methods.
This part applies to AC-DC-AC voltage converters of doubly-fed variable-speed constant-frequency wind turbines, that is, doubly-fed converters (hereinafter referred to as "variable Streamer").
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this document. For undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 2423.1-2008 Environmental testing of electric and electronic products Part 2: Test method Test A. Low temperature
GB/T 2423.2-2008 Environmental testing of electric and electronic products Part 2: Test method Test B. High temperature
GB/T 2423.3-2016 Environmental Test Part 2: Test Method Test Cab. Constant Humidity Test
GB/T 2423.4-2008 Environmental testing of electrical and electronic products Part 2: Test method Test Db Alternating damp heat (12h 12h cycle)
GB/T 2423.56-2018 Environmental Test Part 2: Test Method Test Fh. Broadband Random Vibration and Guidelines
GB/T 3859.1-2013 General requirements for semiconductor converters and power grid commutated converters Part 1-1.Basic requirements specification
GB/T 4208 Shell protection grade (IP code)
GB/T 12668.3-2012 Adjustable speed electric drive system Part 3: Electromagnetic compatibility requirements and specific test methods
GB/T 17626.3 Electromagnetic compatibility test and measurement technology Radio frequency electromagnetic field radiation immunity test
GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient pulse group immunity test
GB/T 17626.5 Electromagnetic compatibility test and measurement technology surge (impact) immunity test
GB/T 17626.6 Electromagnetic compatibility test and measurement technology Radio frequency field induced conducted disturbance immunity
GB/T 25388.1 Double-fed converter for wind turbines Part 1: Technical conditions
GB/T 36994 Test Procedure for Adaptability of Wind Turbine Power Grid
GB/T 36995 Test Procedure for Fault Voltage Ride Through Ability of Wind Turbine Generator
3 Test conditions
3.1 Test environment conditions
The test environment conditions of the converter should meet the following requirements.
a) Temperature. 15°C~35°C;
b) Relative humidity. 45%~75%;
c) Atmospheric pressure. 86kPa~106kPa; d) Altitude. <=2000m.
Value, the converter should be able to stop immediately. After the shutdown is completed, the converter should be able to report the correct fault information without any abnormality. The fault is eliminated and After reset, the normal grid-connected state can be restored.
Or refer to the simulation test platform in 4.1, start the converter to complete the grid connection, and simulate the method of feedback signal inversion of the protection device, The converter should be able to stop immediately. After the shutdown is completed, the converter should be able to report the correct fault information without any abnormality. The fault is cleared and reset After that, the normal grid-connected state can be restored.
4 Test method
4.2 Test items and content
4.2.21 Protection function test
4.2.21.1.3 Phase loss protection
According to the simulation test platform in 4.1, disconnect a phase cable of the AC terminal on the grid side and the machine side under the shutdown state. Main power of the upper system, variable current The device should be able to report the correct fault information, and it is forbidden to start the machine without any abnormality. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.1.4 Phase sequence error protection
According to the simulation test platform in 4.1, switch the two-phase cable on the grid side or the machine side under the state of shutdown and power failure. The main power of the system, the converter should The correct fault information can be reported, and the machine is forbidden to start without any abnormality. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.1.5 Instantaneous overcurrent protection test
According to the simulation test platform in 4.1, in the shutdown state, the hardware protection threshold is modified to reduce the instantaneous overcurrent hardware Protection threshold threshold. Start the converter to complete the grid connection, and adjust the AC terminal current of the grid-side converter and the machine-side converter respectively to trigger the working current The instantaneous overcurrent protection threshold, the converter should be able to stop immediately. After the shutdown is completed, the converter should be able to report the correct fault information without any abnormal. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.1.6 DC overvoltage protection
According to the simulation test platform in 4.1, when the power is off, the hardware protection threshold is modified to reduce the DC overvoltage hardware protection.
Protection threshold threshold. Start the converter to complete the grid connection, make the DC bus voltage higher than the threshold threshold, trigger the DC overvoltage fault, the converter should be able to Shut down immediately. After the shutdown is completed, the converter should be able to report the correct fault information without any abnormality. After the fault is eliminated and reset, it can be restored Normal grid-connected state.
4.2.21.1.7 DC undervoltage protection
According to the simulation test platform in 4.1, when the power is off, the hardware protection threshold is modified to increase the DC undervoltage hardware protection.
Protection threshold threshold. Start the converter to complete the grid connection, so that the DC bus voltage is lower than the threshold threshold, and the DC undervoltage fault is triggered. The converter should be able to Shut down immediately. After the shutdown is completed, the converter should be able to report the correct fault information without any abnormality. After the fault is eliminated and reset, it can be restored Normal grid-connected state.
4.2.21.2 Type 2 fault protection
4.2.21.2.1 Voltage unbalance protection
According to the simulation test platform in 4.1, turn on the main power of the system and start the grid-connected operation of the converter. Adjust the output voltage of the power grid simulator to make the If the unbalance degree of the pressure-negative sequence exceeds the software protection threshold, the converter should be able to reduce the load and shut down according to the set slow shutdown strategy. After the shutdown is completed, the flow is changed The device should be able to report the correct fault information without any abnormalities. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.2.2 Power grid over-frequency protection
According to the simulation test platform in 4.1, turn on the main power of the system and start the grid-connected operation of the converter. Adjust the output grid frequency of the grid simulator to make If the grid frequency exceeds the software protection threshold, the converter should be able to reduce load and stop according to the set slow shutdown strategy. After the shutdown is complete, the converter should The correct fault information can be reported without any exceptions. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.2.3 Grid under-frequency protection
According to the simulation test platform in 4.1, turn on the main power of the system and start the grid-connected operation of the converter. Adjust the output grid frequency of the grid simulator to make If the grid frequency is lower than the software protection threshold, the converter should be able to reduce load and stop according to the set slow shutdown strategy. After the shutdown is complete, the converter should The correct fault information can be reported without any exceptions. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.2.4 Overcurrent protection
According to the simulation test platform in 4.1, under the state of shutdown and power failure, reduce the overcurrent software protection by modifying the software protection threshold method Threshold threshold. Start the converter to complete the grid connection, and adjust the AC terminal current of the grid-side converter and the machine-side converter respectively, so that the working current triggers over-voltage Current protection threshold, the converter should be able to reduce load and stop according to the set slow shutdown strategy. After the shutdown is completed, the converter should be able to report the correct fault Information without any exceptions. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.2.5 Generator over-speed protection
According to the simulation test platform in 4.1, turn on the main power of the system and start the grid-connected operation of the converter. Adjust the generator speed to exceed the over-speed protection threshold When the time, the converter should be able to reduce the load and stop according to the set slow stop strategy. After the shutdown is completed, the converter should be able to report the correct fault information, and no Any abnormalities. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.2.6 Generator underspeed protection
According to the simulation test platform in 4.1, turn on the main power of the system and start the grid-connected operation of the converter. Adjust the generator speed to be lower than the underspeed protection threshold When the time, the converter should be able to reduce the load and stop according to the set slow stop strategy. After the shutdown is completed, the converter should be able to report the correct fault information, and no Any abnormalities. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.2.7 Communication fault protection
According to the simulation test platform in 4.1, the main power of the system is connected, and the grid-connected operation of the converter is started through the simulation main control. Disconnect the converter from the analog main The converter should be able to reduce load and stop according to the set slow stop strategy. After the shutdown is completed, the converter should be able to report the correct fault message Information, and there is no abnormality. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.2.8 Cooling system failure protection
According to the simulation test platform in 4.1, turn on the main power of the system and start the grid-connected operation of the converter. Stop the operation of the cooling system of the converter, change the flow The generator should be able to reduce load and stop according to the set slow stop strategy. After the shutdown is completed, the converter should be able to report the correct fault information without any difference. often. After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.2.9 Over temperature protection
According to the simulation test platform in 4.1, under the state of shutdown and power failure, lower the over-temperature protection threshold by modifying the software protection threshold. limit. Start the converter to complete the grid connection, so that the ambient temperature, coolant temperature, device temperature, etc. exceed the corresponding temperature protection threshold, and the converter should be able to According to the set slow stop strategy, the load will be reduced and the stop will be stopped. After the shutdown is completed, the converter should be able to report the correct fault information without any abnormality. Therefore After the fault is eliminated and reset, the normal grid-connected state can be restored.
4.2.21.2.10 Surge over-voltage protection
According to the simulation test platform in 4.1, remove the converter surge protection device or absorption device, the converter should be able to correctly identify and prompt Alarm.
4.2.22 Immunity test
4.2.22.1 Electrostatic discharge immunity test
The converter can be operated under light load, and the test shall be carried out in accordance with the provisions of GB/T 17626.6 and under the following conditions.
a) Test voltage. contact discharge 6kV, air discharge 8kV;
b) Test port. the whole shell;
c) The number of discharges at each sensitive point test point. 10 times for each of the positive and negative polarity, and the interval between each discharge is at least 1s;
d) Performance criterion. It is judged in accordance with the relevant regulations of GB/T 25388.1.
4.2.22.2 Radio frequency electromagnetic field radiation immunity test
The converter can be operated under light load, and the test shall be carried out in accordance with the provisions of GB/T 17626.3 and under the following conditions.
a) Frequency range. 80MHz~1000MHz;
b) Test field strength. 10V/m;
c) 1kHz sine wave, 80% amplitude modulation;
d) Test port. the whole shell;
e) Antenna polarization direction. horizontal and vertical direction;
f) Performance criterion. It is judged in accordance with the relevant regulations of GB/T 25388.1.
4.2.22.3 Electric fast pulse group immunity test
The converter can be operated under light load, in accordance with the provisions of GB/T 17626.4 and tested under the following conditions.
a) Test voltage. ±2kV (power line), ±1kV (signal line);
b) Test port. input and output power port, signal line;
c) Repetition frequency. 5kHz/100kHz;
d) Duration. 1min;
e) Performance criterion. It is judged in accordance with the relevant regulations of GB/T 25388.1.
4.2.22.4 Surge voltage immunity test
The converter can be operated under light load, in accordance with the provisions of GB/T 17626.5 and tested under the following conditions.
a) Test voltage. ±2kV (common mode), ±1kV (differential mode);
b) Test port. input and output power port, signal line;
c) Polarity. positive and negative;
d) Test times. 5 times for positive and negative polarity;
e) Repetition rate. once per minute;
f) Performance criterion. It is judged in accordance with the relevant regulations of GB/T 25388.1.
4.2.22.5 Conducted disturbance immunity test
The converter can be operated under light load, and the test shall be carried out in accordance with the provisions of GB/T 17626.6 and under the following conditions.
a) Frequency range. 0.15MHz~80MHz;
b) Test field strength. 10V (modulation);
c) 1kHz sine wave, 80% amplitude modulation;
d) Test port. external port;
e) Injection method. CDN or current clamp, electromagnetic clamp;
f) Performance criterion. It is judged in accordance with the relevant regulations of GB/T 25388.1.
4.2.23 Electromagnetic emission test
4.2.23.1 Conducted emission test
The converter should be operated under normal full load or light load, in accordance with the provisions of GB/T 12668.3-2012 and under the following conditions test.
a) Test frequency band. 150kHz~30MHz;
b) Test port. input and output power port, signal line;
c) Test limit. According to the C3 limit of 6.5.2 in GB/T 12668.3-2012.
4.2.23.2 Radiation emission test
The converter should operate under normal full-load or light-load grid-connected working conditions, in accordance with the provisions of GB/T 12668.3-2012 and in the following conditions Test under pieces.
a) Test frequency band. 30MHz~1000MHz;
b) Test port. shell port;
c) Test limit. According to the C3 limit of 6.5.2 in GB/T 12668.3-2012.
4.2.24 Communication test
According to the simulation test platform in 4.1, the converter and the unit control system can carry out communication tests. The main content of the test should include opening Machine process, control process (instruction issuance), shutdown process, protection and reset process, data and status exchange, etc.
4.2.25 Low temperature working test
The test method is carried out in accordance with "Test A" in GB/T 2423.1-2008.
4.2.26 High temperature work test
The test method is carried out in accordance with "Test B" in GB/T 2423.2-2008.
4.2.27 Constant humidity test
The test method is carried out in accordance with "Test Cab" in GB/T 2423.3-2016.
4.2.28 Alternating damp heat test
The test method is carried out in accordance with "Test Db" in GB/T 2423.4-2008.
4.2.29 Protection performance test
The test method is to carry out the protective performance test in accordance with the provisions of GB/T 4208.
4.2.30 Vibration test
The test method is carried out in accordance with "Test Fh" in GB/T 2423.56-2018.
4.2.31 Noise test
The converter should operate stably under the conditions of rated grid voltage, rated grid frequency, converter rated output power, and grid-side unit power factor Perform a noise test under. The automatic switching fan inside the converter should be in operation.
Place the sound level meter at a height of 1m from the ground plane where the converter is placed, and at a distance of 1m from the front, back, left, and right of the enclosure, and then measure Quantity [Environmental noise should not be higher than 60dB(A)], take the maximum value.
4.2.32 Additional test
If there are other requirements for the converter that are not included in the above test items, they should be put forward when ordering and an agreement should be obtained.
5 Test report
During the test, the relevant data and information should be sorted out in time. After the test, the observation, measurement and calculation results should be verified, and the summary should be sorted.
In general, prepare the test report. The test report should include the following.
1) Test overview;
2) Introduction to the prototype;
3) Test conditions and analysis;
4) Test results and analysis;
5 Conclusion;
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 18 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2423.1-2008Environmental testing for electric and electronic products - Part 2: Test methods - Tests A: Cold
- GB/T 2423.2-2008Environmental testing for electric and electronic products - Part 2: Test methods - Tests B: Dry heat
- GB/T 2423.3-2016Environmental testing - Part 2: Testing method - Test Cab: Damp heat, steady state
- GB/T 2423.4-2008Environmental testing for electric and electronic products - Part 2: Test method - Test Db: Damp heat, cyclic (12 h + 12 h cycle)
- GB/T 2423.56-2018Environmental testing - Part 2: Test methods - Test Fh: Vibration, broadband random and guidance
- GB/T 3859.1-2013Semiconductor converters -- General requirements and line commutated Converters -- Part 1-1: Specification of basic requirements
Similar standards
Editions of GB/T 25388.2
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 25388.2-2021 | Wind turbines generator system—Double-fed converter—Part 2: Test method | current edition | Current |
| GB/T 25388.2-2010 | Wind turbines generator system—Double-fed converter—Part 2: Test method | previous edition | Superseded |
This page sells the current edition, GB/T 25388.2-2021. Earlier editions are listed for reference only.
How to Download GB/T 25388.2-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 17626.3-2023 — Electromagnetic compatibility - Testing and measurement techniques - Part 3: Radiated, radio-frequency, electromagnetic field immunity test
GB/T 17626.30-2023 — Electromagnetic compatibility - Testing and measurement techniques - Part 30: Power quality measurement methods
GB/T 17626.31-2021 — Electromagnetic compatibility - Testing and measurement techniques - Part 31: AC mains ports broadband conducted disturbance immunity test
Secure payment via Stripe
Payments accepted
GB/T 25388.2-2021
$330.00