GB/T 22390.3-2008Control and protection equipment of HVDC transmission systems - Part 3: DC pole control equipment (English PDF)
高压直流输电系统控制与保护设备 第3部分:直流系统极控设备
Open the GB/T 22390.3-2008 preview as PDF
This is a limited preview
Buy now to download the full PDF (18 pages)
Issued by
General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of the PRC
Level / Type
National · Recommended
Issue date
September 24, 2008
Implementation date
August 1, 2009
Scope
GB/T 22390.3-2008 is the English-translated version of 高压直流输电系统控制与保护设备 第3部分:直流系统极控设备.
China's national standard for the DC pole control equipment of a high voltage direct current transmission scheme. It is Part 3 of GB/T 22390 and specifies the technical requirements, the test methods, the inspection rules and the supply and documentation requirements for pole control equipment. Pole control is where an HVDC link is actually operated. Everything above it decides what the link should do; pole control makes it happen, by computing the firing angle of the valves and issuing the firing pulses, thousands of times a second, with a timing accuracy measured in microseconds relative to the alternating voltage. The current through the link is controlled by the difference between the direct voltage the rectifier produces and the direct voltage the inverter maintains, and both are set by firing angle - so a small error in angle is a large error in current, and the loop that regulates it has to be fast, stable, and stable also when the AC system at either end is weak or disturbed. The inverter carries the harder problem. A line-commutated inverter relies on the AC voltage to turn its valves off, and if the voltage dips or the angle is wrong the valve fails to commutate: the current transfers to the wrong valve, the DC side is short-circuited through the bridge, and a commutation failure results, which interrupts transmission and stresses the equipment. Preventing them, and recovering from those that occur, is one of the defining tasks of pole control. The requirements accordingly cover the current and voltage regulators and their dynamic performance, the firing control and its synchronisation, the tap changer control, the power order ramping and the modulation functions, the redundancy and changeover, and the behaviour during and after AC system faults. Issued on 24 September 2008 and in force since 1 August 2009.
Document preview — GB/T 22390.3-2008
National Standard of the People's Republic of China
- ICS
- 29.240.01
- Classification
- K 45
Issued by: General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of the PRC
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and definitions 24
- 5 Test methods 911
- 6 Inspection Rules 7 signs, labels, Owner's Manual 12 8 packaging, transportation and storage 13 9 sets of supply14
- 10 Quality Assurance14
Foreword
According to the 2003 National Science and Technology Science and Technology Platform project focused "DC power transmission system core technology and infrastructure standard Research "(Project No. 2003DIA7J034) requirements formulated standard" HVDC system control and protection equipment. " GB/T 22390 "HVDC system control and protection equipment" is divided into six parts.
--- Part 1. Operator Control System;
--- Part 2. AC and DC station control system equipment;
--- Part 3. DC pole control system equipment;
--- Part 4. DC system protection equipment;
--- Part 5. DC line fault location device;
--- Part 6. Converter Station transient fault recorder. This section GB/T Part of 322,390. This section proposed by the China Electrical Equipment Industry Association and the China Electricity Council. This part of the National Standardization Technical Committee of HVDC equipment (SAC/TC333) centralized. This part mainly drafted by: XJ Group Corporation, Nanjing NARI-RELAYS Electric Co., Ltd., Beijing Network of DC engineering technology Ltd., China Southern Power Grid Co., Ltd., Xuchang Relay Research Institute, Chinese Academy of Sciences electricity. The main drafters of this section. Guo Hongguang, Tian Jie, Yu Tao, Yao Zhiqing, around, Maoshi Tao, Li Yaping, Li Yan, Li Zhiyong, Wang Mingxin, Han Wei, Shiyan. This section first release. HVDC system control and protection equipment Part 3. DC pole control system equipment
1 Scope
China's national standard for the DC pole control equipment of a high voltage direct current transmission scheme. It is Part 3 of GB/T 22390 and specifies the technical requirements, the test methods, the inspection rules and the supply and documentation requirements for pole control equipment. Pole control is where an HVDC link is actually operated. Everything above it decides what the link should do; pole control makes it happen, by computing the firing angle of the valves and issuing the firing pulses, thousands of times a second, with a timing accuracy measured in microseconds relative to the alternating voltage. The current through the link is controlled by the difference between the direct voltage the rectifier produces and the direct voltage the inverter maintains, and both are set by firing angle - so a small error in angle is a large error in current, and the loop that regulates it has to be fast, stable, and stable also when the AC system at either end is weak or disturbed. The inverter carries the harder problem. A line-commutated inverter relies on the AC voltage to turn its valves off, and if the voltage dips or the angle is wrong the valve fails to commutate: the current transfers to the wrong valve, the DC side is short-circuited through the bridge, and a commutation failure results, which interrupts transmission and stresses the equipment. Preventing them, and recovering from those that occur, is one of the defining tasks of pole control. The requirements accordingly cover the current and voltage regulators and their dynamic performance, the firing control and its synchronisation, the tap changer control, the power order ramping and the modulation functions, the redundancy and changeover, and the behaviour during and after AC system faults. Issued on 24 September 2008 and in force since 1 August 2009.
This section GB/T 22390 specifies the technical requirements of ± 500kV HVDC system DC pole control device, test Methods, inspection rules, packaging, transportation, storage, marking, labeling, instruction manual, complete sets of supply and quality assurance. This section applies to ± 500kV HVDC system DC pole control device (hereinafter referred to as the device).
2 Normative references
The following documents contain provisions which, through reference
GB/T 22390 in this section constitute provisions of this section. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section.
GB/T 2887-2000 General specification for computer sites
GB 4208-1993 housing protection (IP Code) (eqv
IEC 60529. 1989) Basic testing method
GB/T 7261-2000 and the relay means
GB/T 9361-1988 computer site security requirements
GB 9969.1-1998 Instructions General Industrial Products
GB/T 11287-2000 Electrical relays - Part 21. Measuring relays and protection equipment vibration, shock, bump and seismic Test Section 1. Vibration tests (sinusoidal) (idt IEC 60255-21-1. 1988) GB/T 13498 HVDC term ( GB/T 13498-2007, IEC 60633.1998, IDT)
GB/T 13730-2002 regional dispatching automation system
GB/T 14537-1993 and measure impact crash tests (idt
IEC 60255-21-2. 1988) relays and protection equipment
GB/T 14598.16-2002 Electrical relays - Part 25. Electromagnetic emission tests for measuring relays and protection equipment ( IEC 60255-25.2000, IDT)
GB 16836-2003 General requirements Measuring relays and protection equipment safety design
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 18 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2887-2000General specification for computer field
- GB/T 7261-2000Basic test methods for protection relays and security automatic equipment
- GB/T 9361-1988Safety requirements for computer field
- GB/T 13730-2002Dispatching automation systems for distric power networks
- GB/T 17626.9-1998Electromagnetic compatibility - Testing and measurement techniques - Part 9: Impulse magnetic field immunity test
GB/T 22390 · GB 4208-1993 · IEC 60529 · GB 9969.1-1998 · GB/T 11287-2000 · IEC 60255 · GB/T 13498-2007 · IEC 60633.1998 · GB/T 14537-1993 · GB/T 14598.16-2002 · GB 16836-2003 · GB/T 17626.2-2006 · IEC 61000 · GB/T 17626.3-1998 · GB/T 17626.4-1998 · GB/T 17626.5-1999 · GB/T 17626.6-1998 · GB/T 17626.8-2006
Similar standards
How to Buy GB/T 22390.3-2008
- 1Add to cart. Click the "Buy GB/T 22390.3-2008" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 13730-2002 — Dispatching automation systems for distric power networks
GB/T 22390.1-2008 — Control and protection equipment of HVDC transmission systems - Part 1: Operator control system
GB/T 22390.2-2008 — Control and protection equipment of HVDC transmission systems - Part 2: AC and DC station control equipment
Secure payment via Stripe
Payments accepted
GB/T 22390.3-2008
$108.00