Valid

GB/T 18362-2008Direct-fired lithium bromide absorption water chiller (heater) (English PDF)

直燃型溴化锂吸收式冷(温)水机组

Open the GB/T 18362-2008 preview as PDF

Preview — first pages of GB/T 18362-2008 (full document: 31 pages)

This is a limited preview

Buy now to download the full PDF (31 pages)

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China

Level / Type

National · Recommended

Issue date

November 12, 2008

Implementation date

May 1, 2009

Scope

GB/T 18362-2008 is the English-translated version of 直燃型溴化锂吸收式冷(温)水机组.

GB/T 18362-2008 is the Chinese national standard on direct-fired lithium bromide absorption water chiller (heater), in the field of energy and heat transfer engineering. The /T suffix marks it as a recommended standard: it is not compulsory by itself, but it becomes binding as soon as a contract, a tender or a customer specification calls it up - which in practice is how most foreign buyers meet it. It was issued on 12 November 2008 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China, and has been in force since 1 May 2009. Classification: ICS 27.200, CCS J73. This page is published from the official record of the standard held by the Chinese standards administration: the identification, the dates, the classification and the issuing body are taken from there. The clause text, the tables and the numeric limits are in the document itself, which is delivered complete in English translation.

Document preview — GB/T 18362-2008

National Standard of the People's Republic of China

ICS
27.200
Classification
J73

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions...
  • 4 Type and basic parameters
  • 4.1 Type
  • 4.1.1 Classification by usage performance
  • 4.1.2 Classification by fuel
  • 5 Technical requirements...
  • 6 Test methods
  • 6.1.1 Power supply: The rated frequency ±
  • 6.3.11 Partial load characteristics
  • 7 Inspection rules...
  • 8.2 Packaging
  • 8.3 Transportation and storage
  • Appendix D

Foreword

This standard is a revision of GB/T 18362-2001 "Direct-fired lithium bromide absorption water chiller (heater)". As compared with GB/T 18362-2001, the main changes are as follows: - In clause 4.1, CANCEL the original methods of classification by refrigeration cycle and by the installation site. - In clause

4.2.1 Nominal conditions, ADD the selectable reference values of the cold-water inlet-temperature of 14 °C. - CHANGE the fouling factor of nominal condition in clause

0.086 m2-°C/kW to

0.018 m2-°C/kW at the water-side of the evaporator and

0.044 m2-°C/kW at the water-side of the condenser and absorber. MAKE reference to the methods of GB/T 18430.1-2007 to carry out test and calculation. - INCLUDE the calculation method of the coefficient of performance in

6.3.5 into Appendix A. - MODIFY the withstanding pressure at water-side in

6.3.8 to a hydraulic pressure test of

1.25 times the design pressure. - In the inspection rules, ADD the sampling inspection requirements and testing content. - In Table 6, ADJUST the electromagnetic compatibility test from the exit- factory inspection to the type inspection. - In Appendix A.11, MODIFY the calculation of exhaust heat loss to adopt the formula of GB 10180. This standard replaces GB/T 18362-2001 as of the date of implementation. Appendix A, Appendix B, Appendix C of this standard are normative appendixes. Appendix D is an informative appendix. This standard was proposed by the China Machinery Industry Federation. This standard shall be under the jurisdiction of the National Refrigeration and Air Conditioning Equipment Standardization Technical Committee. Drafting organizations of this standard: Yuanda Air Conditioning Co., Ltd., Hefei General Machinery Research Institute. The main drafters of this standard: Zhang Yue, Chen Bokun, Wang Jindong, Direct-fired lithium bromide absorption water chiller (heater)

1 Scope

GB/T 18362-2008 is the Chinese national standard on direct-fired lithium bromide absorption water chiller (heater), in the field of energy and heat transfer engineering. The /T suffix marks it as a recommended standard: it is not compulsory by itself, but it becomes binding as soon as a contract, a tender or a customer specification calls it up - which in practice is how most foreign buyers meet it. It was issued on 12 November 2008 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China, and has been in force since 1 May 2009. Classification: ICS 27.200, CCS J73. This page is published from the official record of the standard held by the Chinese standards administration: the identification, the dates, the classification and the issuing body are taken from there. The clause text, the tables and the numeric limits are in the document itself, which is delivered complete in English translation.

This standard specifies the terms and definitions, types and basic parameters, technical requirements, test methods, inspection rules, marking, packaging, transportation and storage of direct-fired lithium bromide absorption water chiller (heater) (shortly referred to as direct-fired units). This standard is applicable to units that use direct combustion of fuel and gas as heat-source, water as refrigerant, lithium bromide aqueous solution as absorption liquid, alternately or simultaneously produce air conditioning, process cold-water, warm-water and domestic warm-water. Other units of the same type may make reference to this standard.

2 Normative references

The provisions in following documents become the provisions of this standard through reference in this standard. For the dated references, the subsequent amendments (excluding corrections) or revisions do not apply to this standard; however, parties who reach an agreement based on this standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies.

GB 252-2000 Light diesel fuels

GB 9969.1-1998 General principles for preparation of instructions for use of industrial products

GB/T 10180-2003 Thermal performance test code for industrial boilers

GB 11174-1997 Liquefied petroleum gases GB/T 13306-1991 Plates

GB 13612-1992 Manufactured gas

GB 17820-1999 Natural gas

GB 18361-2001 Safety requirements of lithium bromide absorption water chiller (beater)

3.6 Nominal flowrate The flowrate of water, fuel, etc. when the unit is subject to cooling capacity and heating capacity test. Unit: m3/h, L/h or kg/h.

3.7 Maximum application pressure The maximum pressure for the safe use of gas, fuel, water, etc., to be guaranteed by the structural strength of the unit. Unit: MPa.

3.8 Rated pressure drop The pressure loss value as generated by the rated flowrate of cold-water, warm-water, chilling water, etc. when passing through the unit. Unit: MPa.

3.9 Supporting facilities A fuel system, a water pump, a cooling tower, a flue, a water piping attached to the outside of the direct-fired unit.

4.1.1 Classification by usage performance

a) Cooling-only type: The direct-fired unit which only supplies cold-water.

b) Cooling & heating type: The direct-fired unit which alternatively or simultaneously supplies cold-water and warm-water.

4.1.2 Classification by fuel

a) Gas type: A unit that uses artificial gas, liquefied petroleum gas, natural gas, other gaseous fuels.

b) Fuel type: A unit that uses liquid fuel such as light diesel oil or heavy diesel oil.

4.2 Basic parameters power consumption.

5.3.5 The measured coefficient of performance of the unit shall not be less than 95% of the nominal coefficient of performance.

5.3.6 The pressure drop of cold (hot) water and cooling-water of the unit shall not exceed 110% of the rated pressure drop.

5.3.7 The leakage rate of the unit shall not exceed

5.3.8 The pipeline at water-side of the unit shall be free from abnormal deformation or water leakage.

5.3.9 The noise of the unit shall comply with environmental protection regulations and design requirements.

5.3.10 The safety performance of the unit: the pressure resistance, airtightness, insulation resistance, withstanding voltage strength, electromagnetic compatibility, performance of the combustion equipment, the action of the safety protection device of the fuel piping system shall comply with the requirements of GB 18361-2001.

5.3.11 The cooling (heating) capacity control device of the unit shall be sensitive and reliable. Partial load characteristics are in accordance with Table 4. Table 4 -- Partial load characteristics of direct-fired unit Cold (hot) water Cooling-water Cooling conditions Outlet temperature 7 °C Flowrate same as rated flowrate Inlet temperature: 30 °C at 100% load, 22 °C at 0% load, intermediate temperature changes linearly with load. Flowrate same as rated flowrate Heating conditions Outlet temperature 60 °C Flowrate same as rated flowrate

Note: Partial load performance data (cooling capacity, heating capacity, heat-source consumption) are expressed as a percentage of the load performance data under nominal conditions.

6 Test methods

6.1 Test conditions The conditions and error ranges that shall be met during the test are as follows:

6.1.1 Power supply: The rated frequency ±

1 Hz. The rated voltage ± 10%.

6.1.2 Cold-water: The outlet temperature is 7 °C ± 0.3 °C. The flowrate is ± 5% of the nominal value.

6.3.6 Pressure loss at water-side When the value of the cooling capacity is stable in the test of

6.3.1 and the value of the heating capacity is stable in the test of 6.3.2, use the method and formula as shown in Appendix C to calculate the pressure loss at the cold-water side, the cooling-water side, or the warm-water side.

6.3.7 Airtightness of chiller After passing the leak testing by the use of dry clean air or nitrogen foaming as well as the pressure holding test, use the helium mass spectrometer for leak detection:

a) Connect the unit to the helium mass spectrometer and the supporting vacuum pump. After vacuuming to the required vacuum level of the helium mass spectrometer, directly spray the helium gas on the unit's possible leaks (welds, seals, etc.), use the helium mass spectrometer to make partial leak detection of the unit;

b) Place the unit in the hood, connect the helium mass spectrometer to the supporting vacuum pump. After vacuuming to the required vacuum level of the helium mass spectrometer, turn off the supporting vacuum pump. Fill helium gas in the gas hood. Use the helium mass spectrometer to detect the overall leak rate of the unit.

6.3.8 Pressure resistance at water-side Use a clean water of not less than 5 °C to empty the air from the water-side, to carry out pressure resistance test. The test pressure is

1.25 times the design pressure. Apply the pressure for more than 10 minutes. Carry out inspection. The results shall comply with the provisions of 5.3.8. After completing the test, empty the water and blow it dry.

6.3.9 Noise When the value of the cooling capacity is stable in the test of 6.3.1, use the method of JB/T 4330-1999 to determine and calculate the noise of unit.

6.3.10 Safety performance The test of pressure resistance, airtightness, insulation resistance, withstanding voltage strength, electromagnetic compatibility, performance of combustion equipment, action of safety protection devices of the fuel piping system shall be carried out in accordance with the method as specified in GB 18361-2001.

6.3.11 Partial load characteristics

a) Proportional control

e) Date of manufacture.

8.1.2 The relevant parts of the unit shall be marked with signs of operation status (such as direction change, flow direction, etc.). For places that are prone to human injury (such as high-temperatures, etc.), it shall be attached with a prominent safety mark.

8.1.3 Units which are exit-factory with filled absorbent liquid shall be clearly marked.

8.2 Packaging

8.2.1 The unit shall take anti-rust measures. Randomly exit-factory parts shall be rust-proof and fixed in the packaging box.

8.2.2 If the unit is exit-factory as a whole, it shall be filled with

0.01 MPa ~

0.03 MPa of nitrogen or kept under vacuum before packaging.

8.2.3 The following documents shall be included in the exit-factory packaging of each unit:

8.2.3.1 Product certification.

8.2.3.2 Instructions for installation and use. The content shall meet the requirements of GB 9969.1-1998, including:

a) Signage content and other technical parameters (pressure loss at water- side, geometric size, solution filling volume, operating mass, etc.);

b) Instructions, requirements and precautions for product transportation, storage, installation;

c) Precautions for use and maintenance instructions. Its contents are as shown in Appendix D.

8.2.3.3 Packing list.

8.3 Transportation and storage

8.3.1 During transportation and storage of the unit, it shall take the anti-rust measures. It shall be stored in covered areas.

8.3.2 The valve connecting the unit to the atmosphere shall not be easily opened.

8.3.3 The exposed threaded joint of the unit is plugged by bolts and the flange holes are covered with blind plates, to prevent debris from entering. A.4.1 The unit to be tested has installed the auxiliary device as necessary for operation, the air in the water pipe of the test device has been exhausted, meanwhile it is confirmed that it has been filled with water. A.4.2 The unit to be tested has been filled with the specified amount of lithium bromide solution and additives; meanwhile it is pumped to the vacuum level as required for operation. A.5 Test conditions The test conditions are in accordance with

6.1 of this standard. A.6 Test essentials A.6.1 After reaching to and stabilizing at the status of the test conditions, carry out test. A.6.2 The test of each data at the same time shall be carried out simultaneously, to reduce the impact of fluctuations in test conditions. A.6.3 Carry out test every 15 minutes, take the average of the data that meets the test conditions three times or more in succession as the calculation basis. A.6.4 The data for each test shall be checked by thermal equilibrium method; the deviation shall be within ± 5%. A.7 Test record A.7.1 Evaporator (in case of cooling)

a) Cold-water inlet temperature, °C;

b) Cold-water outlet temperature, °C;

c) Cold-water flowrate, m3/h. A.7.2 Evaporator, absorber, condenser, warm-water exchanger (in case of heating)

a) Warm-water inlet temperature, °C;

b) Warm-water outlet temperature, °C;

c) Warm-water flowrate, m3/h. A.7.3 Absorber, condenser (heat gain in case of cooling)

a) Cooling-water inlet temperature, °C;

Appendix D

Note 1. 2. **Search (Optional).** Enter the keyword '**GB/T 18362-2008**' in the search bar, if it is not already shown. 3.

Note 2. 9.

Note 3. 10. **Verification (USD

Notes and Explanations

Note 1:**[GB/T 18362-2008](https://

Note 3:** If you are unable to redirect back to our Return Page, do not worry. **Additionally and independently**, our automated system will still deliver your PDF and Invoice via email **(the second mechanism to ensure the delivery)**, typically within 3 minutes. Once your payment is complete, you have two instant ways to access your PDF and invoice: you may stay on the Return Page for download in 3 minutes typically, or simply check your email inbox where a copy is automatically delivered in 3 minutes typically.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 31 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 18362

EditionTitleRevisionStatus
GB/T 18362-2008Direct-fired lithium bromide absorption water chiller (heater)current editionCurrent
GB/T 18362-2001Direct-fired lithium bromide absorption water chiller(heater)previous editionSuperseded

This page sells the current edition, GB/T 18362-2008. Earlier editions are listed for reference only.

How to Buy GB/T 18362-2008

  1. 1Add to cart. Click the "Buy GB/T 18362-2008" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
31 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 18362-2008

$130.00

$110.00for partners