Scope

GB/T 15468-2020 is the English-translated version of 水轮机基本技术条件.

GB/T 15468-2020 is the Chinese national standard on fundamental technical requirements for hydraulic turbines, in the field of energy and heat transfer engineering. The /T suffix marks it as a recommended standard: it is not compulsory by itself, but it becomes binding as soon as a contract, a tender or a customer specification calls it up - which in practice is how most foreign buyers meet it. It was issued on 2 June 2020 by the State Administration for Market Regulation; Standardization Administration of China, and has been in force since 1 January 2021. Classification: ICS 27.140, CCS K55. This page is published from the official record of the standard held by the Chinese standards administration: the identification, the dates, the classification and the issuing body are taken from there. The clause text, the tables and the numeric limits are in the document itself, which is delivered complete in English translation.

Document preview — GB/T 15468-2020

National Standard of the People's Republic of China

ICS
27.140
Classification
K55

Issued by: State Administration for Market Regulation; Standardization Administration of China

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 3.1 Characteristic water level of hydropower station
  • 3.2 Gross head of hydropower station
  • 3.3 Turbine head
  • 4 Technical requirements
  • 4.1 General requirements
  • 4.2 The structure and materials of the main components
  • 4.2.1 General requirements for structural design
  • 4.2.2 Working stress and safety factor
  • 4.3.4 Impulse turbine
  • 5 Performance guarantee
  • 5.2 Steady-state hydraulic performance
  • 5.4 Vibration
  • 5.5 The stable operating range of turbine
  • 5.7 Water leakage of guide vanes or nozzles
  • 6 Basic functions of turbine control system
  • 7 Scope of supply and spare parts
  • 7.1 Scope of supply
  • 8 Data and drawings
  • 8.2 Key items
  • 9 Factory inspection and testing
  • 10 Nameplate, packaging, transportation and storage...

1 Scope

GB/T 15468-2020 is the Chinese national standard on fundamental technical requirements for hydraulic turbines, in the field of energy and heat transfer engineering. The /T suffix marks it as a recommended standard: it is not compulsory by itself, but it becomes binding as soon as a contract, a tender or a customer specification calls it up - which in practice is how most foreign buyers meet it. It was issued on 2 June 2020 by the State Administration for Market Regulation; Standardization Administration of China, and has been in force since 1 January 2021. Classification: ICS 27.140, CCS K55. This page is published from the official record of the standard held by the Chinese standards administration: the identification, the dates, the classification and the issuing body are taken from there. The clause text, the tables and the numeric limits are in the document itself, which is delivered complete in English translation.

This standard specifies the performance guarantee, technical requirements, scope of supply, inspection and test items for the design and manufacture of hydraulic turbine products; proposes the requirements to be followed, for its packaging, transportation, storage, installation, operation, maintenance. This standard applies to hydraulic turbine products, that meet one of the following conditions.

a) The rated power is 10 MW and above;

b) For Francis and impulse turbines, the nominal diameter of the runner is

1.0 m and above;

c) For Kaplan, Deriaz and bulb turbine, the nominal diameter of the runner is

3.0 m and above.

2 Normative references

The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) is applicable to this standard.

GB/T 191 Packaging - Pictorial marking for handling of goods ( GB/T 191- 2008, ISO 780.1997, MOD)

GB/T 2900.45 Electrotechnical terminology - Hydroelectric powerplant machinery (

GB/T 2900.45-2006, IEC/TR 61364.1999, MOD)

GB/T 3323.1 Non-destructive testing of welds - Radiographic testing - Part 1: X-and gamma-ray techniques with film

GB/T 8564 Specification for installation of hydraulic turbine generator Unit

GB/T 9239.1 Mechanical vibration - Balance quality requirements for rotors in a constant (rigid) state - Part

1.Specification and verification of balance tolerances ( GB/T 9239.1-2006, ISO 1940-1.2003, IDT)

GB/T 9797 Metallic coatings - Electroplated coatings of nickel plus chromium and of copper plus nickel plus chromium ( GB/T 9797-2005, ISO 1456.2003, IDT)

3 Terms and definitions

The terms and definitions as defined in GB/T 2900.45, as well as the following terms and definitions, apply to this document.

3.3 Turbine head

3.3.1 Head The effective head of the hydraulic turbine, which is the total unit energy of the high and low pressure reference cross-section of the turbine.

Note. The unit is meter (m).

4.1 General requirements

4.1.1 The design and manufacture of hydraulic turbines shall be based on the characteristics and basic parameters of the hydropower station, to optimize the type and main parameters of the turbine, to ensure the safe, reliable, stable, efficient operation of the turbine.

4.1.4 For the design of hydraulic turbine, it shall provide the type, layout, model, as well as the following basic parameters.

4.1.5 The following technical documents shall also be given for the design of the turbine.

4.1.6 The efficiency correction of the reaction turbine is to be corrected, according to the formula in Appendix A. The efficiency of the impulse turbine is generally not corrected; however, if correction is required, it shall be carried out in accordance with Appendix B.

4.2.1 General requirements for structural design

4.2.1.6 The standard parts and components of hydraulic turbines shall ensure their universality, for example, use runner whose torque is transmitted by friction; nozzles, needles shall be interchangeable.

4.2.1.7 The allowable continuous running time of the turbine, at the maximum runaway speed, shall not be less than the allowable runaway time of the supporting generator. Meanwhile, it shall be ensured that the rotating parts of the turbine NEITHER produces harmful deformation NOR causes collision and damage. Facilities shall be provided to prevent the turbine from exceeding the allowable runaway time.

4.2.1.22 The metal volute of the reaction turbine and the water distribution pipe of the impulse turbine, may be subjected to a pressure test, according to the requirements of the contract.

4.2.2 Working stress and safety factor

4.2.2.7 Unless otherwise specified, where there is no prestressing requirement, the pre-tightening force shall not be less than

2.0 times the maximum working load of the connected object, under normal working conditions and transitional working conditions, which is converted to the axial load of the bolt.

4.3.4 Impulse turbine

4.3.4.1 It shall be possible to assemble, disassemble, replace the runner of the impulse turbine, without disassembling the generator.

4.3.4.2 The runner shall be subjected to dynamic response analysis, to avoid resonance.

5 Performance guarantee

5.1 Warranty period The warranty period of the product is two years, from the date when the turbine is put into commercial operation, OR three years, from the date of delivery of the last batch of goods, whichever expires first.

5.2 Steady-state hydraulic performance

5.3.3 When the content of sediment in the water is high, the abrasion damage of the turbine shall be guaranteed.

5.5 The stable operating range of turbine

5.5.1 Within the range of maximum and minimum heads, which are specified in 4.1.4, the power range for stable operation of the turbine is in accordance with Table 5.

5.7 Water leakage of guide vanes or nozzles

5.7.1 Under the rated water head, for the newly commissioned unit, the water leakage of the guide vanes of the cylindrical arrangement shall not be greater than 0.3% of the rated flow of the turbine; the water leakage of the guide vanes of the conical arrangement shall not be greater than 0.4% of the rated flow of the turbine.

5.8 Noise When the turbine is operating normally within the stable operating range, the noise, which is measured 1 m above the enclosure of the impulse turbine, shall not be greater than 85 dB(A). The noise, which is measured within 1 m around the runner chamber of the bulb turbine, shall not be greater than 90 dB(A). The noise, which is measured 1 m above the floor of the turbine pit for other types of units, shall not be greater than 95 dB(A). The noise, which is measured 1 m away from the manhole of the tail water tube, shall not be greater than 95 dB(A).

5.9 Water thrust For the reaction turbine, it shall guarantee the maximum forward water thrust and maximum reverse water thrust, under normal working conditions and transitional working conditions.

6 Basic functions of turbine control system

6.1 The instruments, which are equipped on the hydraulic turbine equipment (see Appendix D), should be installed on a special panel.

6.4 When one of the following situations (but not limited to) occurs, the hydraulic turbine shall be able to automatically accident or emergency shutdown.

7.1 Scope of supply

7.1.1 For Francis turbine, it includes tail water tube's metal lining, metal volute and volute extension (if any), seat ring, base ring, water guiding mechanism, thrust bearing bracket (if any), cylindrical valve system (if any), runners, turbine shafts, water guide bearings, working seals, overhaul seals, turbine pit linings, connections between parts, turbine pit lighting devices, air supplement systems, pedestrian pedals and handrails, portable overhaul platforms in tail water tube, drainage equipment, other supporting equipment, etc.

7.1.4 For the impulse turbine, it includes the metal lining of the tail water sump, water stabilizing grid, water distribution ring pipe, enclosure, enclosure cover, nozzle (including the nozzle ring, nozzle port, nozzle tube, needle, needle servomotor, protective cover, etc.),

7.1.6 Piping and its accessories. All oil pipes, air pipes, water pipes, water supply equipment for main shaft seal, connectors, brackets, which are required in or between the parts within the scope of the contract.

7.1.7 Dedicated tools and special tools, which are required for installation and maintenance.

7.1.8 The instruments and equipment, which are required for the acceptance test of the prototype turbine, shall be negotiated between the supplier and the buyer.

7.3 Spare parts and components For the items and quantities of spare parts and components for hydraulic turbines, they are selected with reference to Tables E1, E2, E3, E4 in Appendix E. Meanwhile, it shall be specified in the contract, between the supplier and the buyer.

8 Data and drawings

8.1 Delivery time and quantity The supplier shall submit the drawings and documents to the buyer; the delivery time and quantity shall be stipulated in the contract. Meanwhile, it shall provide the purchaser and the power station design unit, with the electronic files of the final drawings and materials, which are specified in the contract.

8.2 Key items

8.2.1 Layout drawing of hydraulic turbine and its auxiliary equipment, regulation guarantee calculation report.

8.2.5 The relationship diagram BETWEEN guide vane opening or rotation angle or nozzle stroke AND servomotor stroke; the basic force data; other important calculation reports of the turbine, etc.

8.2.6 The technological process, drawings, documents related to the arrangement, assembly, welding, processing of the turbine and its auxiliary equipment on the site.

8.2.7 Control and monitoring. Installation and layout diagrams of various panels and automation equipment; automatic operation of hydraulic turbines and system diagrams of oil, gas, water; configuration diagrams of hydraulic turbine measuring instruments, etc.

9 Factory inspection and testing

9.1 It shall provide the exit-factory qualification certificate, material chemical composition, mechanical performance report, for each key part of the turbine. Meanwhile they shall be inspected, according to the inspection items, which are stipulated in the contract;

9.2 The pre-installation of the hydraulic turbine shall be carried out, in accordance with the contract or technical agreement. For the relevant parts of the turbine, that cannot or is difficult to be pre-installed in the supplier's workshop, after the supplier and the buyer have reached an agreement, they can be moved to the site according to GB/T 8564 AND with reference to the supplier's relevant requirements. The supplier is responsible for technical guidance.

9.4 The inspection and test items of the key components of the hydraulic turbine, in the manufacturing process, are as shown in Table 6, Table 7, Table 8, Table

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 73 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 15468

EditionTitleRevisionStatus
GB/T 15468-2020Fundamental technical requirements for hydraulic turbinescurrent editionCurrent
GB/T 15468-2006Fundamental Technical Requirements for Hydraulic Turbinesprevious editionSuperseded

This page sells the current edition, GB/T 15468-2020. Earlier editions are listed for reference only.

How to Buy GB/T 15468-2020

  1. 1Add to cart. Click the "Buy GB/T 15468-2020" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
73 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 15468-2020

$590.00

$500.00for partners