GB/Z 32583-2016Technical guideline for 1 000 MW class Francis hydraulic turbines (English PDF)
1000MW级混流式水轮机技术导则
Also coversGBZ32583-2016
This is a limited preview
Buy now to download the full PDF (9 pages)
Need quotation for your management?
Get a formal quotation for GB/Z 32583-2016 in 30 minutes.
Issued by
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China, China National Standardization Administration
Level / Type
National · Recommended
Issue date
April 25, 2016
Implementation date
November 1, 2016
Scope
GB/Z 32583-2016 is the English-translated version of 1000MW级混流式水轮机技术导则.
GB/Z 32583-2016 — This Guidance Document specifies the main technical parameters and performance requirements for a 1000MW Francis turbine. The overall structure Etc.
This Guidance Document is applicable to the preparation, design, manufacture, installation, operation, etc. of bidding documents of 1000MW Francis turbine the guidance and reference.
This Guidance Document 1000MW Francis turbine refers to the turbine rated power (or nameplate power) 862MW ~ 1100MW, and the rated head range of 100m ~ 300m Francis turbine.
Found what you need?
Document preview — GB/Z 32583-2016
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- K 55
Issued by: General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China, China National Standardization Administration
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Main technical parameters and performance requirements
- 4.1 General principles
- 4.2 The selection of the main technical parameters
- 4.3 The main performance requirements
- 4.4 Parts stiffness performance
- 5 Structure design
- 5.1 Overall structure
- 5.2 Runner
- 5.3 Spindle
- 5.4 Spindle seal
- 5.5 Water guide bearing
- 5.6 Seat ring
- Volute 5.7
- 5.8 Draft tube
- 5.9 Top cover
- 5.10 Bottom ring and base ring
- 5.11 Guide vane and guide vane operating mechanism
- 5.12 Guide vane relay
- 5.13 Gas system
- Appendix A (informative) unit under different head range parameter selection and the required reference value of
Foreword
This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009.
This guidance document is proposed by China Electrical Equipment Industry Association.
This Guidance Document is organized by the National Committee for Standardization of Hydraulic Turbines (SAC/TC175).
The main drafting of the technical guidance of the unit. Harbin Electric Works Co., Ltd., Dongfang Electric Group Dongfang Electric Co., Ltd., China Academy of Water Conservancy and Hydropower Research, China Three Gorges Corporation, China East Construction Engineering Research Institute Co., Ltd., Yangtze River Survey Planning Design Co., Ltd.
Introduction
The overall level of large-scale hydropower equipment manufacturing industry continues to improve, stand-alone capacity continues to grow, stand-alone capacity of one million kilowatts of hydroelectric units for the staged achievements, it is necessary to organize the development of standards and provide technical preparation for the commissioning of units.
This guiding technical document is based on the project of Wudongde and Baihetan Hydropower Station and is based on the research results of the following two research projects.
1) National Science and Technology Support Project "Research on Key Technologies of 1000MW Hydropower Units"; 2) China Three Gorges Corporation Project "One Million the overall design of hydroelectric generating units, turbine hydraulic design and model tests. " this guidance document is based on the construction, of large-scale hydro-generator set design, manufacture, operating experience to study, sum up and total Based on the conclusion, according to the relevant current international, national and industry standards or norms for preparation.
The basic principles for the preparation of this technical guidance document are to highlight the characteristics and important concerns of a million-kilowatt hydroelectric generating unit.
The basic requirements and the current standards have repeated content, is the stage of innovative products in the development phase of the guidance document.
Technical Guidelines for 1000MW Francis Turbine
1 Scope
This Guidance Document specifies the main technical parameters and performance requirements for a 1000MW Francis turbine. The overall structure Etc.
This Guidance Document is applicable to the preparation, design, manufacture, installation, operation, etc. of bidding documents of 1000MW Francis turbine the guidance and reference.
This Guidance Document 1000MW Francis turbine refers to the turbine rated power (or nameplate power) 862MW ~ 1100MW, and the rated head range of 100m ~ 300m Francis turbine.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2900.45 Electrotechnical terminology Hydropower equipment (GB/T 2900.45-2006, IEC/T R61364.1999, MOD) GB/T 8564 turbine generator installation technical specifications Hydraulic turbine, accumulator pump and pump turbine flow passage components - Technical conditions GB/T 11348.5-2008 Rotating machinery - Measurement and assessment of radial vibration of shafts - Part 5. Hydroelectric power plants and pumping units (ISO 7919-5:2005, IDT) GB/T 15468 turbine basic technical conditions GB/T 15469.1-2008 turbines, storage pumps and pump turbines cavitation assessment Part 1 cavitation erosion of the impact turbine assessment GB/T 17189 hydraulic machinery (turbines, storage pumps and pump turbines) vibration and pulsation field measurement procedures (GB/T 17189-2007, IEC 60994:1991, MOD) NB/T 47013.10-2015 Nondestructive testing of pressure equipment - Part 10 - Ultrasonic testing by diffractometry
3 Terms and definitions
GB/T 2900.45, GB/T 15468 defined terms and definitions apply to this document.
4 Main technical parameters and performance requirements
4.1 General principles
General Principles for Parameter Selection and Performance Requirements of 1000 MW Francis Turbine Units.
a) The main technical parameters should be selected to meet the dry season (or high water head) with high efficiency, flood season (or low head) can generate more electricity in principle;
b) When there is a conflict between the energy performance and the stability of the unit, priority should be given to the stability;
c) The long-term stability of the unit to ensure the scope of the appropriate head should use 60% to 100% of the guaranteed power to increase its service life;
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2900.45Electrotechnical terminology -- Hydroelectric powerplant machinery
- GB/T 2900.45-2006Electrotechnical terminology -- Hydroelectric powerplant machinery
- GB/T 8564Technical specification for installation of hydraulic turbine-generator unit
- GB/T 11348.5-2008Mechanical vibration evaluation of machine vibration by measurements on rotating shafts -- Part 5: Machine sets in hydraulic power generating and pumping plants
- GB/T 15468Fundamental technical requirements for hydraulic turbines
- GB/T 15469.1-2008Hydraulic turbines, storage pumps and pump-turbines cavitation pitting evaluation -- Part 1: cavitation pitting evaluation in reaction turbines
ISO 7919 · IEC 60994
How to Download GB/Z 32583-2016
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 11348.5-2008 — Mechanical vibration evaluation of machine vibration by measurements on rotating shafts -- Part 5: Machine sets in hydraulic power generating and pumping plants
GB/T 15468-2020 — Fundamental technical requirements for hydraulic turbines
GB/T 15469.1-2008 — Hydraulic turbines, storage pumps and pump-turbines cavitation pitting evaluation -- Part 1: cavitation pitting evaluation in reaction turbines
Secure payment via Stripe
Payments accepted
GB/Z 32583-2016
$145.00