Valid

GB 17621-1998Specification of reservoir operation for large and medium-scale hydropower stations (English PDF)

大中型水电站水库调度规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (10 pages)

Need quotation for your management?

Get a formal quotation for GB 17621-1998 in 30 minutes.

Issued by

State Administration of Quality and Technical Supervision

Level / Type

National · Mandatory

Issue date

December 17, 1998

Implementation date

April 1, 1999

Scope

GB 17621-1998 is the English-translated version of 大中型水电站水库调度规范.

GB 17621-1998 specifies the principles, tasks, methods, external conditions and scientific management requirements for the operation of the reservoirs of large and medium-scale hydropower stations; other reservoirs may use it for reference.

Its general principles require operation within the tasks, parameters and indicators fixed by the approved design, with the safety of the hydro project first, obedience to unified grid dispatching and to the flood control headquarters above the flood-season limited water level, and a recheck of the operating parameters every 5 to 10 years.

It lists the basic data to be kept (storage capacity, design flood, runoff, discharge, unit characteristic and tailwater curves) and the requirements for hydrological and meteorological station networks, telemetry and forecasting.

The flood operation clause sets the principles and responsibilities, the annual flood operation plan, the criteria for switching to dam-protection operation, forecast-based pre-release and peak-staggering operation, emergency schemes for floods above the check flood, sediment and ice-flood operation; the beneficial operation clause covers power generation plans based on 70% to 75% guarantee-rate inflow, reservoir operation charts, multi-year regulation limits and water-saving measures, followed by clauses on management of the reservoir area and downstream channel and of reservoir operation.

It was issued on 17 December 1998 by the State Administration of Quality and Technical Supervision and has been in force since 1 April 1999. Classification: ICS 27.140, CCS P59. The document runs to 10 pages, delivered complete in English translation.

Found what you need?

Document preview — GB 17621-1998

National Standard of the People's Republic of China

ICS
27.140
Classification
P59

Issued by: State Administration of Quality and Technical Supervision

Contents

  • Foreword
  • 1 Scope
  • 2 General principles
  • 3 Reservoir operation parameters and basic data
  • 4 Hydrological and meteorological information and forecasting
  • 5 Flood regulation
  • 6 Regulation for power generation and other beneficial uses
  • 7 Management of the reservoir area and the downstream channel
  • 8 Management of the reservoir regulation

3 Reservoir operation parameters and basic data

4 Hydrological and meteorological information and forecasting

5 Flood regulation

6 Regulation for power generation and other beneficial uses

7 Management of the reservoir area and the downstream channel

8 Management of the reservoir regulation

Foreword

This standard has been drawn up in accordance with the arrangements of the 1996 national standards plan of the State Bureau of Technical Supervision (Document Jijianju Biaofa [1996] No. 32), in order to carry out reservoir operation scientifically, rationally and economically, to ensure the safety of the hydro project, to bring the benefits of comprehensive utilization fully into play, to raise the level of reservoir operation management, and to make reservoir operation standardized, institutionalized and scientific.

This standard specifies the principles, tasks, methods, external conditions and scientific management requirements for the operation of large and medium-scale hydropower station reservoirs.

This standard is based on the Electric Power Law of the People's Republic of China, the Water Law of the People's Republic of China, the Flood Control Law of the People's Republic of China, the Flood Control Regulations of the People's Republic of China and the Regulations of the People's Republic of China on the Administration of Power Grid Dispatching. It draws on the operating rules, systems and related standards and codes for large and medium-scale reservoirs of the electric power, water resources and other departments, incorporates the main experience and lessons of the operation of large and medium-scale hydropower station reservoirs since the founding of the People's Republic, and widely solicited the opinions of experts and scholars from operating, design, research and academic institutions; it was discussed and revised several times and passed review.

This standard was proposed by the Ministry of Electric Power Industry.

This standard is under the technical responsibility of the National Electric Power Dispatching and Communication Centre.

The main drafting organization of this standard is the National Electric Power Dispatching and Communication Centre; participating organizations: Central China Electric Power Administration, Dispatching and Communication Bureau of the Northwest China Electric Power Administration, Gansu Provincial Electric Power Industry Bureau.

Main drafters of this standard: Ren Zhaohong, Yin Wenyan, Pu Run, Zhu Jiaoxin, Tang Yong.

The National Electric Power Dispatching and Communication Centre is responsible for the interpretation of this standard.

Approved by the State Bureau of Quality and Technical Supervision on 1998-12-17; implemented from 1999-04-01.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 10 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB 17621-1998

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
10 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 17621-1998

$135.00