Valid

GB/T 40221-2021Specification for economic operation system of smart hydropower plant (English PDF)

智能水电厂经济运行系统技术条件

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 40221-2021 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

May 21, 2021

Implementation date

December 1, 2021

Scope

GB/T 40221-2021 is the English-translated version of 智能水电厂经济运行系统技术条件.

GB/T 40221-2021 sets the technical requirements for the economic operation system of a smart hydropower plant, the set of application components that runs on the plant's integrated management and control platform to make better use of the water available for generation.

It covers hydrological forecasting, the preparation of operation plans, economic dispatch control and operation evaluation, together with the acceptance of the system.

The basic requirements deal with the overall functions, interfaces and deployment defined in GB/T 40222-2021, network security to GB/T 36572, the management of basic data and operating parameters, deployment in the production control area and a shared library of economic operation models and algorithms.

It applies to smart hydropower plants and is used by plant owners, system suppliers and dispatch operators. It was issued on 21 May 2021 and has applied since 1 December 2021.

Found what you need?

Document preview — GB/T 40221-2021

National Standard of the People's Republic of China

ICS
27.100
Classification
F 23

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Basic requirements
  • 5 Hydrological forecast
  • 6 Operation plan
  • 7 Economic dispatch control
  • 8 Operation evaluation
  • 9 Acceptance
  • Appendix A (informative) Basic data
  • Appendix B (Informative) Economic Operation System Data Flow

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.

1 Scope

This document specifies the hydrological forecast, operation plan, economic dispatch control and operation evaluation functions of the economic operation system of the smart hydropower plant. Acceptance requirements.

This document applies to smart hydropower plants.

2 Normative references

The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.

GB 17621 Reservoir operation specification for large and medium-sized hydropower stations

GB/T 22482 Hydrological Information Forecast Specification

GB/T 36572 Electric Power Monitoring System Network Security Protection Guidelines

GB/T 40222-2021 Technical Guidelines for Smart Hydropower Plants

DL/T 316 Power grid water dispatching automation function specification

DL/T 1666 Technical conditions for water dispatching automation system of hydropower station

DL/T 1802 Technical Specification for Automatic Power Generation Control and Automatic Voltage Control System of Hydropower Plant

NB/T 35001 Cascade Hydropower Station Water Dispatching Automation System Design Specification

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Economic operation system of smart hydropower plant

Based on the integrated management and control platform of smart hydropower plants, the goal is to improve the utilization rate of hydropower in hydropower plants, and achieve coordinated and unified hydrological forecasting and power generation.

A collection of application components for power planning, economic dispatch control, and operation evaluation.

4 Basic requirements

4.1 The overall functions, external interfaces, and deployment methods of the system should meet the requirements of GB/T 40222-2021.

4.2 The system network communication should meet the requirements of GB/T 36572.

4.3 The system should have the management function of basic data related to economic operation. See Appendix A for the content of basic data.

4.4 Economic operating parameters, operating constraints and operating strategies should achieve unified configuration and management, and support automatic synchronization between different partitions.

4.5 The system should be deployed in the production control area, and be able to run on the integrated management and control platform in the form of components, and be implemented through the integrated management and control platform. The acquisition of external system data, the storage and sharing of calculation results. See Appendix B for the data flow.

4.6 The system should have components for hydrological forecasting, operation planning, economic dispatch control, and operation evaluation. The functions of the components should be configurable and updateable.

4.7 It is advisable to realize a unified economic operation model and algorithm library, and realize management of computing services and expansion and upgrading through an integrated management and control platform.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 40221-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 40221-2021