Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China

Level / Type

National · Mandatory

Issue date

October 9, 2015

Implementation date

July 1, 2016

Scope

GB 8031-2015 is the English-translated version of 工业电雷管.

GB 8031-2015 is the Chinese national standard on industrial electric blasting cap, in the field of chemical technology. It carries no /T suffix, which in the Chinese system means compliance is mandatory: a product or a practice within its scope has to meet it to be lawfully made, sold or carried out in China. It was issued on 9 October 2015 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China, and has been in force since 1 July 2016. Classification: ICS 71.100.30, CCS G89. This page is published from the official record of the standard held by the Chinese standards administration: the identification, the dates, the classification and the issuing body are taken from there. The clause text, the tables and the numeric limits are in the document itself, which is delivered complete in English translation.

Document preview — GB 8031-2015

National Standard of the People's Republic of China

ICS
71.100.30
Classification
G89

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 3.5 Electrostatic Sensitivity a/kV >=8 >=10 >=12 >= 25
  • 4 Classification and Nomenclature
  • 5 Requirements
  • 5.0 SERIES INITIATION current/A <=1.2 <=1.5 <=3.5 <=
  • 5.1 Appearance
  • 5.6 Performance
  • 5.6.1 Full resistance
  • 6 Test methods
  • 6.4.2 Insulation thinnest point thickness. Press 18014-2008 in
  • 6.10 Electrostatic Sensitivity
  • 6.11 Seismic Performance The method will be defined by the level of
  • 6.12 Initiating Capacity
  • 6.17 Invert the initial capacity 20 - - 5.6.10 6.18 - - - -
  • 7 Full resistance sqrt 5.6.1 6.5 sqrt 5.6.1 6.5
  • 7.2 Test Project
  • 19 Delay Time sqrt - 5.6.9 6.17 sqrt - 5.6.9

Foreword

This standard 5.1.1,5.2,5.4,5.5,5.6.3,5.6.4,5.6.6,5.6.7,5.6.8,

5.6.9 in 2 ms series, 8.1.2.1,8.1.3, 8.2, some indicators in Table 2 (maximum current is not angry, electrostatic sensitivity) are mandatory, the rest are recommended. This standard GB/T 1.1-2009 given rule drafting. This standard replaces GB 8031-2005 "Industrial electric detonators" and GB/T 16625-1996 "seismic exploration electric detonators." This standard and GB 8031-2005 and GB/T 16625-1996 compared to the main changes are as follows:

--- Modify the classification of industrial electric detonator (see 4.1, GB 8031-2005 of Chapter 4);

--- Modification on foot line requirements, increasing the "insulation thickness of the thinnest point" and "anti-high voltage breakdown performance" requirements (see 5.1.2,

5.4.2 And 5.4.3, GB 8031-2005 5.2);

--- Revised industrial electric detonator material requirements (see 5.5, GB 8031-2005 5.3);

--- Modify the whole industrial electric detonators resistance requirements (see 5.6.1, GB 8031-2005

5.4.1 and GB/T 16625-1996 Table 1);

--- To the maximum safe current will not firing current, revised seismic exploration electric detonators misfire maximum current (see 5.6.2,

5.4.3 GB 8031-2005 and GB/T 16625-1996 Table 1);

--- Ability to detonate the perforation diameter makes specific requirements (see 5.6.4, GB 8031-2005

5.4.8 and the GB/T 16625-1996 Table 1);

--- Modify the water resistance index of industrial electric detonator (see

5.6.6.1 and 5.6.6.2, GB 8031-2005 and the

1 Scope

GB 8031-2015 is the Chinese national standard on industrial electric blasting cap, in the field of chemical technology. It carries no /T suffix, which in the Chinese system means compliance is mandatory: a product or a practice within its scope has to meet it to be lawfully made, sold or carried out in China. It was issued on 9 October 2015 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China, and has been in force since 1 July 2016. Classification: ICS 71.100.30, CCS G89. This page is published from the official record of the standard held by the Chinese standards administration: the identification, the dates, the classification and the issuing body are taken from there. The clause text, the tables and the numeric limits are in the document itself, which is delivered complete in English translation.

This standard specifies the electrical detonator industrial classification and nomenclature, requirements, test methods, inspection rules and signs, packaging, transportation, storage and so on. This standard applies to industrial electric detonators.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

GB 190 packaging and marking of dangerous goods

GB/T 191 Packaging - Pictorial signs

GB/T 2828.1 Sampling procedures - Part 1. batch inspection sampling plan according to accepted quality limit (AQL) retrieval

GB/T 2829 periodic inspection Sampling procedures and tables (suitable for process stability test) Analyzing and processing GB /statistical processing and interpretation of normal sample values T 4883-1985 data

GB/T 6378 percent nonconforming sampling inspection procedures and charts (Apply to inspection of successive lots)

GB/T 8170 repair value expressed about the rules and limit values and judgment

GB 9969 Industrial Products General Instructions

GB/T 13225 Industrial detonator delay time measuring method

GB/T 13226 Test method for industrial detonator grid

GB/T 13227 Industrial detonator immersion test method

GB/T 14436 General industrial products assurance documents

GB/T 14659 civilian blasting equipment terminology, symbols

GB/T 18014-2008 electric detonators PVC insulated wire Electric detonators flammable gas safety test method

3 Terms and Definitions

Terms and definitions GB/T 14659 apply to this document defined.

3.5 Electrostatic Sensitivity a/kV >=8 >=10 >=12 >= 25

Note. The table in bold mandatory elements. a static sensitivity expressed in feet between the line and the envelope electrostatic withstand voltage.

5.6.3 Seismic Performance After the vibration test, industrial electric detonators should not explode, structural damage, short circuit, open circuit and resistor unstable phenomenon, the whole resistance should meet

5.6.1 requirements.

5.6.4 Initiating Capacity No. 6 industrial electric detonator shall ripped through 4mm thick sheet of lead No. 8 industrial electric detonator shall ripped through 5mm thick sheet of lead perforation diameter should be not less than 7mm.

5.6.5 tensile properties Loss not lower than 19.6N static pull effect lasted 1min, closures and feet line of industrial electric detonators should not occur visual evidence Or bad move, remove the ignition test done, it should explode completely.

5.6.6 water resistance

5.6.6.1 ordinary electric detonators and electric detonators Mine Xu was immersed in water to maintain pressure 0.05MPa 4h, after removing the test do get angry, should burst Fried completely.

5.6.6.2 seismic exploration electric detonator was immersed in water pressure of 0.3MPa maintained 72h, after removing the ignition test done, it should explode completely.

5.6.7 heat resistance 4h kept not lower than 100 °C environment, industrial electric detonators should not explode.

5.6.8 flammable gas safety Permitted Electric Detonator detonate when the coal mine at a concentration of 9% of the combustible gas, the gas can not ignite.

5.6.9 Delay Time Extended electric detonator in the name of an extension of time should generally be in line with the requirements of Table 3, the delay time can be negotiated other series with the user. Table 3 in the name of an extension of time series

ms Series 2 ms ms

ms The first series of 4 ms ms 1/4 second series Half a second series Second series 100 12.5 00 12.5 00 12.5 00 0.6 00 0.25 00 0.125 00 0.50 2 25 25 12.6 37.5 25 12.6 37.5 12.637.5 0.6 1.5 1 0.250.126 0.375 0.50 0.26 0.75 1.00 0.51 1.50 350 50 37.6 62.5 37.662.5 37.6 62.5 50 2 1.6 2.5 1.00 0.76 1.25 2.00 0.625 0.500.376 1.51 2.50 475 75 62.6 92.5 62.687.5 62.6 87.5 75 3 2.6 3.5 1.50 1.26 1.75 3.00 0.875 0.750.626 2.51 3.50 5110 92.6 130.0 112.5 87.6 4 3.6 4.5 10087.6112.4100 1.000.876 1.125 2.00 1.76 2.25 4.00 3.51 4.50 6150 130.1 175.0 - - - 125,112.6 137.5 5 4.6 5.5 2.50 2.26 1.375 1.251.126 2.75 5.00 4.51 5.50 7200 175.1 225.0 - - - 150,137.6 162.5 6 5.6 6.5 3.00 2.76 3.25 6.00 1.625 1.501.376 5.51 6.50 8250 225.1 280.0 - - - 175,162.6 187.5 7 6.6 7.5 - - - 3.50 3.26 3.75 7.00 6.51 7.50 9310 280.1 345.0 - - - 200,187.6 212.5 - - - - - - 4.00 3.76 4.25 8.00 7.51 8.50 10380 345.1 420.0 - - - 225,212.6 237.5 - - - - - - 4.50 4.26 4.74 9.00 8.51 9.50 11 460 420.1 505.0 - - - 250237.6 262.5 - - - - - - - - - 10.009.5110.49 12550 505.1 600.0 - - - 287.5 275262.6 - - - - - - - - - - - - 13650 600.1 705.0 - - - 300,287.6 312.5 - - - - - - - - - - - - 14760 705.1 820.0 - - - 337.5 325312.6 - - - - - - - - - - - - 15880 820.1 950.0 - - - 362.5 350337.6 - - - - - - - - - - - - 161020 1110.0 950.1 - - - 387.5 375362.6 - - - - - - - - - - - - 12001110.11300.0 17 - - - 400387.6 412.5 - - - - - - - - - - - - 14001300.11550.0 18 - - - 425412.6 437.5 - - - - - - - - - - - - 17001550.11850.0 19 - - - 450437.6 462.5 - - - - - - - - - - - - 20001850.12149.9 20 - - - 475462.6 487.5 - - - - - - - - - - - - 21 - - - - - - 500487.6 512.4 - - - - - - - - - - - -

Note 1. Table 2 ms series Coal Mine Permissible MS Delay time by electric detonators, the series is mandatory.

4 Classification and Nomenclature

4.1 Classification of industrial electric detonators Industrial electric detonator use is divided into.

a) Ordinary electric detonator;

b) Permitted Electric Detonator coal mine;

c) seismic exploration electric detonators.

4.2 Industrial electric detonator named Industrial electric detonator shall be named in line with WJ/T 9031 requirements.

5.1 Appearance

5.1.1 The surface should not have floating medicine, rust, blisters, cracking, incomplete.

5.1.2 Permitted Electric Detonator Mine foot line should be composed of two different colors of insulated wire composition, there should be no wire insulation be damaged and the core wire corrosion.

5.2 Coding Industrial electric detonator coding shall comply with the requirements of GA441. Do not mark paragraph

5.3 Each hair extension electric detonators other segments should be clearly marked area. Coal Mine Permissible extension of electric detonators using foot line segment color area when not, should adopt The colors used are shown in Table 1. Table

1 Coal Mine Permissible extension of electric detonators paragraphs foot line color Block number 12345 Foot line color gray, red gray, yellow gray, blue, green, white, red

5.4.1 length tolerance should be ± 5% of the nominal value.

5.4.2 Insulation thinnest point thickness. PVC material shall not be less than 0.3mm; other materials should not be less than 0.25mm.

5.4.3 anti-high-voltage breakdown properties. pass to (5000 ± 50) V AC voltage, continuous 60s, to the leakage current value divided into. insulation class a Level not higher than 0.1mA/m; insulation class II is not higher than 1.2mA/m.

5.5 Material Industrial electric detonator should not use paper envelope; Permitted Electric Detonator coal mine should not use aluminum and its alloys parts.

5.6.1 Full resistance

5.6.1.1 When the whole industrial electric detonators resistance less than or equal to 3Omega, relative error should be less than the nominal value ± 25%.

5.6.1.2 When the whole is greater than the resistance 3Omega, relative error should be less than the nominal value ± 15%.

5.6.2 Electrical Properties Electrical performance of industrial electric detonator shall comply with the requirements of Table 2. Table

2 Industrial electric detonator electrical performance project Technical Specifications Ordinary electric detonator, electric detonator Xu Mine Type of Type I II III Seismic exploration electric detonators The maximum non-firing current/A >=0.20 >=0.30 >=0.80 >=

0.20 The minimum firing current/A <=0.45 <=1.00 <=2.50 <=

0.45 Combustion can punch/(A2 · ms) >=2.0 <=18.0 80.0 ~ 140.0 0.8 ~

6 Test methods

6.1 Appearance Visual inspection.

6.2 Coding Visual inspection. Allows encoding test and visual inspection merger.

6.3 Do not sign Visual inspection. Do not allow the paragraph mark inspection and visual inspection merger.

6.4.1 Length. 1mm by dividing the value of the ruler to measure.

6.4.2 Insulation thinnest point thickness. Press 18014-2008 in

6.1.2 with GB/T performed. Each of the three foot line measurement, measurement point spacing Not less than 300mm, the arithmetic average of two foot line measured values as a measurement result.

6.4.3 anti-high-voltage breakdown properties. Cut foot detonator cord, which is wound into a spiral into a beaker containing 3% sodium chloride aqueous solution, the pass In (5000 ± 50) V AC voltage, continuous 60s, measured leakage current value, and in terms of leakage current per unit length to mA/m.

6.5 Full resistance With a resolution of not less than 0.1Omega, measuring current less than 30mA of resistance measuring instrument and the sample foot cable connected in the resistance measuring instrument Read the value on the work of state resistance and resistance measuring instrument recording.

6.6 Maximum current misfire Through the sample to meet the requirements of Table 2 of constant DC current (with a resolution of no less than the current measuring instrument measuring 0.01A), continued 5min, observe whether the sample explosion, and record the test results. Allow the test sample after the series.

6.7 The minimum firing current Conducted in accordance with WJ/T 9044's.

6.8 Combustion can punch Conducted in accordance with WJ/T 9039's.

6.9 Initiating current series Connect the 20 rounds of the sample series, through a constant DC current requirements in accordance with Table 2 (with a resolution of not less than 0.05A current measuring instrument Measurement), the duration of not less than 20ms, to observe whether the sample explosive, and record the test results.

6.10 Electrostatic Sensitivity

6.10.1 ordinary electric detonators and electric detonators Coal Mine permissible according to the provisions WJ/T 9042's. Wherein. the role of discharge from the capacitor capacity 2000pF, series resistance 0kOmega.

6.10.2 electric detonators geological exploration conducted in accordance with WJ/T 9042's. Wherein. the role of discharge from the capacitance of the capacitor is 500pF, string Union resistance is 5kOmega.

6.11 Seismic Performance The method will be defined by the level of

6.5 full inspection WJ231 resistance sample into line with the requirements, the cam speed is 60r/min ± 1r/min, drop height 150mm ± 2mm wooden central vibration test machine, the vibration test machine wooden plugged the gap, pressed cover, Continuous vibration 10min, remove the sample checked by the method

6.5 full resistance of the sample, read and record the value.

6.12 Initiating Capacity

6.12.1 according to the provisions of GB/T 13226 were;

6.12.2 allows the use of other test methods;

6.12.3 allows initiating the series of current and deferred time trial merger.

6.13 Tensile Properties Applying a corresponding pair of lines between the sample housing and reverse foot line static tension, sustained 1min, remove the sample visual inspection and test records result.

6.14 water resistance Conducted in accordance with GB/T 13227 of.

6.15 heat resistance Conducted in accordance with WJ/T 9043.1 of.

6.16 flammable gas safety Conducted according to the provisions of GB 18096.

6.17 Delay Time According to the provisions of GB/T 13225 conducted, wherein. time meter resolution is not less than 0.1ms; detonating current (constant DC current) I type is 1.2A; II type is 1.5A; III type is 3.5A. Extended time measurement Supplementary Regulations Appendix A.

6.18 inverted initiation capability The horizontal grid within the grid holder, the sample was fixed to an explosion inside the detonator holder, and make it perpendicular to the lower inverted grid side Central location, close to the bottom of the grid (see Appendix B), will be connected to the foot line of the sample and detonating wires, through to meet the requirements of Table 2. The constant straight Current flow, after initiation, detection stereotype perforation diameter, and record the test results.

6.17 Invert the initial capacity 20 - - 5.6.10 6.18 - - - -

Note. "sqrt" indicates will review the project, "-" indicates no items seized.

7.2.2 Type inspection Industrial electric detonator type inspection items are shown in Table 5. Table

5 Industrial electric detonator type inspection items No. Project General electric detonators and electric detonators Mine Xu seismic exploration electric detonators Test items required Reg number Testing Methods Reg number Test items required Reg number Testing Methods Reg number

7 Full resistance sqrt 5.6.1 6.5 sqrt 5.6.1 6.5

8 Maximum misfire current sqrt 5.6.2 6.6 sqrt 5.6.2 6.6 9 minimum firing current sqrt 5.6.2 6.7 sqrt 5.6.2 6.7 10 angry red can sqrt 5.6.2 6.8 sqrt 5.6.2 6.8 11 SERIES INITIATION current sqrt 5.6.2 6.9 sqrt 5.6.2 6.9 12 electrostatic sensitivity sqrt 5.6.2 6.10 sqrt 5.6.2 6.10 13 seismic performance sqrt 5.6.3 6.11 sqrt 5.6.3 6.11

14 Initiating Capacity sqrt 5.6.4 6.12 sqrt 5.6.4 6.12 15 tensile properties sqrt 5.6.5 6.13 sqrt 5.6.5 6.13 16 water resistance sqrt 5.6.6 6.14 sqrt 5.6.6 6.14 17 heat resistance sqrt 5.6.7 6.15 - - - 18 flammable gas safety sqrt 5.6.8 6.16 - - -

19 Delay Time...

7.2 Test Project

7.2.1 factory inspection Industrial electric detonator factory inspection items are shown in Table 4. Table

4 Industrial electric detonator factory inspection items Test item number General electric detonators and electric detonators Mine Xu seismic exploration electric detonators Batch test cycle test required Reg number Testing method The reg number Batch test cycle test required Reg number Testing method The reg number

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 47 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB 8031

EditionTitleRevisionStatus
GB 8031-2015Industrial electric blasting capcurrent editionCurrent
GB 8031-2005Industrial electric detonatorprevious editionSuperseded
GB/T 16625-1996Seismograph electric blasting capmerged into this editionSuperseded

This page sells the current edition, GB 8031-2015. Earlier editions are listed for reference only.

How to Buy GB 8031-2015

  1. 1Add to cart. Click the "Buy GB 8031-2015" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
47 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 8031-2015

$420.00

$355.00for partners