GB/T 46373-2025Technical requirements for connecting compressed air energy storage station to power grid (English PDF)
压缩空气储能电站接入电网技术规定
Open the GB/T 46373-2025 preview as PDF
This is a limited preview
Buy now to download the full PDF (11 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 31, 2025
Implementation date
May 1, 2026
Scope
GB/T 46373-2025 is the English-translated version of 压缩空气储能电站接入电网技术规定.
GB/T 46373-2025 is the Chinese national standard covering connecting a CAES plant to the network - the active and reactive power capability in both charge and discharge, the ramp rates and the response to dispatch, the fault ride-through and the protection, and the metering and communication with the control centre. First edition, under the China Electricity Council, and it belongs with the saline aquifer siting standard GB/T 46545.1-2025. In force from 1 May 2026. Issued on 31 October 2025, it has been in force since 1 May 2026.
Document preview — GB/T 46373-2025
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F 19
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1.Scope1
- 2 Normative References1
- 3.Terms and Definitions1
- 4.General Requirements2
- 5 Power Control2
- 6.Primary frequency modulation3
- 7.Operational adaptability3
- 8 Power Quality4
- 9.Relay protection and automatic safety devices4
- 10 Scheduling Automation and Communication5
- 11 Simulation Model and Parameters5
- 6 References7
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part
1.Structure and Drafting Rules of Standardization Documents". Drafting. Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents. This document was proposed by the China Electricity Council. This document is under the jurisdiction of the National Technical Committee on Standardization of Power Storage (SAC/TC550). This document was drafted by: State Grid Jiangsu Electric Power Research Institute, State Grid Jiangsu Electric Power Company, and China Power. Scientific Research Institute Co., Ltd., Institute of Engineering Thermophysics, Chinese Academy of Sciences, Tsinghua University, Jiangsu Fangtian Electric Power Technology Co., Ltd., China Yangtze River Three Gorges Corporation, China Energy Engineering Group Corporation Engineering Research Institute, State Grid Shandong Electric Power Research Institute State Grid Hubei Electric Power Research Institute and China Storage & Energy (Beijing) Technology Co., Ltd. The main drafters of this document are. Yuan Yubo, Kong Xiangping, Zhou Qi, Mei Shengwei, Sheng Yong, Yang Cenyu, Chen Yong'an, Hu Juan, Xie Ningning, and Shi Mingming. Du Yunlong, Yang Hongyu, Liu Dan, Zhu Lingkai, Luo Fei, Li Jiahui, Zhou Jianhua, Chang Yong, Chen Laijun, Xiong Ping, Gu Wen, Zhao Dongdong, Gong Zhiqiang, Liu Xiaotong Xu Zhiqiang, Zhang Xuehui, and Shang Xingyu. Technical Regulations for Connecting Compressed Air Energy Storage Power Stations to the Power Grid
1 Scope
GB/T 46373-2025 is the Chinese national standard covering connecting a CAES plant to the network - the active and reactive power capability in both charge and discharge, the ramp rates and the response to dispatch, the fault ride-through and the protection, and the metering and communication with the control centre. First edition, under the China Electricity Council, and it belongs with the saline aquifer siting standard GB/T 46545.1-2025. In force from 1 May 2026. Issued on 31 October 2025, it has been in force since 1 May 2026.
This document specifies the general requirements for the grid connection of compressed air energy storage power stations, as well as power control, primary frequency regulation, operational adaptability, and power consumption. Technologies related to quality, relay protection and safety automatic devices, dispatch automation and communication, simulation models and parameters, grid connection testing and evaluation, etc. Require. This document applies to newly built, renovated, and expanded compressed air energy storage systems connected to the public power grid at voltage levels of 10(6)kV and above. Construction, operation, maintenance and overhaul of power plants.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included. For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies. This document.
GB/T 7409.1 Excitation system for synchronous motors - Part
3 Terms and Definitions
The terms and definitions defined in GB/T 43687, GB/T 40595 and DL/T 2528, as well as the following terms and definitions, apply to this document.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 7409.2Excitation systems for synchronous machines—Part 2: Models for power system studies
- GB/T 12325Power quality - Deviation of supply voltage
- GB/T 12326Power quality - Voltage fluctuation and flicker
- GB/T 14285Technical code for relaying protection and security automatic equipment
- GB/T 14549Quality of electric energy supply--Harmonics inpublic supply network
- GB/T 15543Power quality - Three-phase voltage unbalance
GB/T 7409.1 · GB/T 7409.3 · GB/T 50063
Editions of GB/T 46373
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 46373-2025 | Technical requirements for connecting compressed air energy storage station to power grid | current edition | Current |
This page sells the current edition, GB/T 46373-2025. Earlier editions are listed for reference only.
How to Buy GB/T 46373-2025
- 1Add to cart. Click the "Buy GB/T 46373-2025" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 38755-2019 — Code on security and stability for power system
GB/T 12325-2008 — Power quality - Deviation of supply voltage
GB/T 12326-2008 — Power quality - Voltage fluctuation and flicker