Scope
GB/T 40614-2021 is the English-translated version of 光热发电站性能评估技术要求.
GB/T 40614-2021 sets out how the performance of a solar thermal power plant is evaluated, system by system and for the plant as a whole. It applies to tower-type, trough-type and linear Fresnel plants.
For the collector system, the thermal storage and exchange system and the generating system it lists the quality inspection of equipment and documents and the performance indicators to report, such as the efficiency of the collection field, the thermal energy storage hours, the temperature drop of a full storage over 24 h, the annual operating hours and the mean time between failures.
An annex gives the method for calculating the collection field efficiency, and others cover the basic plant information and the evaluation record. It was issued on 11 October 2021 and has applied since 1 May 2022.
Found what you need?
Document preview — GB/T 40614-2021
National Standard of the People's Republic of China
- ICS
- 27.160
- Classification
- F 12
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative References4
- 3 Terms and Definitions4
- 4 Overall Requirements6
- 5 Performance Evaluation of Collector System7
- 6 Performance Evaluation of Thermal Storage / Exchange System8
- 7 Performance Evaluation of Generating System8
- 8 Overall Performance Evaluation of Power Plant9
- 9 Evaluation Report9
- Appendix A (informative) Basic Information of Solar Thermal Power Plant10
- Appendix B (normative) Efficiency Calculation Method of Collection Field12
- Appendix C (informative) Evaluation Record13
1 Scope
This document specifies the technical requirements for the performance evaluation of the collector system, thermal storage / exchange system and power generating system of solar thermal power plant, and power plant as a whole.
This document is applicable to tower-type, trough-type and linear Fresnel solar thermal power plant.
2 Normative References
Through the normative references in this text, the contents of the following documents constitute indispensable clauses of this document. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document.
GB/T 31464 The Grid Operation Code
3 Terms and Definitions
The following terms and definitions are applicable to this document.
3.1 Solar Thermal Power Plant
Solar thermal power plant refers to a system that converts solar energy into thermal energy and generates electricity through the thermal power conversion process.
NOTE: generally, it includes collector system, thermal storage / exchange system and power generating system.
3.2 Collector System
Collector system refers to a system that gathers and coverts solar energy into thermal energy.
3.3 Thermal Storage System
A system that stores and utilizes the heat output by the collector system.
NOTE: It usually consists of heat storage container, heat storage medium, power system, pressure protection system, auxiliary heater and thermal insulation system.
3.4 Heat Exchange System
Heat exchange system refers to a system that performs heat exchange between a heat transfer medium and other fluids of different temperatures.
3.5 Generating System
Generating system refers to a system that converts thermal energy into electrical energy.
NOTE: generally, it is composed of steam generation system and equipment, steam turbine equipment and system, electrical equipment and system, water treatment equipment and system, etc.
3.6 Efficiency of Collection Field of Point-focus Solar System
Efficiency of collection field of point-focus solar system refers to the ratio of the total energy obtained by the heat transfer medium from the collection field to the total direct normal solar radiation incident on the area of the daylight opening of the collection field in a period of time.
3.7 Annual Efficiency of Solar Thermal Power Plant
Annual efficiency of solar thermal power plant refers to the ratio of the power generation of the solar thermal power plant to the direct normal solar radiation projected on the daylight area of the collection field in a year.
3.8 Temperature-drop when the Storage Level is 100% during Time "24 h"
Temperature-drop when the storage level is 100% during time "24 h" refers to the temperature difference from the initial temperature after 24 h when the hot salt tank in the thermal storage system is full of heat.
NOTE: the unit of the temperature drop when the storage level is 100% during time "24 h" is (°C).
3.9 Thermal Energy Storage Hours
Thermal energy storage hours refer to the hours of operation of the solar thermal generator set at the rated power that can be satisfied by the effective heat released by the thermal storage system.
3.10 Annual Equivalent Utilization Hours
Annual equivalent utilization hours refer to the ratio of the total power generation (MW·h) of the solar thermal power plant to the total rated power (MW) of the electric generator in a year.
3.11 Annual Water Consumption Rate per kW·h
5 Performance Evaluation of Collector System
5.1 Tower-type
5.1.1 Quality inspection
The quality inspection shall include the following content:
a) inspect whether the appearance of heliostats, heat absorbers, valves and pipelines are intact and free of defects;
b) inspect whether the inspection and certification reports and exit-factory certificates of heliostats, heat absorbers and heat transfer media, as well as the system integration and commissioning reports, and acceptance inspection reports are effective and complete.
5.1.2 Performance indicators
The performance indicators shall include: the efficiency of collection field of point-focus solar system, the annual operating hours, the annual failure and outage hours, the number of annual failures and the mean time between failures, etc. The calculation method of the efficiency of collection field of point-focus solar system shall comply with Appendix B.
NOTE: the annual operating hours are calculated in accordance with the working hours of the heat absorber.
5.2 Trough-type
5.2.1 Quality inspection
The quality inspection shall include the following content:
a) inspect whether the appearance of heat collectors, valves and pipelines is intact and free of defects;
b) inspect whether the inspection and certification reports and exit-factory certificates of reflectors, collector tubes, rotary joints, actuators and heat transfer media in the collector system, as well as the system integration and commissioning reports and acceptance inspection reports are effective and complete.
5.2.2 Performance indicators
The performance indicators shall include: the efficiency of collection field of point-focus solar system, the annual operating hours, the annual failure and outage hours, the number of annual failures and the mean time between failures, etc. The calculation method of the efficiency of collection field of point-focus solar system shall comply with Appendix B.
5.3 Linear Fresnel Type
The linear Fresnel type performance evaluation of the collector system of the solar thermal power plant may be carried out in accordance with the requirements of the trough-type performance evaluation of the collector system of the solar thermal power plant.
6 Performance Evaluation of Thermal Storage / Exchange System
6.1 Quality Inspection
The quality inspection shall include the following content:
a) inspect whether the appearance of storage tanks, heat exchangers, valves and pipelines are intact and free of defects;
b) inspect whether the inspection and certification reports and exit-factory certificates of key components of the thermal storage / exchange system, such as: thermal storage media, storage tanks, heat exchangers and valves, as well as the system integration and commissioning reports and acceptance inspection reports are effective and complete.
6.2 Performance Indicators
The performance indicators shall include: the thermal energy storage hours, the temperature drop when the storage level is 100% during time "24 h", the annual wastage of the thermal storage / exchange media, the efficiency of the heat exchanger, the annual operating hours, the annual failure and outage hours, the number of annual failures and the mean time between failures, etc.
7 Performance Evaluation of Generating System
7.1 Quality Inspection
The quality inspection shall include the following content:
a) inspect whether the inspection and certification reports of key equipment and systems, such as: steam turbines and generators, as well as the system integration and commissioning reports, and test and acceptance inspection reports are effective and complete;
b) whether the grid-connected operation of the steam turbine generator set complies with […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 40614-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 31464-2022 — The grid operation code
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
Secure payment via Stripe
Payments accepted
GB/T 40614-2021
$210.00