GB/T 40103-2021Technical requirment of connecting to power system for solar thermal power station (English PDF)
太阳能热发电站接入电力系统技术规定
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 40103-2021 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
May 21, 2021
Implementation date
December 1, 2021
Scope
GB/T 40103-2021 is the English-translated version of 太阳能热发电站接入电力系统技术规定.
GB/T 40103-2021 sets the technical requirements for connecting a solar thermal power station to the power grid. It applies to thermal energy storage stations that generate with steam turbine generator sets.
It covers the prediction of generation capacity over ultra-short, short and mid-term horizons, start-up and shutdown, including cold, warm and hot start-up, active power control with frequency ranges and automatic generation control (AGC) performance, reactive power and voltage regulation, and behaviour under abnormal operating conditions.
It also sets requirements for secondary systems and the signals sent to the grid dispatching institution, for simulation models and parameters, and for grid-involved tests. It was issued on 21 May 2021 and has applied since 1 December 2021.
Found what you need?
Document preview — GB/T 40103-2021
National Standard of the People's Republic of China
- ICS
- 27.160
- Classification
- F 12
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative References4
- 3 Terms and Definitions5
- 4 Prediction of Power Generation Capacity6
- 5 Start-up and Shutdown7
- 6 Active Power Control8
- 7 Reactive / Voltage Regulation9
- 8 Abnormal Operating Conditions10
- 9 Secondary Systems10
- 10 Simulation Models and Parameters12
- 11 Grid-involved Tests13
1 Scope
This Standard specifies the terms and definitions, and the technical requirements for power generation capacity prediction, start-up and shutdown, active power control, reactive / voltage regulation, abnormal operating conditions, secondary systems, simulation models and parameters, and grid-involved tests of connecting to power system for solar thermal power station.
This Standard is applicable to the thermal energy storage type of solar thermal power stations that adopt steam turbine generator set.
2 Normative References
The following documents are indispensable to the application of this document. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document.
GB/T 14285 Technical Code for Relaying Protection and Security Automatic Equipment
GB/T 31464 The Grid Operation Code
GB/T 36572 Guidelines of Cyber Security Protection for Electric Power System Supervision and Control
DL/T 448 Technical Administrative Code of Electric Energy Metering
DL/T 687 General Specification for Preventing Electric Mal-operation System with Computer
DL/T 713 Immunity Requirement for Protection and Control Equipment in 500 kV Substation
Provisions on the Safety Protection of Secondary Power Systems, Order No. 5 of the State Electricity Regulatory Commission, 2005
3 Terms and Definitions
3.8 AGC Response Time
AGC response time refers to the time difference from the moment when the AGC command starts to change, to the moment when the actual load of the generator set starts to change, and the amplitude of variation exceeds the allowable range of the load static deviation, and no longer returns in the trend.
3.9 Cold Start-up
Cold start-up refers to the start-up of the solar thermal generator set when the metal temperature of the regulating stage of the high-pressure inner cylinder of the steam turbine is lower than 40% of the metal temperature at full load.
3.10 Warm Start-up
Warm start-up refers to the start-up of the solar thermal generator set when the metal temperature of the regulating stage of the high-pressure inner cylinder of the steam turbine is between 40% and 80% of the metal temperature at full load.
3.11 Hot Start-up
Hot start-up refers to the start-up of the solar thermal generator set when the metal temperature of the regulating stage of the high-pressure inner cylinder of the steam turbine is higher than 80% of the metal temperature at full load.
4 Prediction of Power Generation Capacity
4.1 The solar thermal power station shall be equipped with the functions of 15 min ~ 4 h ultra-short-term power generation capacity prediction, 0 ~ 72 h short-term power generation capacity prediction and 0 ~ 168 h mid-term power generation capacity prediction.
4.2 The solar thermal power station shall report recommendations on the generation power curve of each generator set from 0 ~ 168 h from 0:00 on the following day on a daily basis in accordance with the time specified by the grid dispatching institution, with a time resolution of 1 h.
4.3 The solar thermal power station shall report recommendations on the generation power curve of each generator set from 0 ~ 72 h from 0:00 on the following day on a daily basis in accordance with the time specified by the grid dispatching institution, with a time resolution of 15 min.
6 Active Power Control
6.1 Regulation Capability
6.1.1 When the system frequency is within the variation range of 50.5 Hz ~ 48.5 Hz, the solar thermal generator set shall maintain stable operation.
6.1.2 When the system frequency drops to 48 Hz, the reduction in active power output of the solar thermal generator set shall not exceed 5% of the rated active power.
6.1.3 The solar thermal generator set shall be equipped with an automatic generation control (AGC) system, as well as the capability of active power regulation and the function of participating in closed-loop automatic power generation control of the power grid.
6.1.4 When the output active power of the solar thermal generator set is above 20% of the rated curve, it shall be able to achieve continuous and smooth regulation of the active power and the function of participating in the active power control of the system.
6.2 Automatic Generation Control
6.2.1 The requirements for the basic performance indexes of automatic generation control of the solar thermal generator set are as follows:
a) The AGC regulation rate shall not be less than 2% of the generator set's rated active power per minute;
b) AGC response time shall not be greater than 60 s;
c) AGC regulation error shall not be greater than 1% of the generator set's rated active power.
6.2.2 The AGC regulation range of the solar thermal generator set shall not be less than 20% ~ 100% of the generator set's rated active power.
6.2.3 The AGC the solar thermal generator set shall have the following two operation modes:
a) Fixed operation mode, in which, the generator set operates in accordance with the planned curve;
b) Regulation mode, in which, the generator set operates in accordance with the given load of the power grid.
6.2.4 The AGC of the solar thermal generator set shall be able to implement the manual and automatic undisturbed switching between the two control modes of "local control / remote control".
8 Abnormal Operating Conditions
The solar thermal generator set shall satisfy the relevant requirements of GB/T 31464 under abnormal operating conditions, such as: abnormal generator frequency, generator out-of-step, loss of magnetism and asynchronization, unbalanced load, misalignment and single-phase reclosing, etc.
9 Secondary Systems
9.1 Basic Requirements
9.1.1 The secondary equipment and secondary systems of the solar thermal power station shall comply with the requirements of GB/T 14285, DL/Z 713 and DL/T 687.
9.1.2 The communication mode, transmission channel and information transmission between the solar thermal power station and the grid dispatching institution shall satisfy the stipulations of the grid dispatching institution, including the provision of remote measurement signals, remote communication signals, remote control signals, remote regulation signals and signals of other security automatic equipment, and the provision of signal modes and real-time requirements, etc.
9.2 Normal Operation Signal
The signals provided by the solar thermal power station to the grid dispatching institution shall at least include the following aspects:
a) The voltage, current, frequency, active power and reactive power of the grid connection point of the solar thermal power station;
b) The active power, reactive power and power generation of each generator set of the solar thermal power station;
c) The location of the circuit breaker and isolating switch at the grid connection point of the solar thermal power station;
d) The tap gear of the main boosting transformer of the solar thermal power station (on-load voltage regulation);
e) Input signal of primary frequency modulation;
f) AGC operating parameters, including the upper and lower limits of AGC adjustment, adjustment rate, and the state signals of "permission of AGC operation by generator set" and "AGC input / exit by generator set", etc.; […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 14285Technical code for relaying protection and security automatic equipment
- GB/T 31464The grid operation code
- GB/T 36572Guidelines of cyber security protection for electric power system supervision and control
- DL/T 448Technical administrative code of electric energy metering
- DL/T 687Technical specification for microcomputer-based electrical misoperation system
- DL/T 713Immunity requirements for protection and control equipment in substations of 500kV and above
Similar standards
How to Download GB/T 40103-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 448-2016 — Technical administrative code of electric energy metering
DL/T 687-2024 — Technical specification for microcomputer-based electrical misoperation system
DL/T 713-2025 — Immunity requirements for protection and control equipment in substations of 500kV and above
Secure payment via Stripe
Payments accepted
GB/T 40103-2021
$150.00