GB/T 31366-2015Technical requirements for monitoring and control system of photovoltaic power station (English PDF)
光伏发电站监控系统技术要求
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 31366-2015 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
February 4, 2015
Implementation date
September 1, 2015
Scope
GB/T 31366-2015 is the English-translated version of 光伏发电站监控系统技术要求.
GB/T 31366-2015 is the Chinese standard "Technical requirements for monitoring and control system of photovoltaic power station".
Its scope clause reads: This standard specifies the structure and configuration of grid-connected photovoltaic power plant monitoring system, system functionality, performance, working conditions and other technologies Claim.
This standard applies to 35kV and above voltage level through the grid, and connected via 10kV voltage level and a new public grid Construction, renovation and expansion of photovoltaic power plants. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 31366-2015
National Standard of the People's Republic of China
- ICS
- 27.160
- Classification
- F 12
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 General
- 5 System structure and configuration
- 6 System features
- 7 Performance
- 8 7 working conditions
- Appendix A (informative) PV power plant control system configuration diagram of a typical communication
- Annex B (informative) photovoltaic cells typical communication structure
- Annex C (informative) spacer collect basic information table
1 Scope
This standard specifies the structure and configuration of grid-connected photovoltaic power plant monitoring system, system functionality, performance, working conditions and other technologies
Claim.
This standard applies to 35kV and above voltage level through the grid, and connected via 10kV voltage level and a new public grid
Construction, renovation and expansion of photovoltaic power plants.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 13729 remote terminal device
DL/T 634.5104 Telecontrol equipment and systems - Part 5-104. Transmission protocols using standard transmission protocol subset IEC 60870-
5-101 Network Access
DL/T 860 (all parts) substation communication networks and systems
DL/T 5149-2001 220 ~ 500kV substation computer monitoring system design technical regulations
Secondary power system security protection regulations (State Electricity Regulatory Commission Order No. 5, 2005)
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Photovoltaic power station photovoltaic (PV)
In photovoltaic systems, involving all types of construction (structures) and repair, maintenance, power stations and other auxiliary facilities, including a living.
3.2 Photovoltaic power generation unit PVpowerunit
Photovoltaic power plant, with a number of PV module strings via the DC combiner box collection, the inverter and the inverter transformer isolated boost
Boost to conform to grid frequency and voltage requirements of the power supply. Also known as the power unit module.
3.3 And outlets pointofinterconnectionofPVpowerstation
For booster station photovoltaic power plants, booster station refers to the high-pressure side of the bus or node. For no booster station photovoltaic power stations, photovoltaic means
Output summing point plant.
3.4 Monitoring system
The use of computer production process real-time monitoring and control system.
3.5 Spacer layer baylevel
By the (smart) I/O unit, a control unit which controls the network and protect the interface machine and the like, for in situ measurement control unit device layer.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Cited by
- GB/T 43056-2023Technical requirements for photovoltaic power station in desert areas
- GB/T 41235-2022Specification for interaction between internet of energy and energy storage system
- GB/T 40289-2021Technical requirement of power control system for photovoltaic power station
- NB/T 10128-2019Code for Electrical Design of Photovoltaic Power Projects
- GB/T 33599-2017Specification of Operation and Control for Photovoltaic Power Station
Similar standards
How to Download GB/T 31366-2015
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 31366-2015
$240.00