GB/T 33599-2017Specification of Operation and Control for Photovoltaic Power Station (English PDF)

光伏发电站并网运行控制规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (7 pages)

Need quotation for your management?

Get a formal quotation for GB/T 33599-2017 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Level / Type

National · Recommended

Issue date

May 12, 2017

Implementation date

December 1, 2017

Scope

GB/T 33599-2017 is the English-translated version of 光伏发电站并网运行控制规范.

GB/T 33599-2017 is the Chinese standard "Specification of Operation and Control for Photovoltaic Power Station".

Its scope clause reads: This Standard specifies the basic specifications of operation and control for photovoltaic power stations, as well as the requirements for operation management, power forecasting, power generation plan, active power control, reactive power control, relaying protection and automatic safety device operation, electric power communication operation, dispatching automation, equipment overhaul and accident recording and reporting.

This Standard applies to newly-built, rebuilt and extended photovoltaic power stations which are connected to the grid through the voltage class of 35 kV and above, and connected to the public grid through the voltage class of 10 kV.

Its clauses include application scope; terms and definitions; h ~ 24 h of the next day at the times specified by the grid dispatcher every day, the; min ~ 4 h in the future to the grid dispatcher every 15 min, the time resolution of the.

It was issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China on 2017-05-12 and took effect on 2017-12-01.

Found what you need?

Document preview — GB/T 33599-2017

National Standard of the People's Republic of China

ICS
27.160
Classification
F 12

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Contents

  • Foreword...3
  • 1 Application Scope...4
  • 2 Normative References...4
  • 3 Terms and Definitions...5
  • 4 Basic Requirements...6
  • 5 Operation and Control of Photovoltaic Power Station...7

Foreword

This Standard was drafted in accordance with the rules given in GB/T 1.1-2009.

Attention is drawn to the possibility that some of the elements of this document may

be the subject of patent rights. The issuer of this document shall not be held

responsible for identifying any or all such patent rights.

This Standard was proposed by and shall be under the jurisdiction of China Electricity

Council.

The drafting organization of this Standard. China Electric Power Research Institute,

State Grid Dispatching Centre.

1 Application Scope

This Standard specifies the basic specifications of operation and control for

photovoltaic power stations, as well as the requirements for operation management,

power forecasting, power generation plan, active power control, reactive power control,

relaying protection and automatic safety device operation, electric power

communication operation, dispatching automation, equipment overhaul and accident

recording and reporting.

This Standard applies to newly-built, rebuilt and extended photovoltaic power stations

which are connected to the grid through the voltage class of 35 kV and above, and

connected to the public grid through the voltage class of 10 kV.

2 Normative References

The following referenced documents are indispensable for the application of this

document. For dated references, only the edition dated applies to this document. For

undated references, the latest edition of the referenced documents (including all

amendments) applies to this Standard.

GB/T 14285, Technical Code for Relaying Protection and Security Automatic

Equipment

GB/T 19964, Technical Requirements for Connecting Photovoltaic Power Station to

Power System

GB/T 29321, Technical Specification for Reactive Power Compensation of PV

Power Station

GB/T 31365, Testing Code for Photovoltaic Power Station Connected to Power Grid

GB/T 31366, Technical Requirements for Monitoring and Control System of

Photovoltaic Power Station

GB/T 31464, The Grid Operation Code

GB 50794, Code for Construction of PV Power Station

GB/T 50796, Code for Acceptance of Photovoltaic Power Project

GB 50797, Code for Design of Photovoltaic Power Station

DL/T 516, Code for Operation and Administration of Power Dispatching Automation

System

DL/T 544, Operation Management Code for Power System Telecommunication

DL/T 559, Code for Setting of 220 kV ~ 500 kV Relaying Protection Equipment

DL/T 584, Code for Setting of 3 kV ~ 110 kV Relaying Protection Equipment

DL/T 623, Evaluation Rules of Protection Equipment and Power System Stability

Control Devices

DL 755, Guide on Security and Stability for Power System

NB/T 32011, Technical Requirement of Power Forecasting System for PV Power

Station

3 Terms and Definitions

For the purposes of this document, the following terms and definitions and those

defined in GB/T 19964 and GB/T 31464 apply.

3.1

photovoltaic (PV) power station

The electric power generation system and auxiliaries which directly transform solar

radiant energy into electric power through the photovoltaic effects of the photovoltaic

cells.

3.2

PV power forecasting

The forecast which is made on the active power of the photovoltaic power station

through the technology and means including meteorological conditions and statistical

regularity.

3.3

grid integration test for PV power station

The test to determine the grid integration performance in five aspects including the

power quality, active power/reactive power control ability, low-voltage ride through

ability, voltage/frequency adaptation ability and active power output characteristics of

the photovoltaic power station.

3.4

dispatching automation system; it shall transmit to the grid dispatcher in time,

accurately and reliably, the equipment operation information, meteorological

information and power forecasting information of the primary systems and secondary

systems of the photovoltaic power station.

5.1.7 The photovoltaic power station shall report to the grid dispatcher in time the

alterations of the primary system equipment and secondary system equipment of the

photovoltaic power station and their safety protection schemes.

5.1.8 When the photovoltaic power station quits operation in emergency or trouble, it

shall report to the grid dispatcher immediately and start the grid-connected operation

once again in accordance with the dispatching instructions only after obtaining the

consent of the grid dispatcher. The photovoltaic power station shall keep records of

accidents and report to the grid dispatcher in time.

5.2 PV power forecasting

5.2.1 The photovoltaic power station shall report the PV power forecasting curves for

0 h ~ 24 h of the next day at the times specified by the grid dispatcher every day, the

time resolution of the forecasting values 15 min.

5.2.2 The photovoltaic power station shall report the PV power forecasting curves for

15 min ~ 4 h in the future to the grid dispatcher every 15 min, the time resolution of the

forecasting values 15 min.

5.2.3 The monthly average absolute error of the short-term forecasting of the power

generation time (not including the output control time) of the photovoltaic power station

shall be less than 0.15 and the monthly acceptability shall be greater than 80%; the

monthly absolute error of the super short-time forecasting for the fourth hour shall be

less than 0.10 and the monthly acceptability shall be greater than 85%.

5.3 Power generation plan

5.3.1 The photovoltaic power station shall give suggestions of the yearly and monthly

power generation plans in time in accordance with the meteorological data and power

forecasting, and submit to the grid dispatcher at the times specified.

5.3.2 The photovoltaic power station shall declare power generation plans in

accordance with the results of PV power forecasting, submit the power generation plan

curves for the next day to the grid dispatcher at the declaration times specified every

day, and submit the super short-time power generation plan curves every 15 min to the

grid dispatcher.

5.3.3 The photovoltaic power station shall execute automatically the plan curves

(including the plan curves modified from time to time) and dispatching instructions

issued by the grid dispatcher.

5.3.4 The photovoltaic power station shall record and analyze the execution
5.8.3 The photovoltaic power station connected through the voltage class of 220 kV

and above shall be provided with synchronized phasor measurement unit (PMU).

5.8.4 Without the consent of the grid dispatcher, work and operation shall not be

carried out on the dispatching automation equipment and its secondary loop circuits of

the photovoltaic power station.

5.8.5 When the alterations of the primary system equipment of the photovoltaic

power station (such as increases and decreases of equipment, main wiring alterations

and changes of transformation ratio of mutual inductor) result in the changes of the

measuring parameters, order positions and signal contacts, the personnel for

operating maintenance on site shall report the content of alterations to the grid

dispatcher in time.

5.8.6 The overhaul plans of the automation systems and equipment of the

photovoltaic power station shall be carried out in accordance with the work ticket

management system. The planned overhauls of the dispatching automation equipment

of the photovoltaic power station shall be carried out synchronously with the overhaul

of primary equipment in principle. Without the consent of the grid dispatcher, it shall

not allow the automation equipment to quit operation.

5.8.7 After any fault of the dispatching automation equipment of the photovoltaic

power station occurs, it shall report the fault details and effects to the grid dispatcher

and handle it as specified.

5.9 Equipment overhaul

5.9.1 The photovoltaic power station shall submit the equipment overhaul plans and

overhaul applications to the grid dispatcher in accordance with relevant regulations of

the grid equipment overhaul management. The applications, approvals, delay

(reschedule) and imple...

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 33599-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
7 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 33599-2017

$105.00