Valid

GB/T 30153-2013Technical requirement for solar energy resource real-time monitoring of photovoltaic power station (English PDF)

光伏发电站太阳能资源实时监测技术要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 30153-2013 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 17, 2013

Implementation date

August 1, 2014

Scope

GB/T 30153-2013 is the English-translated version of 光伏发电站太阳能资源实时监测技术要求.

GB/T 30153-2013 is the Chinese standard "Technical requirement for solar energy resource real-time monitoring of photovoltaic power station".

Its scope clause reads: This standard specifies the photovoltaic power station solar energy resources in real-time monitoring of site selection, measure element, measuring the performance of equipment, installation and maintenance, Measurement data and measurement data processing technical requirements.

This standard applies to grid-connected photovoltaic power stations. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 30153-2013

National Standard of the People's Republic of China

ICS
27.160
Classification
F 12

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Terms and definitions
  • 2.1 Photovoltaic power station photovoltaic (PV)
  • 2.2 Total radiation
  • 2.3 Direct radiation
  • 2.4 Method to direct radiation
  • 2.5 Scattered radiation
  • 2.6 Irradiance
  • 2.7 Total irradiance
  • 2.8 Direct radiation irradiance
  • 2.9 Method to direct radiation irradiance

1 Scope

This standard specifies the photovoltaic power station solar energy resources in real-time monitoring of site selection, measure element, measuring the performance of equipment, installation and maintenance,

Measurement data and measurement data processing technical requirements.

This standard applies to grid-connected photovoltaic power stations.

2 Terms and definitions

The following terms and definitions apply to this document.

2.1 Photovoltaic power station photovoltaic (PV)

The use of photovoltaic cells photovoltaic effect, solar radiation directly into electrical energy generation system, generally comprises transformers, inverters

And a photovoltaic array, and related auxiliary facilities.

2.2 Total radiation

Horizontal surface in the 2pi solid angle of the received radiation and direct solar radiation and scatter.

2.3 Direct radiation

Radiation emitted from the inner surface of the day in and around a small solid angle.

Note. In general, direct insolation by the viewing angle of about 5 ° measured instrument. Thus, it includes part of the scattered radiation around the solar surface, which ring solar radiation.

2.4 Method to direct radiation

And the sun's rays on a plane perpendicular to the received direct radiation.

2.5 Scattered radiation

Solar radiation reflected or scattered by atmospheric clouds, from the sky 2pi solid angle to reach down to the ground in the form of short-wave radiation.

2.6 Irradiance

Objects in the unit time, the received radiant energy per unit area.

2.7 Total irradiance

The horizontal plane formed by the hemispherical total insolation to irradiance.

2.8 Direct radiation irradiance

Irradiance radiation directly on any given plane formation.

2.9 Method to direct radiation irradiance

Irradiance direct radiation on a plane perpendicular to the beam, also known as direct normal irradiance.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 30153-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 30153-2013

$85.00