GB/T 26610.5-2022Guideline for implementation of risk-based inspection of pressure equipment system—Part 5: Quantitative analysis approach of failure consequence (English PDF)

承压设备系统基于风险的检验实施导则 第5部分:失效后果定量分析方法

Preview PDF

This is a limited preview

Buy now to download the full PDF (48 pages)

Need quotation for your management?

Get a formal quotation for GB/T 26610.5-2022 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

July 11, 2022

Implementation date

February 1, 2023

Scope

GB/T 26610.5-2022 is the English-translated version of 承压设备系统基于风险的检验实施导则 第5部分:失效后果定量分析方法.

GB/T 26610.5-2022 is the part of the Chinese guideline on risk-based inspection of pressure equipment systems that gives the quantitative analysis of the consequence of failure.

It sets out the method: the release scenarios and hole sizes considered, the calculation of the release rate and of the quantity released, the models for flammable, toxic and non-toxic releases, the areas affected and the financial loss, and the way the consequence is expressed so that it can be combined with the probability into a risk.

It applies to the pressure equipment systems defined in GB/T 26610.1-2022. Refineries, chemical plants and the inspection bodies that plan their inspections use it.

It replaces GB/T 26610.5-2014, was issued on 11 July 2022 and has applied since 1 February 2023.

Found what you need?

Document preview — GB/T 26610.5-2022

National Standard of the People's Republic of China

ICS
23.020.30
Classification
J 74
Replacing
GB/T 26610.5-2014

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms, Definitions and Symbols
  • 4 General
  • 5 General principles and requirements for quantitative analysis of failure consequences
  • 6 Selection of representative medium and related physical properties
  • 7 Analysis and calculation of medium leakage
  • 8 Calculation of the area of combustion consequences
  • 9 Calculation of the area of poisoning consequences
  • 10 Calculation of the area of non-toxic and non-flammable consequences
  • 11 Determination of area consequences
  • 12 Calculating Economic Consequences
  • Appendix A (normative) Quantitative analysis method for failure consequences of safety relief device opening
  • Appendix B (normative) Quantitative analysis method for the consequences of leakage failure of safety relief devices
  • Appendix C (Normative) Quantitative Analysis Method for Failure Consequences of Heat Exchanger Tube Bundles
  • Appendix D (normative) Quantitative analysis method for furnace tube failure consequences
  • Appendix E (normative) Principles for the selection of leakage holes and medium storage capacity
  • Appendix F (Informative) Relevant Data Sheets for Economic Consequence Analysis
  • Reference

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted.

This document is part 5 of GB/T 26610 "Implementation Guidelines for Risk-Based Inspection of Pressure Equipment Systems". GB/T 26610 has The following sections were published.

--- Part 1: Basic requirements and implementation procedures;

--- Part 2: Risk-based inspection strategies;

--- Part 3: Qualitative analysis methods of risk;

--- Part 4: Quantitative analysis method of failure probability;

--- Part 5: Quantitative analysis methods for failure consequences.

This document replaces GB/T 26610.5-2014 "Implementation Guidelines for Risk-Based Inspection of Pressure Equipment Systems Part 5: Failure Consequences Compared with GB/T 26610.5-2014, in addition to structural adjustment and editorial changes, the main technical changes are as follows.

a) A list of types of consequences characterization applicable to various types of equipment/components has been added (see Table 1);

b) The data required for the quantitative analysis of failure consequences have been changed (see 5.1, 5.1 of the.2014 edition);

c) Added the classification table of economic consequences of heat exchanger tube bundles (see Table 3);

d) The basic workflow for quantitative analysis of failure consequences has been changed from textual representation to graphic representation (see 5.5, 5.5 of the.2014 edition);

e) Changed the diameter range of leakage holes used in consequence analysis (see Table 6, Table 4 of the.2014 edition);

f) The formula for calculating the damage area of equipment that cannot spontaneously combust the continuous leakage medium has been changed, and the maximum value of the resultant area has been canceled.

For the conditions in the range of 929m2, the calculation formulas for the liquid phase and gas phase of the medium leakage are combined, and the calculation of the effective leakage rate is deleted. formula (see 8.5.2, 8.5.2 of the.2014 edition);

g) Changed the calculation formula of equipment damage area where continuous leakage medium may spontaneously ignite, canceled the limitation of the maximum result area to For the conditions in the range of 929m2, the calculation formulas for the liquid phase and gas phase of the medium leakage are combined, and the calculation of the effective leakage rate is deleted. formula (see 8.5.3, 8.5.3 of the.2014 edition);

h) Changed the calculation formula for the damage area of equipment where the instantaneous leakage medium cannot spontaneously ignite, and canceled the limitation of the maximum value of the consequence area to For the conditions in the range of 929m2, the calculation formula for the phase state of the medium leakage is liquid and gas phase, and the calculation formula for the effective leakage amount is deleted. formula (see 8.6.2, 8.6.2 of the.2014 edition);

i) The formula for calculating the damage area of equipment that may spontaneously ignite the instantaneous leakage medium has been changed, and the maximum value of the resultant area has been cancelled For the conditions in the range of 929m2, the calculation formula for the phase state of the medium leakage is liquid and gas phase, and the calculation formula for the effective leakage amount is deleted. formula (see 8.6.3, 8.6.3 of the.2014 edition);

j) The constants in the formula for determining the balance factor based on auto-ignition temperature have been changed (see 8.10.1, 8.10.1 of the.2014 edition);

k) Changed the notation of parameters in the calculation of the consequence area for different toxic media (see 9.4, 9.4 of the.2014 edition);

l) Changed the formula for calculating the area of the result of hydrogen fluoride and hydrogen sulfide poisoning to reduce the complexity of the formula [see formula (44) and formula (45), formula (55) and formula (56) of the.2014 edition];

m) The calculation method of the poisoning consequence area for the instantaneous leakage of other common (10 kinds) toxic media has been added (see 9.4.4.2);

n) The conversion factor in the calculation formula for the evaporation proportion of the leaking medium involved in the cost of environmental cleanup in the economic consequences was added (see 12.6.2.2, 2014 version 12.6.2.2);

o) Changed the safety valve to a safety relief device, and corrected the pressure in the protected equipment under the overpressure condition of the safety relief device (see appendix).

A and Appendix B, Appendix A and Appendix B of the.2014 edition);

p) Changed the correlation coefficient in the calculation formula of mild to moderate leakage rate of safety relief devices (see B.3.1.1,.2014 edition of B.3.1.1);

q) Changed the continuous leakage time of the safety relief device with an inlet nominal diameter of DN >150 released to the atmosphere (see B.3.2.1,.2014 year edition B.3.2.1);

r) Changed the constant coefficient in the calculation formula of heat exchanger tube bundle replacement cost (costbundle) [see C.5.1 formula (C.3),.2014 edition The C.5.1 formula (C.3)];

s) Commonly used heat exchanger tube bundle materials are added, and the cost factors for different tube bundle materials and carbon steel tube bundles are corrected (see Table C.1, Table C.1 of the.2014 edition);

t) Added the technical content of the quantitative analysis method of furnace tube failure consequences (see Appendix D);

u) Changed the equipment damage cost of different equipment types corresponding to various leakage holes (see F.2.1, E.2.1 of the.2014 edition);

v) Changed the estimated value of downtime caused by leakage of each type of leak (see F.2.3, E.2.3 of the.2014 edition).

Introduction

Risk-based inspection (RBI) is not only a scientific and reliable inspection mode, but also includes advanced management and maintenance concepts.

The engineering application practice of RBI over the years has shown that RBI in my country's petrochemical industry can achieve long-term safe operation of production units and reduce production costs.

It has played a huge role in increasing the cost, increasing economic benefits and enhancing the competitiveness of enterprises. GB/T 26610.1 first formulated in.2011 and

GB/T 26610.2~26610.5, which was first formulated in.2014, formed my country's RBI technical standard system and ended the development of RBI in my country. According to the history of foreign standards.

This document (GB/T 26610.5) is part 5 of GB/T 26610.The consequences of failure are necessary components that constitute the operation risk of pressure equipment.

The purpose of the analysis is to classify the potential failure consequences of pressure equipment. This document provides scientific post-failure results for the implementation of RBI projects.

The quantitative analysis method can also provide relevant reference and help for the risk-based design of pressure equipment.

Since the implementation of GB/T 26610.5-2014, a large amount of empirical data has been accumulated and needs to be absorbed and applied; economic consequences analysis The relevant data are related to the social price level and should be updated to maintain the rationality of the analysis results;

Relevant research results have been obtained on the control methods of failure consequences of The key technology research of the key research and development plan project "High-parameter pressure special equipment risk prevention and control and key technology research" has been completed. Revision of GB/T 26610.5-2014.

1 Scope

This document specifies a method for quantitative analysis of failure consequences during risk-based inspection (RBI) of pressure-bearing equipment systems.

This document applies to the pressure equipment system referred to in GB/T 26610.1-2022.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.

GB/T 26610.4-2022 Implementation Guidelines for Risk-Based Inspection of Pressure Equipment Systems Part 4: Quantitative Analysis of Failure Probability method

3 Terms, Definitions and Symbols

3.1 Terms and Definitions

The following terms and definitions apply to this document.

3.1.1 Economic consequencesfinancialconsequence

Economic losses due to equipment failure.

Note: Includes equipment repair or replacement costs, damage costs to other equipment in the area affected by equipment failure, media leakage, and equipment repair or replacement costs The cost of downtime, the cost of personal injury caused by failure, and the cost of environmental cleanup.

3.1.2 Area consequences

Consequences determined according to the size of the area affected by the equipment failure.

Note: including equipment damage area consequences and personnel injury area consequences.

3.1.3 Auto-ignition temperature auto-ignition temperature; AIT

In the absence of external flames, sparks and other sources of ignition, combustible substances will burn by themselves due to heating or self-heating and heat storage. temperature.

3.1.4 Continuous leak

The leakage lasts for a long time, and the leaked medium spreads in an elliptical shape.

3.1.5 Instantaneous release

Rapid leakage, the leakage duration is very short, and the leaked medium spreads in the form of a single cloud or liquid pool.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 48 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 26610.5

EditionTitleRevisionStatus
GB/T 26610.5-2022Guideline for implementation of risk-based inspection of pressure equipment system—Part 5: Quantitative analysis approach of failure consequencecurrent editionCurrent
GB/T 26610.5-2014Guideline for implementation of risk-based inspection of pressure equipment system—Part 5: Quantitative analysis approach of failure consequenceprevious editionSuperseded

This page sells the current edition, GB/T 26610.5-2022. Earlier editions are listed for reference only.

How to Download GB/T 26610.5-2022

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
48 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 26610.5-2022

$590.00