Valid

GB 50311-2016Code for engineering design of generic cabling system (English PDF)

Also coversGB50311-2016

Open the GB 50311-2016 preview as PDF

Preview — first pages of GB 50311-2016

This is a limited preview

Buy now to download the full PDF

Issued by

Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Level / Type

National · Mandatory

Issue date

August 26, 2016

Implementation date

April 1, 2017

Scope

GB 50311-2016 (Code for engineering design of generic cabling system) is available as an English-translated PDF.

GB 50311-2016 — This code is applicable to the engineering design of generic cabling system for constructed, extended and renovated buildings and campus.

Document preview — GB 50311-2016

National Standard of the People's Republic of China

ICS
91.040
Classification
P 30
Replacing
GB 50311-2007

Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Contents

  • Foreword
  • 1 General Provisions ... 1
  • 2 Terms and Abbreviations ... 2
  • 2.1 Terms ... 2
  • 2.2 Abbreviations ... 6
  • 3 System Design ... 9
  • 3.1 System Components ... 9
  • 3.2 System Classification and Composition ... 12
  • 3.3 Cable Length Division ... 14
  • 3.4 System Application ... 18
  • 3.5 Shielded Cabling System... 20
  • 3.6 Open Office Cabling System ... 21
  • 3.7 Industrial Environment Cabling System ... 22
  • 3.8 Cabling Used in Weak System ... 26
  • 4 Fibre to the Subscriber Unit Communication Facilities ... 27
  • 4.1 General Requirements ... 27
  • 4.2 The Subscriber Access Point Settings ... 29
  • 4.3 Collocating Principle ... 31
  • 4.4 Cable and Wiring Equipment Selection ... 32
  • 4.5 Transmission Indicators ... 34
  • 5 System Configuration Design ... 35
  • 5.1 Work Area ... 35
  • 5.2 Wiring Subsystem ... 35
  • 5.3 Link Subsystem... 37
  • 5.4 Campus Subsystem ... 38
  • 5.5 Entrance Facilities ... 38
  • 5.6 Distribution Management System ... 39
  • 6 Performance Indicators ... 41
  • 6.1 Cable and Connecting Hardware Performance Indicators ... 41
  • 6.2 System Performance Indicators ... 43
  • 7 Installation Requirements ... 45
  • 7.1 Work Area ... 45
  • 7.2 Telecommunications Room ... 46
  • 7.3 Equipment Room ... 47
  • 7.4 Line Room ... 49
  • 7.5 Duct and Cable Tray Installation ... 50
  • 7.6 Cable Laying ... 52
  • 7.7 Equipment Installation Design ... 55
  • 8 Electrical Protection and Grounding ... 57
  • 9 Fire Prevention ... 59
  • 1 General Provisions

Foreword

This code is revised by China Mobile Group Design Institute Co., Ltd. jointly with the

organizations concerned according to the requirements of Document JIANBIAO [2012]

No.5 issued by the Ministry of Housing and Urban-Rural Development- Notice on Printing

and Distributing 'the Development and Revision Plan of National Engineering

Construction Standards in 2012'.

During the process of formulating this code, the code drafting group carries out extensive

investigations and studies, carefully summarizes the practical experience, refers to the

relevant international and foreign standards, extensively solicits opinions and finalizes this

code through review.

This code comprises nine chapters and three annexes, with the main technical contents

including. General Provisions, Terms and Abbreviations, System Design, Fiber to the

Subscriber Unit Communication Facilities, System Configuration Design, Performance

Indicators, Installation Requirements, Electrical Protection and Grounding, Fire

Prevention, etc.

The following technical deviations have been made with respect to the former code.

(1) The design requirements of the campus and building generic cabling system and the

communication infrastructure engineering are supplemented and perfected on the basis of

the contents of GB 50311-2007 Code for Engineering Design of Generic Cabling System.

(2) The contents relevant to the application of cabling system in weak system are added.

(3) The engineering design requirements for fiber to the subscriber unit communication

facilities are added, and the mandatory provisions relevant to the engineering construction

of fiber to the subscriber unit communication facilities are newly added.

(4) The installation requirements for pipe chase and equipment are enriched.

(5) Relevant annexes are added.

In this code, the provisions printed in bold type are mandatory ones and must be enforced

strictly.

The Ministry of Housing and Urban-Rural Development the People's Republic of China is

in charge of the administration of this code and the explanation of the mandatory

Contents

1 General Provisions ... 1

2 Terms and Abbreviations ... 2

2.1 Terms ... 2

2.2 Abbreviations ... 6

3 System Design ... 9

3.1 System Components ... 9

3.2 System Classification and Composition ... 12

3.3 Cable Length Division ... 14

3.4 System Application ... 18

3.5 Shielded Cabling System... 20

3.6 Open Office Cabling System ... 21

3.7 Industrial Environment Cabling System ... 22

3.8 Cabling Used in Weak System ... 26

4 Fibre to the Subscriber Unit Communication Facilities ... 27

4.1 General Requirements ... 27

4.2 The Subscriber Access Point Settings ... 29

4.3 Collocating Principle ... 31

4.4 Cable and Wiring Equipment Selection ... 32

4.5 Transmission Indicators ... 34

5 System Configuration Design ... 35

5.1 Work Area ... 35

5.2 Wiring Subsystem ... 35

5.3 Link Subsystem... 37

5.4 Campus Subsystem ... 38

5.5 Entrance Facilities ... 38

5.6 Distribution Management System ... 39

6 Performance Indicators ... 41

6.1 Cable and Connecting Hardware Performance Indicators ... 41

6.2 System Performance Indicators ... 43

7 Installation Requirements ... 45

7.1 Work Area ... 45

7.2 Telecommunications Room ... 46

7.3 Equipment Room ... 47

7.4 Line Room ... 49

7.5 Duct and Cable Tray Installation ... 50

7.6 Cable Laying ... 52

7.7 Equipment Installation Design ... 55

8 Electrical Protection and Grounding ... 57

9 Fire Prevention ... 59

Annex A System Indicators ... 60

Annex B Communication Services Supported by 8-bit-module Universal Outlet Terminal

... 76

Annex C Cable Transmission Performance and Transmission Distance ... 77

Explanation of Wording in this Code ... 85

List of Quoted Standard ... 86

1 General Provisions

1.0.1 This code is formulated with view to standardizing the construction of network

integrating voice, data, picture and multimedia services for buildings and campus.

1.0.2 This code is applicable to the engineering design of generic cabling system for

constructed, extended and renovated buildings and campus.

1.0.3 The construction of facilities in generic cabling system shall be included in the

corresponding planning and design of buildings and campus. The design shall be carried

out according to the nature, functions and environmental conditions of engineering project

and the short-/long-term subscriber demands, and the construction and maintenance

convenience shall be taken into consideration to ensure the quality and safety of generic

cabling system engineering and to achieve advanced technology and economic

rationality.

1.0.4 Generic cabling system should be planned as a whole and also be designed

synchronously together with the wiring of information network system, security technology

and protection system and building automation system, etc., and its design shall be

reasonably optimized according to the information transmission requirements of these

systems.

1.0.5 In the engineering design of generic cabling system, the products selected shall be

approved products which are accompanied with acceptance inspection report and meet

the relevant technical requirements of the nation.

1.0.6 In addition to this code, the engineering design of generic cabling system shall

also comply with those specified in the current relevant standards of the nation.

permanent link, including the connecting hardwares at both ends, between floor distributor

and consolidation point (CP)

2.1.10 campus distributor

distributor used for terminating the campus backbone cable

2.1.11 building distributor

distributor used for terminating the building backbone cable or campus backbone cable

2.1.12 floor distributor

distributor used for terminating the horizontal cable and the cables in othe...

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Buy GB 50311-2016

  1. 1Add to cart. Click the "Buy GB 50311-2016" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 50311-2016

$130.00

$110.00for partners