NB/T 20023-2010Guidelines for Cost Category and Cost Account of Nuclear Power Plant Construction Project (English PDF)
核电厂建设项目费用性质及项目划分导则
This is a limited preview
Buy now to download the full PDF (26 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20023-2010 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
May 1, 2010
Implementation date
October 1, 2010
Scope
NB/T 20023-2010 is the English-translated version of 核电厂建设项目费用性质及项目划分导则.
NB/T 20023-2010 is the Chinese energy industry guideline on cost categories and cost accounts for nuclear power plant construction projects. It sets out how the estimates, the design estimates and the construction budget of such a project are divided, and how the expenses are grouped by their nature.
It is written for pressurized water reactor projects with unit capacities of the 300 MW, 600 MW and 1000 MW classes, covering investment estimates at the pre-feasibility and feasibility stages, preliminary design estimates and construction budgets.
The same breakdown serves for preparing tender documents and bids, for final settlement, and as a basis when construction economic disputes or bid prices have to be assessed.
NB/T 20025 is quoted. Issued on 1 May 2010, it has applied since 1 October 2010.
Found what you need?
Document preview — NB/T 20023-2010
National Standard of the People's Republic of China
- ICS
- 01.040.27
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20023-2010 cites the following standards, which apply in full or in part through the references made to them in its clauses.
NB/T 20025
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 26 pages — is available in the English PDF.
Referenced standards
Normative references
Cited by
- NB/T 20259.5-2021Code of valuation on bill of quantities of nuclear power plant construction works - Part 5: Electrical equipment installation
- NB/T 20401-2017Specification for content and depth of preliminary design documents of nuclear power plants
- NB/T 20024-2010Methodology for Cost Estimation of Nuclear Power Plant Construction Project
Similar standards
How to Download NB/T 20023-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20025-2010 — Regulation for preparation of other costs of nuclear power plant construction projects
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
Secure payment via Stripe
Payments accepted
NB/T 20023-2010
$465.00