NB/T 20024-2010Methodology for Cost Estimation of Nuclear Power Plant Construction Project (English PDF)
核电厂工程建设预算编制方法
This is a limited preview
Buy now to download the full PDF (25 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20024-2010 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
May 1, 2010
Implementation date
October 1, 2010
Scope
NB/T 20024-2010 is the English-translated version of 核电厂工程建设预算编制方法.
NB/T 20024-2010 is the Chinese energy industry standard that describes the methodology for estimating the cost of a nuclear power plant construction project. It sets out how the construction budget estimate for such a project is prepared.
The method is written for the budget estimates of new and expansion pressurized water reactor plants financed through any kind of investment channel, and nuclear projects using other reactor types may refer to it.
It quotes NB/T 20023 and NB/T 20025. Issued on 1 May 2010, it has applied since 1 October 2010.
Found what you need?
Document preview — NB/T 20024-2010
National Standard of the People's Republic of China
- ICS
- 01.040.27
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20024-2010 cites the following standards, which apply in full or in part through the references made to them in its clauses.
NB/T 20023
NB/T 20025
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 25 pages — is available in the English PDF.
Referenced standards
Normative references
Similar standards
How to Download NB/T 20024-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20023-2010 — Guidelines for Cost Category and Cost Account of Nuclear Power Plant Construction Project
NB/T 20025-2010 — Regulation for preparation of other costs of nuclear power plant construction projects
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
Secure payment via Stripe
Payments accepted
NB/T 20024-2010
$435.00