Valid

JB/T 10979-2010Rectifier equipment for DC system in electric power engineering (English PDF)

电力工程直流系统用整流设备

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for JB/T 10979-2010 in 30 minutes.

Issued by

MIIT

Level / Type

Industry · Recommended

Issue date

February 11, 2010

Implementation date

July 1, 2010

Scope

JB/T 10979-2010 is the English-translated version of 电力工程直流系统用整流设备.

JB/T 10979-2010 is a recommended Chinese machinery industry standard for the rectifier equipment used in the DC systems of electric power engineering. It gives the terms and definitions for such equipment, its basic parameters, the technical requirements, the inspection and testing, and the provisions on marking, packaging, transport and storage.

The field is the rectifier equipment of those DC systems; other devices of the system, such as the DC distribution unit and the battery set, remain with their own standards, and the general requirements for semiconductor converters are left to GB/T 3859 rather than treated here.

Among the standards it quotes are GB/T 2900.1-2008, GB/T 4365-2003, GB/T 14549, DL/T 5044-2004 and JB/T 10095-2010. Its codes are K46 and 29.200.

Found what you need?

Document preview — JB/T 10979-2010

National Standard of the People's Republic of China

ICS
29.200

Issued by: Ministry of Industry and Information Technology of the People's Republic of China

Contents

  • [Preview only]
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Technical requirements
  • 4.1 General requirements
  • 4.2 Model designation
  • 6 Test methods
  • 6.1 Factory inspection
  • 6.2 Type inspection
  • 7 Inspection rules
  • 8 Marking, packaging, transportation and storage
  • 8.1 Marking
  • 8.2 Packaging

1 Foreword

JB/T 10979-2010 was issued by Ministry of Industry and Information Technology of the People's Republic of China on 11 February 2010 and has been in force since 1 July 2010.

The JB/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.

The document runs to 15 pages in English translation.

2 Scope Preview

This standard is a recommended Chinese machinery industry standard for the rectifier equipment used in the DC systems of electric power engineering. It gives the terms and definitions for such equipment, its basic parameters, the technical requirements, the inspection and testing, and the provisions on marking, packaging, transport and storage. The field is the rectifier equipment of those DC systems; other devices of the system, such as the DC distribution unit and the battery set, remain with their own standards, and the general requirements for semiconductor converters are left to GB/T 3859 rather than treated here. Among the standards it quotes are GB/T 2900.1-2008, GB/T 4365-2003, GB/T 14549, DL/T 5044-2004 and JB/T 10095-2010. Its codes are K46 and 29.200.

JB/T 10979-2010 falls under ICS 29.200, in the field of electrical engineering.

This catalogue holds 619 other JB/T standards in that field.

In this catalogue, JB/T standards carry edition years from 1967 to 2026.

3 Normative references

GB/T 2900.1-2008 — Electrotechnical terminology - Fundamental terms

GB/T 2900.33-2004 — Electrotechnical terminology -- Power electronics

GB/T 4365-2003 — Electrotechnical terminology -- Electromagnetic compatibility

GB/T 3859.1-1993 — Semiconductor convertors. Specification of basic requirements

GB/T 3859.2-1993 — Semiconductor convertors. Application guide

GB/T 13384-2008 — General specifications for packing of mechanical and electrical product

GB/T 14549

GB/T 17626.2-2006 — Electromagnetic compatibility (EMC) - Testing and measurement techniques - Electrostatic discharge immunity test

GB/T 17626.4-2008 — Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient/burst immunity test

GB/T 17626.5-2008 — Electromagnetic compatibility - Testing and measurement techniques - Surge immunity test

GB/T 17626.12-1998 — Electromagnetic compatibility--Testing and measurement techniques--Oscillatory waves immunity test

DL/T 5044-2004 — Technical code for designing DC system of power projects

JB/T 8636-1997 — Power converter transformers

JB/T 10095-2010 — Charging equipment for industrial batteries

4 About this standard

Issued by: Ministry of Industry and Information Technology of the People's Republic of China

English translation: about 15 pages

5 Related standards

Standards on related subjects:

GB/T 31487.3-2015 — Direct current de-icing devices -- Part 3: Tests

GB/T 3859.1-2013 — Semiconductor converters -- General requirements and line commutated Converters -- Part 1-1: Specification of basic requirements

GB/T 13422-2013 — Semiconductor converters - Electrical test methods

JB/T 14937.1-2025 — Uninterruptible power supply devices for platform doors of urban rail transit - Part 1: Technical requirements

JB/T 14052-2025 — Bidirectional converter for DC energy storage system

JB/T 14049-2025 — Low-voltage static reactive power generator

6 Classification and status

International classification (ICS): 29.200

Chinese Standard Classification (CCS): K 46

Prefix JB/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download JB/T 10979-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

JB/T 10979-2010

$225.00