Valid

GB/T 753-2012Steam condition series for utility boilers (English PDF)

电站锅炉 蒸汽参数系列

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 753-2012 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 31, 2012

Implementation date

July 1, 2013

Scope

GB/T 753-2012 is the English-translated version of 电站锅炉 蒸汽参数系列.

GB/T 753-2012 is the Chinese standard "Steam condition series for utility boilers". Its scope clause reads: This standard specifies the requirements for serialization boiler steam parameters.

This standard applies to the burning of fossil fuels, waste incineration boilers and boiler fuels and biomass direct-fired heat recovery boilers, non-direct fired Waste heat boiler, when required, the steam parameters can refer to this standard.

NOTE. The standard refers to the boiler and condensing steam turbine for power generation or cogeneration steam turbine power station boilers. Its clauses include terms and definitions; unit rated power series.

Found what you need?

Document preview — GB/T 753-2012

National Standard of the People's Republic of China

ICS
27.060
Classification
J 98

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 unit rated power series

1 Scope

This standard specifies the requirements for serialization boiler steam parameters.

This standard applies to the burning of fossil fuels, waste incineration boilers and boiler fuels and biomass direct-fired heat recovery boilers, non-direct fired

Waste heat boiler, when required, the steam parameters can refer to this standard.

NOTE. The standard refers to the boiler and condensing steam turbine for power generation or cogeneration steam turbine power station boilers.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein

Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 321 priority number and priority number system

GB/T 754 steam turbine for power generation parameters series

GB/T 2900.48 Electrotechnical terminology boiler

GB/T 5578 stationary power generation steam turbine specification

GB 50660 and medium-sized thermal power plant design procedures

DL/T 5054 thermal power plant steam piping design technical regulations

DL/T 5072 thermal power plant paint design requirements

3 Terms and Definitions

GB/T 2900.48 and GB/T 5578 defining the terms and definitions (see Appendix A) and the following terms and definitions apply to this document.

3.1 Unit rated power ratedpoweroftheunit

Steam turbine rated power as a unit rated power.

3.2 Units steam parameters steamconditionsoftheunit

The new steam turbine with a rated pressure and temperature rating as a unit steam parameters. Reheat steam parameters unit also includes re-rated

Hot temperature.

Note. The new steam known as the main steam, the main steam valve steam inlet, see GB/T 5578.

3.3 Basic series

Precedence series.

3.4 Supplement Series

The basic series of complementary parts.

4 unit rated power series

Unit rated power is the main basis for determining the capacity of the boiler and steam parameters.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 753-2012

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 753-2012

$165.00