Scope
GB/T 44262-2024 is the English-translated version of 质子交换膜燃料电池汽车用氢气采样技术要求.
GB/T 44262-2024 sets the technical requirements for sampling the hydrogen used in fuel cell vehicles, and it is the standard the whole fuel quality regime rests on. Fuel cell hydrogen has to be extraordinarily pure, with limits on carbon monoxide, sulfur compounds and ammonia in the parts per billion, because those species poison the catalyst irreversibly; at those levels the sample is far more easily contaminated than the fuel, and a badly taken sample fails a good batch or passes a bad one. The standard specifies the sampling point and the sampling adapter at the dispenser, the materials and the passivation of the sampling vessel and the lines, the purging procedure and the number of purge cycles, the sampling conditions of pressure, temperature and flow, the volume required for each analysis, the labelling, transport and storage of the sample and its holding time, the blank and control samples, and the records. Its companions GB/T 44238, GB/T 44242 and GB/T 44243 analyse what it collects. For a station operator, a gas supplier or a laboratory in China, this is the procedure.
Document preview — GB/T 44262-2024
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- F19
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative References
- 3 Terms and Definitions
- 4 Equipment
- 4.1 Hydrogen Sampling Device
- 5 Pre-sampling Preparation
- 6 Sampling Steps
- 6.3 System Blowing
- 6.4 Sample Collection
1 Scope
GB/T 44262-2024 sets the technical requirements for sampling the hydrogen used in fuel cell vehicles, and it is the standard the whole fuel quality regime rests on. Fuel cell hydrogen has to be extraordinarily pure, with limits on carbon monoxide, sulfur compounds and ammonia in the parts per billion, because those species poison the catalyst irreversibly; at those levels the sample is far more easily contaminated than the fuel, and a badly taken sample fails a good batch or passes a bad one. The standard specifies the sampling point and the sampling adapter at the dispenser, the materials and the passivation of the sampling vessel and the lines, the purging procedure and the number of purge cycles, the sampling conditions of pressure, temperature and flow, the volume required for each analysis, the labelling, transport and storage of the sample and its holding time, the blank and control samples, and the records. Its companions GB/T 44238, GB/T 44242 and GB/T 44243 analyse what it collects. For a station operator, a gas supplier or a laboratory in China, this is the procedure.
This document specifies the requirements for hydrogen sampling equipment, pre-sampling preparation, sampling steps and sampling record for proton exchange membrane fuel cell vehicles. This document is applicable to the sampling of hydrogen in hydrogen refueling stations with a pressure level not greater than 70 MPa. The sampling of hydrogen for proton exchange membrane fuel cells in the production, storage and transportation sites may take this as a reference.
2 Normative References
The contents of the following documents constitute indispensable clauses of this document through the normative references in the text. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document.
GB/T 1226 General Pressure Gauge
GB/T 1227 Accurate Pressure Gauge
GB/T 8979 Pure Nitrogen and High Purity Nitrogen and Ultra Pure Nitrogen
GB/T 12244 General Requirements for Pressure Reducing Valves
GB 12358 Gas Monitors and Alarms for Workplace - General Technical Requirements
GB/T 21465 Terminology for Valves
GB/T 24499 Technology Glossary for Gaseous Hydrogen, Hydrogen Energy and Hydrogen Energy System
GB/T 26779 Hydrogen Fuel Cell Electric Vehicle Refueling Receptacle
GB/T 29729 Essential Requirements for the Safety of Hydrogen Systems
GB/T 37244 Fuel Specification for Proton Exchange Membrane Fuel Cell Vehicles - Hydrogen
GB/T 43306 Gas Analysis - Sampling Guidelines
GB/T 43674 General Requirements of Hydrogen Fueling Stations
GB 50156 Technical Standard of Fueling Station
3 Terms and Definitions
The terms and definitions defined in GB/T 21465, GB/T 24499 and GB/T 43306 are applicable to this document.
4.1 Hydrogen Sampling Device
4.1.1 General requirements The hydrogen sampling device shall satisfy the following requirements:
---The design of the hydrogen sampling device shall comply with the relevant provisions of GB 50156, GB 50516 and GB/T 43674;
---Materials in contact with hydrogen in the hydrogen sampling device shall comply with the relevant provisions of GB/T 29279;
---The hydrogen sampling device shall not contaminate the sample, and the materials in contact with hydrogen in the sampling device shall not adsorb the collected components. The overall performance shall be subject to a quality assessment in accordance with GB/T 43306.
4.1.2 Basic composition The hydrogen sampling device should be equipped with sampling source port, stop valve, pressure gauge, pressure reducing valve, inlet valve, outlet valve, sampling gas cylinder, bypass valve, safety valve, check valve, venting component and grounding component. It is advisable to choose valves with a small dead volume. The schematic diagram of the hydrogen sampling device is shown in Figure 1. Hydrogen sampling devices with the same functions as shown in the Figure may also adopt this Figure. Each sample source port of the hydrogen sampling device shall be equipped with a separate stop valve, and the nominal pressure of the stop valve shall be greater than the maximum allowable working pressure of the sample source port.
4.1.3.3 Pressure gauge The pressure gauge shall comply with the provisions of GB/T 1226 or GB/T 1227. The measuring range of the sample source pressure gauge should be 1.5 ~
3.0 times the maximum allowable working pressure of the sample source port, and the measuring range of the output pressure gauge should be 1.5 ~
3.0 times the design sampling pressure.
4.1.3.4 Pressure reducing valve The pressure reducing valve shall comply with the provisions of GB/T 12244 and GB/T 43306. Its material should be stainless steel and subject to inert treatment, and the dead volume should be as small as possible. The nominal pressure shall be greater than the maximum allowable working pressure of the sample source port. The outlet pressure shall be adjustable to the design sampling pressure.
4.1.3.5 Inlet valve, outlet valve and bypass valve The inlet valve, outlet valve and bypass valve shall be valves that are easy to open and close (for example, ball valves), and the nominal pressure shall be greater than the set pressure of the safety valve.
4.1.3.6 Sampling gas cylinder The sampling gas cylinder shall comply with the relevant provisions of special equipment and be exclusively used. Its nominal working pressure shall not be lower than the maximum design sampling pressure. The sampling gas cylinder should be a double-valve type. For sampling gas cylinder used for adsorbent impurity detection, the inner wall, inlet valve and outlet valve of the gas cylinder shall be subject to the inert treatment.
4.1.3.7 Safety valve The safety valve should be a full-open safety valve, and the set pressure should be 1.05 ~
1.15 times the maximum design sampling pressure of the hydrogen sampling device.
4.1.3.8 Check valve The opening pressure of the check valve should be greater than 69 kPa.
5 Pre-sampling Preparation
5.1 Before sampling, in accordance with the demands for sample testing, determine the sampling volume, sampling pressure and specifications of the sampling gas cylinder.
5.2 Before sampling, the sampling gas cylinder shall be cleaned to remove air, moisture and other contaminants. When the hydrogen retained in the sampling gas cylinder complies with the provisions of GB/T 37244 and the pressure is not less than
0.2 MPa (gauge pressure), the sampling gas cylinder does not need to be cleaned.
5.3 Before sampling, nitrogen that complies with the provisions of high purity nitrogen in GB/T 8979 shall be used to blow the hydrogen sampling device, so as to remove air and moisture. During blowing, the sampling device shall not be equipped with a sampling gas cylinder. After blowing is completed, all valves of the sampling device shall be closed to prevent air from entering. Water, isopropyl alcohol or other solvents shall not be used to clean the hydrogen sampling device. NOTE: the residual nitrogen here can be easily removed when the system is blown in accordance with
6.3 and will not affect subsequent sample analysis.
6 Sampling Steps
NOTE: when the sampling device is equipped with multiple sample source ports and stop valves, the stop valve described in this Chapter refers to the stop valve corresponding to the sample source port to be sampled, and the stop valves corresponding to the other sample source ports are closed throughout the process. accessories of the hydrogen sampling device are replaced or re-connected, leak detection shall be performed again.
6.3 System Blowing
6.3.1 General rules The system blowing shall be carried out in accordance with
6.3.2 or 6.3.3. When sampling the hydrogen refueling nozzle outlet, it shall be carried out in accordance with 6.3.2.
6.3.2 Continuous blowing displacement method The continuous blowing displacement method is carried out in accordance with the following steps:
a) When confirming that the stop valve A is closed, open the sample source hydrogen valve;
b) Slowly open the stop valve A and adjust the pressure reducing valve B to the sampling pressure;
c) Successively open the inlet valve D, sampling gas cylinder inlet valve E, sampling gas cylinder outlet valve F and outlet valve G to allow the blown hydrogen to flow through the sampling device and sampling gas cylinder. During operation, the pressure and temperature of the sampling gas cylinder shall be observed. When the gas cylinder pressure exceeds the sampling pressure or the gas cylinder temperature is significantly higher than the ambient temperature, the sample source hydrogen valve shall be immediately closed. The amount of gas blown shall be not less than 600 times the total volume of the sampling gas cylinder and the sampling device pipeline.
6.3.3 Inflate-vent displacement method The inflate-vent displacement method is carried out in accordance with the following steps:
a) Confirm that the stop valve A is closed and open the sample source hydrogen valve;
b) Slowly open the stop valve A and adjust the pressure reducing valve B to the sampling pressure;
c) Successively open the inlet valve D and sampling gas cylinder inlet valve E to allow hydrogen to flow into the sampling gas cylinder;
d) After the output pressure gauge is stable, close the inlet valve D, open the sampling gas cylinder outlet valve F and outlet valve G, vent the hydrogen in the sampling gas cylinder and pipeline, and close the outlet valve G;
e) Open the inlet valve D. After the output pressure gauge is stable, close the inlet valve D, open the outlet valve G, vent the hydrogen in the sampling gas cylinder and pipeline, and then, close the outlet valve G;
f) When the sampling pressure is less than or equal to 3 MPa, repeat step
e) for no less than 9 times; when the sampling pressure is greater than 3 MPa, repeat step
6.4 Sample Collection
6.4.1 After completing the system blowing in accordance with 6.3.2, follow the following steps to collect samples:
a) Close the sampling gas cylinder outlet valve F;
b) After the output pressure gauge is stable, close the sampling gas cylinder inlet valve E;
c) Close the sample source hydrogen valve and the stop valve A;
d) Open the bypass valve C to discharge the remaining hydrogen in the hydrogen sampling device;
e) Close the inlet valve D and outlet valve G, and remove the sampling gas cylinder;
f) Use a hydrogen leak detector to detect leaks in the removed sampling gas cylinder. During operation, the pressure and temperature of the sampling gas cylinder shall be observed. When the gas cylinder pressure exceeds the sampling pressure or the gas cylinder temperature is significantly higher than the ambient temperature, the sample source hydrogen valve shall be immediately closed.
6.4.2 After completing the system blowing in accordance with 6.3.3, follow the following steps to collect samples:
a) Open the inlet valve D;
b) After the output pressure gauge is stable, close the sampling gas cylinder outlet valve F and the sampling gas cylinder inlet valve E;
c) Close the sample source hydrogen valve and the stop valve A;
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 12 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 1226General pressure gauge
- GB/T 1227Accurate pressure gauge
- GB/T 8979Pure nitrogen, high purity nitrogen and ultra pure nitrogen
- GB/T 12244Pressure reducing valves - General requirements
- GB 12358Gas detection and alarm instruments for workplace - General technical requirements
- GB/T 21465Terminology for valves
GB/T 43306 · GB/T 43674 · GB 50156 · GB 50516
Cited by
- GB/T 44238-2024Hydrogen for proton exchange membrane fuel cell vehicles - Determination of helium, argon, nitrogen and hydrocarbons - Gas chromatography
- GB/T 44242-2024Hydrogen for proton exchange membrane fuel cell vehicles - Determination of inorganic halides and formic acid - Ion chromatography
- GB/T 44243-2024Hydrogen for proton exchange membrane fuel cell vehicles - Determination of sulfur compounds, formaldehyde and organic halides - Gas chromatography
How to Buy GB/T 44262-2024
- 1Add to cart. Click the "Buy GB/T 44262-2024" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 12358-2024 — Gas detection and alarm instruments for workplace - General technical requirements
GB/T 12244-2025 — Pressure reducing valves - General requirements
GB/T 1226-2017 — General pressure gauge
Secure payment via Stripe
Payments accepted
GB/T 44262-2024
$245.00