GB/T 42005.2-2022Railway applications—Onboard energy storage tram—Part 2: Ground charging system (English PDF)
轨道交通 储能式电车 第2部分:地面充电系统
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 42005.2-2022 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 12, 2022
Implementation date
May 1, 2023
Scope
GB/T 42005.2-2022 is the English-translated version of 轨道交通 储能式电车 第2部分:地面充电系统.
GB/T 42005.2-2022 is part 2 of the Chinese national standard on onboard energy storage trams and deals with the ground charging system.
It fixes the environmental conditions and the power supply conditions - AC input voltage, DC output voltage and auxiliary supply - the system composition with its functional and performance requirements, the inspection methods, from visual and dimensional checks to the charging system test, and the inspection rules for type, factory and on-site inspection.
Its introduction lists the functions this part defines, among them charging, communication, data acquisition, event recording, hot standby, control, protection and safety interlock, and the indicators it sets, among them insulation, rated power, system efficiency, power factor, temperature rise, noise, DC ripple and DC voltage accuracy. Issued on 12 October 2022, it has applied since 1 May 2023.
Found what you need?
Document preview — GB/T 42005.2-2022
National Standard of the People's Republic of China
- ICS
- 29.280
- Classification
- S 35
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Environmental conditions
- 5 Power supply conditions
- 5.1 AC input voltage
- 5.2 DC output voltage
- 5.3 Auxiliary power supply
- 6 System composition and technical requirements
- 6.1 System Composition
- 6.2 Functional Requirements
- 6.3 Performance Requirements
- 7 Inspection method
- 7.1 General
- 7.2 Visual inspection
- 7.3 Dimensional and tolerance checking
- 7.4 Flag Check
- 7.5 Ground charging system test
- 8 Inspection Rules
- 8.1 General
- 8.2 Inspection classification
- 8.3 Type inspection
- 8.4 Factory inspection
- 8.5 On-site inspection
- 8.6 Inspection items
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted.
This document is Part 2 of GB/T 42005 "Energy Storage Trams for Rail Transit". GB/T 42005 has released the following 2 part.
--- Part 1: Capacitive energy storage power supply;
--- Part 2: Ground charging systems.
Introduction
Rail transit energy storage trams have been operated in large quantities in China, and relevant domestic units have mastered the energy storage power supply, charging system and other related issues.
The core technology of key components, and through years of engineering application, has a certain technical accumulation and field application experience. By refining the key Energy indicators and inspection items, combined with years of production and application experience to formulate relevant standards, will help further promote the development of related industries.
GB/T 42005 aims to specify the functional requirements, performance requirements, safety and Protection requirements, inspection methods, etc. GB/T 42005 "Rail Transportation Energy Storage Tram" is intended to be composed of two parts.
--- Part 1: Capacitive energy storage power supply. The purpose is to stipulate that the energy storage power supply needs to have a fault detection function, a communication function and a voltage balance. related requirements such as balance function; clarify key performance indicators such as energy efficiency, voltage retention capability, energy retention capability, and temperature consistency Standard; specifies the safety performance requirements of capacitor monomer, module and energy storage power supply;
Carry out test methods specific to energy storage power sources such as retention capability test, energy retention capability test, thermal runaway and temperature consistency. Regulation.
--- Part 2: Ground charging systems. The purpose is to specify the system composition, use conditions, main Functions, inspection methods, inspection rules, and clarify each function such as charging function, communication function, data acquisition, event recording and storage display.
Definition and requirements of display, hot standby function, control function, protection function, safety interlock function; clarify insulation performance, rated power, System Efficiency, Electromagnetic Compatibility, Power Factor, Temperature Rise, Noise, Thermal Standby Energy Consumption, DC Ripple, DC Voltage Accuracy, Voltage Current Balance requirements, grounding, fire protection and safety, structural requirements, performance index requirements for protection levels; system inspection points and references The standard specifies the requirements for each inspection item in the type test, factory test and field test. Rail Transit Energy Storage Tram Part 2: Ground Charging Systems
1 Scope
This document specifies the environmental conditions, power supply conditions, system composition, technical requirements, inspections of the ground charging system for rail transit energy storage trams Methods and inspection rules.
This document is applicable to the ground charging system of energy storage trams in rail transit, and similar systems other than rail transit can be implemented by reference.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.
GB/T 1094.3-2017 Power Transformers Part 3: Insulation Level, Insulation Test and Outer Insulation Air Gap
GB/T 1094.11 Power Transformers Part 11: Dry-Type Transformers
GB/T 2900.1 Basic terminology of electrical terminology
GB/T 2900.33 Electrical terminology power electronics technology
GB/T 2900.95 Electrical Terms Transformers, Voltage Regulators and Reactors
GB 3096 Acoustic Environment Quality Standard
GB/T 3859.1-2013 General requirements for semiconductor converters and grid commutated converters Part 1-1.Specification for basic requirements
GB/T 10411 DC Traction Power Supply System for Urban Rail Transit
GB/T 12325 Power Quality Supply Voltage Deviation
GB/T 13422-2013 Electrical test methods for semiconductor converters
GB/T 14549 Power Quality Harmonics of Public Grid
GB/T 15945 Power Quality Power System Frequency Deviation
GB/T 21413.1 Rail Transit Rolling Stock Electrical Equipment Part 1: General Conditions of Use and General Rules
GB/T 24338.6 Rail Transit Electromagnetic Compatibility Part 5: Emission and Immunity of Ground Power Supply Equipment and Systems
GB/T 25122.1-2018 Power converters for rail transit rolling stock Part 1: Characteristics and test methods
GB/T 36287 Urban Rail Transit Train Regenerative Braking Energy Ground Utilization System
JB/T 501 Power Transformer Test Guide
3 Terms and Definitions
GB/T 2900.1, GB/T 2900.33, GB/T 2900.95, GB/T 3859.1-2013, GB/T 10411, GB/T 14549,
GB/T 36287 and the following terms and definitions apply to this document.
3.1 Groundchargingsystemgroundchargingsystem
The ground power processing system that injects electrical energy into the on-board energy storage unit of the energy storage tram.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 1094.3-2017Power transformers -- Part 3: Insulation levels, dielectric tests and external clearances in air
- GB/T 1094.11Power transformers—Part 11: Dry-type transformers
- GB/T 2900.1Electrotechnical terminology - Fundamental terms
- GB/T 2900.33Electrotechnical terminology -- Power electronics
- GB/T 2900.95Electrotechnical terminology -- Transformers, voltage regulators and reactors
- GB 3096Chinese standard
Similar standards
How to Download GB/T 42005.2-2022
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 3096-2008 — Chinese standard
GB/T 10411-2025 — DC electric traction systems of urban rail transit
GB/T 1094.11-2022 — Power transformers—Part 11: Dry-type transformers
Secure payment via Stripe
Payments accepted
GB/T 42005.2-2022
$210.00