GB/T 32580.5-2026Railway applications - Fixed installations - AC high voltage switchgear and instrument transformers - Part 5: 27.5 kV and 2×27.5 kV metal-enclosed switchgear and controlgear (English PDF)
轨道交通 地面装置 高压交流开关设备及互感器 第5部分:27.5kV和2×27.5kV金属封闭开关设备和控制设备
This is a limited preview
Buy now to download the full PDF (40 pages)
Need quotation for your management?
Get a formal quotation for GB/T 32580.5-2026 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
January 28, 2026
Implementation date
August 1, 2026
Scope
GB/T 32580.5-2026 is the English-translated version of 轨道交通 地面装置 高压交流开关设备及互感器 第5部分:27.5kV和2×27.5kV金属封闭开关设备和控制设备.
GB/T 32580.5-2026 is the Chinese standard "Railway applications - Fixed installations - AC high voltage switchgear and instrument transformers - Part 5: 27.5 kV and 2×27.5 kV metal-enclosed switchgear and controlgear".
Its scope clause reads: This document specifies the operating conditions for 27.5kV and 2×27.5kV AC metal-enclosed switchgear and control equipment in electrified railways.
Fixed values, design and structure, test methods, inspection rules, transportation and storage, safety, and the product's environmental impact. This document applies to air-insulated indoor metal-clad enclosed switchgear and control equipment, as well as equipment with air-filled compartments and design pressures not exceeding [a certain value].
Indoor metal-enclosed switchgear and control equipment with a pressure exceeding 0.3 MPa (relative pressure). All components in metal-enclosed switchgear and controlgear are designed and tested in accordance with relevant regulations.
Found what you need?
Document preview — GB/T 32580.5-2026
National Standard of the People's Republic of China
- ICS
- 29.280
- Classification
- S 81
- Replacing
- GB/T 28428-2012
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1.Scope
- 2 Normative References
- 3.Terms and Definitions
- 4.Usage conditions 6.
- 4.1 Normal operating conditions
- 4.2 Special Usage Conditions
- 5 Rated value
- 5.1 Rated voltage (Ur) and maximum operating voltage (Umax)
- 5.2 Rated insulation level
- 5.3 Rated Frequency (fr)
- 5.4 Rated continuous current and temperature rise
- 5.8 Rated power supply voltage (Ua) of closing/opening devices and auxiliary/control circuits.
- 5.9 Rated power supply frequency of closing/opening devices and auxiliary circuits.
- 5.10 Rated inflation pressure (pre)
- 5.11 Single-phase rated arc fault current to ground (IAe)
- 5.12 Single-phase rated arc fault duration to ground (tAe)
- 5.13 Partial Discharge
- 6.Design and Structure
- 6.1 General Requirements
- 6.2 Design and Appearance
- 6.3 Requirements for gases in switchgear and controlgear
- 6.4 Grounding
- 6.5 Auxiliary equipment and control equipment
- 6.6 Power Operation
- 6.7 Energy Storage Operation
- 6.8 Operations that do not rely on human intervention
- 6.9 Operation of the trip unit
- 6.10 Nameplate
- 6.11 Interlocking device
- 6.12 Location Indicator
- 6.13 Enclosure protection rating
- 6.14 Creepage distance
- 6.15 Gas and Vacuum Sealing
- 6.16 Flame retardancy
- 6.17 Electromagnetic Compatibility (EMC)
- 6.18 Corrosion
- 6.19 Internal Fault
- 6.20 Outer shell
- 6.21 Compartment
- 6.22 Removable component
- 6.23 Requirements for minimum air gaps
- 6.24 Internal tapered sleeve (if applicable)
- 6.25 Mechanical Operation and Mechanical Characteristics
- 6.26 Loop resistance
- 6.27 Anti-condensation lotion
- 7.Test Methods
- 7.1 Design and Appearance Inspection
- 7.2 Insulation Test
- 7.3 Measurement of loop resistance
- 7.4 Continuous Current Test
- 7.5 Short-time withstand current and peak withstand current tests
- 7.6 Protection Level Verification
- 7.7 Sealing Test
- 7.8 Electromagnetic Compatibility Testing (EMC)
- 7.9 Additional tests for auxiliary and control loops
- 7.10 Electrical continuity test of grounded metal components
- 7.11 Verification of closing and breaking capabilities
- 7.12 Mechanical operation and mechanical characteristic measurement test
- 7.13 Testing of Electrical Auxiliary Devices
- 7.14 Pressure withstand test and gas state measurement of the inflatable compartment
- 7.15 Pressure test of the inflatable compartment
- 7.16 Internal Arc Test
- 8.Inspection Rule
- 8.1 Inspection Classification
- 8.2 Factory Inspection
- 8.3 Type Testing
- 8.4 Inspection Item
- 9.Transportation and storage
- 10 Safety
- 10.1 General Rule
- 10.2 Program
- 10.3 Internal electric arc aspect
- 11.Environmental impact of the product
- Appendix B (Normative) Documents Accompanying the Product
1 Scope
This document specifies the operating conditions for 27.5kV and 2×27.5kV AC metal-enclosed switchgear and control equipment in electrified railways.
Fixed values, design and structure, test methods, inspection rules, transportation and storage, safety, and the product's environmental impact.
This document applies to air-insulated indoor metal-clad enclosed switchgear and control equipment, as well as equipment with air-filled compartments and design pressures not exceeding [a certain value].
Indoor metal-enclosed switchgear and control equipment with a pressure exceeding 0.3 MPa (relative pressure).
All components in metal-enclosed switchgear and controlgear are designed and tested in accordance with relevant regulations.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.
For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.
This document.
GB/T 1985-2023 High-voltage AC disconnect switches and grounding switches
GB/T 2900.1-2008 Basic Terminology for Electrical Engineering
GB/T 2900.20-2016 Electrical Terminology. High Voltage Switchgear and Controlgear
GB/T 3906-2020 3.6kV~40.5kV AC Metal-Enclosed Switchgear and Controlgear
GB/T 4025 Basic and safety rules for human-machine interface signs and markings; coding rules for indicators and operating devices.
GB/T 4208-2017 Degrees of protection provided by enclosures (IP code)
GB/T 4728.1 Graphical symbols for electrical diagrams - Part 1.General requirements
GB 4824-2025 Limits and methods of measurement for radio frequency interference characteristics of industrial, scientific and medical devices
GB/T 5465.2-2023 Graphical symbols for electrical equipment - Part 2.Graphical symbols
GB/T 11021 Electrical insulation heat resistance and representation method
GB/T 11022-2020 Common Technical Requirements for High Voltage AC Switchgear and Controlgear
GB/T 16927.1-2011 High Voltage Testing Techniques – Part 1.General Definitions and Test Requirements
GB/T 16935.1-2023 Insulation Coordination of Equipment in Low-Voltage Power Supply Systems - Part 1.Principles, Requirements and Tests
GB/T 17626.4 Electromagnetic compatibility testing and measurement techniques - Electrical fast transient/burst immunity test
GB/T 17626.11-2023 Electromagnetic compatibility testing and measurement techniques – Part 11.Input current for each phase less than or equal to
Voltage sag, short interruption and voltage variation immunity test of 16A equipment
GB/T 17626.17-2005 Electromagnetic compatibility testing and measurement techniques - DC power supply input port ripple immunity test
GB/T 17626.18 Electromagnetic compatibility testing and measurement techniques - Damped oscillating wave immunity test
GB/T 17626.29-2006 Electromagnetic Compatibility Testing and Measurement Techniques - DC Power Supply Input Port Voltage Sags, Short Interruptions, and
Immunity test for voltage variation
GB/T 17627 High-voltage testing techniques for low-voltage electrical equipment. definitions, test and procedural requirements, and test equipment.
GB/T 25840-2010 specifies the guidelines for permissible temperature rise of electrical equipment components (particularly terminals).
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 40 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 1985-2023High-voltage alternating current disconnectors and earthing switches
- GB/T 2900.1-2008Electrotechnical terminology - Fundamental terms
- GB/T 2900.20-2016Electrotechnical terminology -- High-voltage switchgear and controlgear
- GB/T 3906-2020Alternating-current metal-enclosed switchgear and controlgear for rated voltages above 3.6 kV and up to and including 40.5 kV
- GB/T 4025Basic and safety principles for man-machine interface, marking and identification -- Coding principles for indicators and actuators
- GB/T 4208-2017Degrees of protection provided by enclosures (IP code)
Editions of GB/T 32580.5
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 32580.5-2026 | Railway applications - Fixed installations - AC high voltage switchgear and instrument transformers - Part 5: 27.5 kV and 2×27.5 kV metal-enclosed switchgear and controlgear | current edition | Current |
| GB/T 28428-2012 | Railway applications - Fixed installations - AC high voltage switchgear and instrument transformers - Part 5: 27.5 kV and 2×27.5 kV metal-enclosed switchgear and controlgear | previous edition | Superseded |
This page sells the current edition, GB/T 32580.5-2026. Earlier editions are listed for reference only.
How to Download GB/T 32580.5-2026
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 4824-2025 — Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
GB/T 11021-2014 — Electrical insulation -- Thermal evaluation and designation
GB/T 11022-2020 — Common specifications for high-voltage alternating-current switchgear and controlgear standards
Secure payment via Stripe
Payments accepted
GB/T 32580.5-2026