Scope

GB/T 41344.1-2022 is the English-translated version of 机械安全 风险预警 第1部分:通则.

GB/T 41344.1-2022 is the first part of the Chinese standard on risk early warning in machinery safety, and it gives the general requirements.

It sets the basic principles and the basic requirements of an early warning, the process it follows, the monitoring on which it rests, the way the warnings are organised into a system and the measures taken when one is raised.

It applies to risk early warning under the conditions of the people, the machine and the environment and of their combined effect. Machine builders, plant operators and safety engineers use it. Issued on 9 March 2022, it has applied since 1 October 2022.

Found what you need?

Document preview — GB/T 41344.1-2022

National Standard of the People's Republic of China

ICS
13.110
Classification
J 09

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • Introduction5
  • 1 Scope7
  • 2 Normative references7
  • 3 Terms and definitions7
  • 4 Basic principles9
  • 5 Basic requirements9
  • 6 Overview of risk early-warning9
  • 7 Risk assessment13
  • 8 Cost-benefit analysis14
  • 9 Early-warning monitoring14
  • 10 Early-warning systematics16
  • 11 Early-warning measures17
  • Appendix A (Informative) Elements of risk early-warning and their relationships18
  • Appendix B (Informative) Guidelines for the establishment of risk early-warning systems19
  • References21

1 Scope

This document specifies the basic principles, basic requirements, risk early-warning process, early-warning monitoring, early-warning systematics, and early-warning measures of risk warning of machinery safety.

This document applies to risk early-warning under the conditions of people, machines, the environment, and their combined effects.

2 Normative references

The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) is applicable to this standard.

GB/T 15706-2012 Safety of machinery -- General principles for design -- Risk assessment and risk reduction

GB/T 16855.1 Safety of machinery -- Safety-related parts of control systems -- Part 1: General principles for design

GB/T 30174-2013 Safety of machinery -- Terms

GB/T 41344.2-2022 Safety of machinery -- Risk early-warning -- Part 2: Monitor

GB/T 41344.3-2022 Safety of machinery -- Risk early-warning -- Part 3: Classification

GB/T 41344.4-2022 Safety of machinery -- Risk early-warning -- Part 4: Measures

3 Terms and definitions

The terms and definitions defined in GB/T 30174-2013 and the followings apply to this document.

3.1 Risk early-warning

The process in which the dangerous state (3.9) that may be triggered by people, machines, the environment, and their combined effects is predicted and alarmed according to the levels, at the same time, the appropriate measures are timely taken to achieve a safe state (3.8).

Note 1: Risk early-warning is generally achieved by establishing a risk early-warning system.

Note 2: See Appendix A for risk early-warning elements and their relationships.

3.2 Risk early-warning system

The system is composed of software and hardware, through the online data monitoring and evaluation of the elements such as people, machines, the environment, and their combined effects, it can predict the development trend of risks, and send out the alarm according to the level for the possible unsafe state, and take corresponding preventive measures in time to avoid the occurrence of dangerous states (3.9) to the greatest extent possible.

3.3 Risk value

A numerical value obtained by the quantitative calculation method to characterize the severity of a risk.

3.4 Early-warning monitoring

A process in which the information and operation data on elements such as people, machines, and the environment are collected through monitoring methods, operated, and analyzed; the outputs are used for calculating the risk values.

3.5 Level of early-warning

The risk level classified according to the calculation result of the risk value.

3.6 Early-warning systematics

The process of determining the warning level based on the risk value.

3.7 Early-warning measures

The means and methods adopted according to the level of early-warning to reduce risks.

3.8 Safety status

The situation in which the risks of personal injury, property damage, or damage to the working environment that may be caused by people, machines, the environment, and their combined effects are within an acceptable range.

8 Cost-benefit analysis

Cost-benefit analysis helps to establish accurate key performance indices and benchmarks to measure the feasibility and effectiveness of any risk early-warning system. The main considered factors are:

--- The cost of loss of personnel and machines due to risks;

--- The cost of production loss;

--- The cost of affected production efficiency;

--- The whole life cycle cost of the risk early-warning system.

9 Early-warning monitoring

Early-warning monitoring mainly includes the determination of monitoring variables, data collection, data manipulation, data analysis, data output, etc. The following contents need to be considered.

a) Determination of monitoring variables. The monitoring variables mainly include the status information of people, the status information of machines, and the status information of the environment. The factors to be considered are:

--- The main factors that generate the risk;

--- The feasibility of technical realization;

--- The economy of monitoring.

b) Determination of measuring technique. There may be one or more measuring techniques that are applicable to a specific monitoring variable; the factors to be considered are:

--- The total value of measuring the monitoring variables;

--- The time average of measuring the monitoring variables;

--- The time interval of measurement;

--- Data collection rate;

--- Monitoring method;

--- Monitoring system;

--- High sensitivity to changes in the status information of monitoring variables;

--- Repeatability of the measurement;

--- Installation method of the monitoring system;

--- For the unmeasurable, alternative measures shall be adopted;

--- Economy of the monitoring system.

c) Determination of monitored area. The position where the output data of the status information of the monitoring variables are stable shall be selected as the monitored area; the factors that need to be considered are known as:

--- Security;

--- Selection of the sensors and their installation location;

--- Reduction of the sensitivity to other influences;

--- Signal attenuation or loss;

--- Environment;

--- Economy.

d) The accurate judgment of the measurement values of the monitoring variables.

The factors that need to be considered in the judgment of the accuracy of measurement parameters of risk early-warning monitoring variables for the safety of machinery are:

--- The errors in a measuring system, such as poor sensor installation, sensor failure, signal line failure, etc.;

--- The format of data output;

--- Record of measured values;

--- Unit of measured values;

--- Date and time of measured values;

--- Data processing method of measured values;

--- Correction of measurement parameters of monitoring variables.

The risk early-warning monitoring of the safety of machinery shall meet the requirements of GB/T 41344.2-2022.

10 Early-warning systematics

Early-warning systematics mainly includes determination of risk value calculation model, weight determination, determination of the boundary of the early-warning level, calculation of risk value, the output of early-warning level, etc.; the followings need to be considered.

a) Determination of calculation model of risk values. Comprehensively consider the three elements of people, machines, and the environment, and select the appropriate calculation model of risk values according to the actual needs. The factors that need to be considered in the model are as follows:

--- Determination of element indices;

--- People, machines, the environment, and their combined effects;

--- Dynamics of element weights;

--- Normalization of model calculation results.

b) Weight determination. The weight of the element index represents the severity of the risk that may be generated by the element under the conditions of people, machines, the environment, and their combined effects; the factors that need to be considered are:

--- Suitable weight determination method;

--- Weight of people;

--- Weight of Machines;

--- Weight of the environment;

--- Normalization of weight.

c) Output of early-warning level. The output of the early-warning level is the input of the early-warning measure, and the factors that need to be considered are:

--- The form of release;

--- The object of release.

The risk early-warning systematics of the safety of machinery shall meet the requirements of GB/T 41344.3-2022.

B.1 System composition

The realization of risk early-warning of mechanical safety depends on the risk early- warning system. The risk early-warning system is aimed at industrial sites; it predicts the development trend of risks through online data monitoring and evaluation, issues warnings according to levels of possible unsafe conditions, and takes corresponding preventive measures in time to achieve the purpose of reducing risks.

A risk early-warning system generally consists of an early-warning monitoring system, an early-warning classification system, and an early-warning measure system.

The early-warning monitoring system mainly realizes the monitoring of risk elements; the early-warning classification system mainly determines the levels of risks according to the input values of the early-warning monitoring system; the early-warning measure system takes corresponding level measures according to the levels of risks.

The risk early-warning systems mainly include permanent installation systems, semi- permanent systems, or portable systems according to the installation form.

B.2 Establishment principles

The establishment of a risk early-warning system should follow the following principles:

--- The establishment of an early-warning monitoring system needs to be combined with the actual situation; the flexibility to different monitoring situations needs to be considered, and the main factors affecting the safety of machinery need to be grasped;

--- About economy, mainly consider the criticality of machine operation, the cost of machine downtime, the cost of sudden failure of the machine, the cost of the machine, and the cost of the early-warning system to establish a suitable risk early-warning system;

--- About operability, appropriate risk early-warning methods shall be adopted according to different situations of the enterprise, so that the risk early-warning is pertinent and operable;

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 41344.1-2022

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
21 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 41344.1-2022

$240.00